Project Details

Search


File Number
PPR2124
Project Name
Maltese - Rolling Thunder Lot 11 PPR
Description
Commercial Site Development Plan
Parcels
5311101011 5311101011
Applicant
Oliver Watts Consulting
Ollie Watts ( olliewatts@aol.com )
(719) 593-0173
Ollie Watts ( olliewatts@aol.com )
(719) 593-0173
File Prefix
PPR - Plot Plan Review
Year
2021
Project Manager
Remove Ashlyn Mathy
Status
Closed
Created
2/2/2021 1:11:02 PM

View: Review Comments


Approved Documents (10)

Link Document
View Grading & Erosion Control checklist
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View PBMP Applicability Form
View SWMP checklist
View Grading & Erosion Control Plan
View Site Development Plan
View Detention Maintenance Agreement (MS WORD version required - attachments included)
View Drainage Letter
View Traffic Memo


Additional Documents (1)

Link Document Comment
View Private Detention Basin - Recorded - 222142582


Review Documents (32)

Link Document Date
View Application/Petition Form 10/6/2021 2:08:34 PM
View Grading & Erosion Control checklist 10/12/2022 1:58:22 PM
View Legal Description (MS WORD Version required) 4/8/2021 8:00:14 AM
View Letter of Intent 2/21/2022 11:02:41 AM
View Title Commitment (Current within 30 days of submittal) 5/26/2021 10:56:31 AM
View Vicinity/Location Map 4/21/2021 10:37:16 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 12/30/2021 2:27:41 PM
View Financial Assurance Forms 8/19/2022 1:07:59 PM
View Floor Plans (24" x 36") 9/22/2021 9:05:27 AM
View MS4 Post Construction Form 10/14/2021 1:04:41 PM
View PBMP Applicability Form 9/28/2022 3:24:53 PM
View PDB/BMP Operations & Maintenance Manual 10/12/2022 1:58:21 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 10/14/2021 4:46:26 PM
View SWMP checklist 10/12/2022 1:58:23 PM
View Grading & Erosion Control Plan 10/12/2022 1:58:20 PM
View Landscape Plan drawings 8/30/2021 9:08:10 AM
View Site Development Plan 6/16/2022 2:58:10 PM
View Storm Water Management Plan (SWMP) 1/4/2022 9:04:33 AM
View Commitment letter from waste water service provider 5/12/2021 3:36:17 PM
View Commitment letter from water service provider 5/11/2022 3:43:10 PM
View Electric Provider Commitment Letter 4/8/2021 8:00:10 AM
View Fire Commitment Letter 4/8/2021 8:03:18 AM
View Natural Gas Commitment Letter 4/8/2021 8:00:15 AM
View Soils & Geology Report 4/8/2021 8:00:11 AM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 9/28/2022 3:20:45 PM
View Drainage Letter 9/28/2022 3:18:34 PM
View Elevation Plans 4/21/2021 10:37:14 AM
View Email to County on Submittal 9/28/2022 3:28:32 PM
View Pond I & M 1/4/2022 9:04:34 AM
View Pond legal and sketch 10/14/2021 2:24:23 PM
View Traffic Memo 7/21/2022 8:02:53 AM
View Utility plan 6/15/2022 8:11:31 AM



Events (127)

