Project Review Comments

Back to List


Project Name
Discount Tire - Falcon Marketplace Site Development Plan
Description
Major Commercial Site Development Plan for Firestone at Falcon Marketplace
Location
Parcels
5301402002 5301402002
Applicant
Kimley-Horn
Joseph Menke ( Joseph.Menke@kimley-horn.com )
(719) 284-7310
Joseph Menke ( Joseph.Menke@kimley-horn.com )
(719) 284-7310
EA Number
EA20162
File Number
PPR2112
Project Manager
Ryan Howser
Status
Closed
Created
12/4/2020 2:24:25 PM

View: Project Documents



Review Comments (38)

Link Agency Comment
County Attorney - Development Review
10/11/2021 8:12:21 PM
No further comments from County Attorney - Development Review 10/11/2021 8:12:21 PM
PCD Project Manager
10/1/2021 11:33:53 AM
Planning Division has no further comments at this time. 10/1/2021 11:33:53 AM
PCD Project Manager
9/28/2021 1:39:19 PM
Please add the following note to the site development plan front page: Owner is aware that the access permits (AP211569, AP21170) are subject to conditions of approval. 9/28/2021 1:39:19 PM
PCD Engineering Division
9/28/2021 12:44:59 PM
No additional comments.
The engineering documents will be uploaded onto EDARP once approved by the ECM Administrator.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
9/28/2021 12:44:59 PM
View County Attorney - Development Review
9/20/2021 11:32:32 AM
Please use the attached template escrow agreement, insert the correct developer's name into the introductory paragraph, updating the developer's signature block, and inserting the correct escrow amount into paragraph 2.

Do not insert the dates into the introductory paragraph or paragraphs 4 & 5; they will be completed on the date the site development plan is approved.
9/20/2021 11:32:32 AM
View PCD Project Manager
5/20/2021 5:04:07 PM
PCD Engineering - Drainage Report comments attached. 5/20/2021 5:04:07 PM
PCD Engineering Division
5/20/2021 4:28:38 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-Drainage Report

Provided the minor comments are addressed, signed (by owner and engineer) documents may be provided with the re-submittal.

Minor comment on the Traffic study has been provided with the special use application AL214.
PCD engineering comments on the following documents have been resolved:
-Site Development Plan
-Letter of Intent
-Grading and Erosion Control Plan
-Construction Documents
-ESQCP

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
5/20/2021 4:28:38 PM
View Mountain View Electric Association, Inc.
5/10/2021 3:50:09 PM
See attached comments 5/10/2021 3:50:09 PM
EPC Stormwater Review
5/14/2021 9:55:39 AM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist
- SWMP

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
5/14/2021 9:55:39 AM
Woodmen Road Metro
4/7/2021 12:10:52 PM
This property is located within the Woodmen Road Metropolitan District or its service area.
The District assess platting and building permit fees for new development in the District and requires developed parcels to be included in the Metro District boundaries through an Inclusion process; the District assess a mill levy on property in the District.

The fees for 2020 are:
Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial:
Destination/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
4/7/2021 12:10:52 PM
View PCD Project Manager
4/2/2021 1:47:40 PM
Site development plan comments attached. Also includes PCD Engineering comments. 4/2/2021 1:47:40 PM
View PCD Project Manager
4/2/2021 1:47:12 PM
Letter of intent comment attached. 4/2/2021 1:47:12 PM
View PCD Project Manager
4/2/2021 1:46:47 PM
GEC plan comments attached. Includes PCD Engineering and EPC Stormwater comments. 4/2/2021 1:46:47 PM
View PCD Project Manager
4/2/2021 1:45:39 PM
FAE comments attached. Includes EPC Stormwater comments. 4/2/2021 1:45:39 PM
View PCD Project Manager
4/2/2021 1:45:18 PM
ESQCP comments attached. Includes PCD Engineering and EPC Stormwater comments. 4/2/2021 1:45:18 PM
View PCD Project Manager
4/2/2021 1:44:58 PM
Drainage report comments attached. Includes PCD Engineering and EPC Stormwater comments. 4/2/2021 1:44:58 PM
View PCD Project Manager
4/2/2021 1:44:31 PM
Construction drawing comments attached. Includes PCD Engineering comments. 4/2/2021 1:44:31 PM
PCD Engineering Division
4/2/2021 11:37:39 AM
Review 1 comments on the following documents will be uploaded by the project manager:
-Site Development Plan
-Letter of Intent
-Drainage Report
-Grading and Erosion Control Plan
-Construction Documents
-ESQCP