Date Comment
1/12/2023 8:08:00 AM Project Closed
1/12/2023 8:08:00 AM Project Approved: 1/12/2023
12/13/2022 1:46:01 PM Project Manager Assigned: Ashlyn Mathy
12/12/2022 10:06:45 AM Project Manager Assigned: Kari Parsons
10/17/2022 10:20:48 AM Project Ready for Approval requests. Review Comment period is complete.
10/17/2022 10:20:26 AM Request for Review Comments returned by PCD Project Manager
10/16/2022 9:01:36 AM Request for Review Comments returned by EPC Stormwater Review
10/13/2022 6:20:06 PM Request for Review Comments returned by PCD Engineering Division
10/12/2022 2:01:12 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/12/2022 2:01:11 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Kylie Bagley on behalf of PCD Project Manager
10/12/2022 2:01:08 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/29/2022 5:22:58 PM Request for Review Comments returned by PCD Engineering Division
9/29/2022 4:15:25 PM Request for Review Comments returned by County Attorney - Development Review
9/29/2022 11:47:45 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/29/2022 11:47:44 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
9/29/2022 11:47:43 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Kylie Bagley on behalf of PCD Project Manager
9/29/2022 11:47:40 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/28/2022 3:54:41 PM Submission Triaged
9/28/2022 3:28:45 PM Submission received from Applicant
9/16/2022 1:12:00 PM Submission request sent to Applicant
9/15/2022 4:56:59 PM Request for Review Comments returned by EPC Stormwater Review
9/14/2022 7:48:20 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/13/2022 5:29:24 PM Request for Review Comments returned by PCD Engineering Division
9/13/2022 10:18:55 AM Request for Review Comments returned by County Attorney - Development Review
9/13/2022 9:50:41 AM Request for Review Comments returned by PCD Project Manager
9/9/2022 12:02:36 PM Request for Review Comments sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
9/7/2022 1:25:23 PM Request for Review Comments returned by County Attorney - Development Review
8/22/2022 10:45:46 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
8/22/2022 10:45:45 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Kylie Bagley on behalf of PCD Project Manager
8/22/2022 10:45:42 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/22/2022 10:44:05 AM Submission Triaged
8/19/2022 1:09:39 PM Submission received from Applicant
7/25/2022 2:56:06 PM Request for Review Comments returned by EPC Stormwater Review
7/14/2022 3:14:48 PM Submission request sent to Applicant
7/14/2022 3:14:18 PM Request for Review Comments returned by PCD Project Manager
7/14/2022 11:02:02 AM Request for Review Comments returned by County Attorney - Development Review
7/12/2022 5:31:32 PM Request for Review Comments returned by PCD Engineering Division
6/20/2022 9:48:03 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/16/2022 3:05:53 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/16/2022 3:05:51 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/16/2022 3:05:50 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
6/16/2022 3:05:49 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Kylie Bagley on behalf of PCD Project Manager
6/16/2022 3:05:47 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/16/2022 3:01:18 PM Submission Triaged
6/15/2022 8:16:36 AM Submission received from Applicant
6/6/2022 10:49:53 AM Submission request sent to Applicant
4/12/2022 10:32:50 AM Project Manager Assigned: Kylie Bagley
4/8/2022 9:38:43 AM Submission request sent to Applicant
4/8/2022 9:38:08 AM Request for Review Comments returned by PCD Project Manager
4/5/2022 8:18:51 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
3/30/2022 12:58:25 PM Request for Review Comments returned by EPC Stormwater Review
3/29/2022 7:49:41 AM Request for Review Comments returned by PCD Project Manager
3/29/2022 7:16:41 AM Request for Review Comments email resent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/24/2022 11:30:24 AM Request for Review Comments returned by PCD Engineering Division
3/23/2022 4:52:14 PM Request for Review Comments returned by EPC Stormwater Review
3/21/2022 12:55:36 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/3/2022 12:51:45 PM Request for Review Comments returned by County Attorney - Development Review
3/1/2022 7:15:23 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/23/2022 2:31:35 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by General Email on behalf of Mountain View Electric Association, Inc.
2/23/2022 2:31:33 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/23/2022 2:31:29 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
2/23/2022 2:31:27 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
2/23/2022 2:31:25 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
2/23/2022 2:31:19 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/23/2022 2:30:21 PM Submission Triaged
2/21/2022 11:02:49 AM Submission received from Applicant
1/4/2022 8:54:28 AM Submission request sent to Applicant
11/16/2021 4:06:10 PM Request for Review Comments returned by EPC Stormwater Review
11/16/2021 3:49:13 PM Submission request sent to Applicant
11/16/2021 3:48:29 PM Request for Review Comments returned by PCD Project Manager
11/15/2021 5:34:23 PM Request for Review Comments returned by PCD Engineering Division
11/11/2021 1:59:24 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/28/2021 7:23:01 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/15/2021 3:23:38 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by General Email on behalf of Mountain View Electric Association, Inc.
10/15/2021 3:23:36 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/15/2021 3:23:30 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/15/2021 3:23:27 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
10/15/2021 3:23:23 PM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/15/2021 3:21:29 PM Submission Triaged
10/14/2021 4:47:13 PM Submission received from Applicant
8/19/2021 2:31:11 PM Request for Review Comments returned by PCD Project Manager
8/19/2021 2:30:29 PM Request for Review Comments email resent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
7/22/2021 5:41:11 PM Submission request sent to Applicant
7/22/2021 5:38:23 PM Request for Review Comments returned by PCD Project Manager
7/22/2021 5:32:38 PM Request for Review Comments email resent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
7/20/2021 10:35:24 PM Request for Review Comments returned by PCD Engineering Division
7/20/2021 10:42:50 AM Request for Review Comments returned by EPC Stormwater Review
7/19/2021 2:37:06 PM Request for Review Comments returned by EPC Parks Department
7/19/2021 1:10:31 PM Request for Review Comments returned by PCD Project Manager
7/19/2021 1:04:57 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/15/2021 4:04:06 PM Request for Review Comments returned by Pikes Peak Regional Building Department
7/12/2021 11:35:49 PM Request for Review Comments returned by County Attorney - Development Review
6/25/2021 1:57:19 PM Request for Review Comments returned by EPC Environmental Services
6/23/2021 4:41:15 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/21/2021 2:22:55 PM Request for Review Comments returned by EPC Code Enforcement
6/21/2021 11:08:13 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/18/2021 8:34:36 AM Request for Review Comments returned by Woodmen Road Metro
6/18/2021 8:05:17 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
6/18/2021 8:05:15 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by General Email on behalf of Mountain View Electric Association, Inc.
6/18/2021 8:05:13 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Melissa Andrews on behalf of Falcon School District 49
6/18/2021 8:05:11 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Josh Miller on behalf of Falcon Highlands Metro
6/18/2021 8:05:09 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
6/18/2021 8:05:07 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/18/2021 8:05:03 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Pamela Davidson on behalf of Central CO Conservation District
6/18/2021 8:05:01 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
6/18/2021 8:04:59 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/18/2021 8:04:57 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/18/2021 8:04:51 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/18/2021 8:04:49 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/18/2021 8:04:47 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by on behalf of EPC Parks Department
6/18/2021 8:04:45 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Catherine McGarvy on behalf of EPC Health Department
6/18/2021 8:04:37 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Kathy Andrew on behalf of EPC Environmental Services
6/18/2021 8:04:35 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Mindy Madden on behalf of EPC Code Enforcement
6/18/2021 8:04:33 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Lori Seago on behalf of County Attorney - Development Review
6/18/2021 8:04:31 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by John Green on behalf of PCD Project Manager
6/18/2021 8:04:29 AM Request for Review Comments email sent for Project Maltese - Rolling Thunder Lot 11 PPR for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/14/2021 11:21:27 AM Fees paid: 6/14/2021 (Receipt: 1004566)
5/26/2021 2:52:15 PM Payment Request sent: 5/26/2021
5/26/2021 2:52:15 PM File # Assigned: PPR2124
5/26/2021 2:52:07 PM Submission Triaged
5/26/2021 10:56:40 AM Submission received from Applicant
5/22/2021 8:57:09 PM Submission request sent to Applicant
5/22/2021 8:56:49 PM Submission Triaged
5/20/2021 8:54:08 AM Submission received from Applicant
2/8/2021 7:51:23 AM Submission request sent to Applicant
2/2/2021 1:11:14 PM Project Manager Assigned: John Green
2/2/2021 1:11:13 PM Project Created