Comments on the Traffic study were provided with the special use application AL214.


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
4/2/2021 11:37:39 AM
View Mountain View Electric Association, Inc.
3/25/2021 4:56:41 PM
See MVEA Comments 3/25/2021 4:56:41 PM
Woodmen Hills Metro
3/22/2021 12:08:52 PM
Woodmen Hills Metropolitan District has reviewed the plans. Note that the property had a 1 inch domestic water tap designated, a 1.5 inch tap will have to be applied for and a Water Acquisition Fee will apply. Another concern is the sanitary sewer service crosses a storm sewer. Details to be provided on construction plans. Overall WHMD approves the project. 3/22/2021 12:08:52 PM
View PCD Project Manager
3/19/2021 11:02:24 AM
Sign plan comments attached. Note separate permit is required for sign approval. 3/19/2021 11:02:24 AM
View PCD Project Manager
3/19/2021 11:02:04 AM
Lighting plan comments attached. 3/19/2021 11:02:04 AM
View PCD Project Manager
3/19/2021 11:01:44 AM
Landscape plan comments attached. 3/19/2021 11:01:44 AM
PCD Project Manager
3/19/2021 10:51:57 AM
All outstanding plat issues need to be completed for Final Plat prior to site development plan approval. LOMR must be finalized prior to building permit authorization for any lots within Falcon Marketplace. 3/19/2021 10:51:57 AM
Pikes Peak Regional Building Department
3/19/2021 10:48:36 AM
Enumerations has no comment. 3/19/2021 10:48:36 AM
County Attorney - Development Review
3/18/2021 10:40:50 AM
No comments from County Attorney - Development Review at this time. 3/18/2021 10:40:50 AM
View El Paso County Conservation Dist
3/17/2021 7:36:30 AM
3/17/2021 7:36:30 AM
View El Paso County Conservation Dist
3/17/2021 7:36:04 AM
3/17/2021 7:36:04 AM
View Falcon Fire Protection District
3/16/2021 2:56:04 PM
3/16/2021 2:56:04 PM
911 Authority - El Paso/Teller County
3/11/2021 10:37:38 AM
No new street names requested on this submittal.
No action for E911.
Thank you.
Justin
3/11/2021 10:37:38 AM
View EPC Stormwater Review
3/10/2021 11:04:57 AM
SWMP_V1 3/10/2021 11:04:57 AM
View EPC Stormwater Review
3/10/2021 11:01:46 AM
SWMP checklist_V1 3/10/2021 11:01:46 AM
View EPC Stormwater Review
3/10/2021 11:01:33 AM
PBMP Applicability Form_V1 3/10/2021 11:01:33 AM
View EPC Stormwater Review
3/10/2021 11:01:05 AM
Grading & Erosion Control checklist_V1 3/10/2021 11:01:05 AM
EPC Stormwater Review
3/9/2021 5:29:45 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist
- SWMP

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
3/9/2021 5:29:45 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/4/2021 7:11:46 PM
Hey Ryan,

I am finished with CSU's review for the subject application. CSU has no action items and approval can be recommended.

Thanks,

Ryne Solberg
rsolberg@csu.org
3/4/2021 7:11:46 PM
Upper Black Squirrel Creek GWMD
3/3/2021 2:24:45 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future if needed. 3/3/2021 2:24:45 PM
RBD Floodplain
2/26/2021 1:01:41 PM
project is not in the floodplain , no comment 2/26/2021 1:01:41 PM