Project Review Comments

Back to List


Project Name
Viewpoint Estates Filing No. 2 Final Plat
Description
A request to vacate and replat 2 lots into 7 lots
Location
21209 CHESLEY DR 21307 CHESLEY DR
Parcels
3410009001 3410009001 3410010001 3410010001
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA19218
File Number
SF2142
Project Manager
Ryan Howser
Status
Active
Created
4/14/2020 4:10:33 PM

View: Project Documents



Review Comments (54)

Link Agency Comment
View PCD Project Manager
4/16/2024 1:13:10 PM
V4: Final Plat comments 4/16/2024 1:13:10 PM
PCD Project Manager
4/16/2024 1:12:47 PM
Review 4: Planning Division has comments on thew following documents:
- Final Plat
4/16/2024 1:12:47 PM
View EPC Stormwater Review
4/15/2024 4:48:29 PM
O&M Manual 4/15/2024 4:48:29 PM
PCD Engineering Division
4/15/2024 4:25:36 PM
Engineer Review Ver.4

Engineer Comments resolved on the following documents:
1. Final Plat Drawings_V4
2. Drainage Report_V4
Small typos on Final Plat to be corrected prior to signing mylar.
2024 Drainage basin fees due at time of plat recording.
Road Impact fees to be paid at time of building permit.
Pending SW Dept review Drainage report will be forwarded for approval.


Thank you

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
4/15/2024 4:25:36 PM
EPC Stormwater Review
4/15/2024 4:48:46 PM
Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- O&M Manual

EPC DPW Stormwater comments have been resolved on the following documents:
- Detention Maintenance Agreement (no comments from stormwater at this time but the County Attorney will review and provide feedback)
- Drainage Letter
- PBMP

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
4/15/2024 4:48:46 PM
Ellicott Fire Protection District
4/4/2024 8:32:13 AM
The Ellicott Fire Department agrees with this Fire Protection report and will require the post Hydatnt as indicated. No other ojgetionst noted.
Mark Stanwood
Ellicott Fire
4/4/2024 8:32:13 AM
Ellicott Fire Protection District
1/19/2024 1:20:28 PM
Did not recive notification of this. Prior to appoval of the final plat the Ellicott Fire Department requires a utility plan showing water lines and the purposed Post Fire Hydrant. The design of the post fire hydrant is required for approval - genneraly the minimum fire hydrant is a dual 2.5 IN configuration. Normal;ly the minimum fire flow would be 1,000 GPM, there are options for a reduced fire flow. Please advise. A $100.00 reeview fee is required to be paid to the Ellicott Fire Department at 75 N Ellicott Hwy, Calhan, CO 80808. Pleas list the project name 1/19/2024 1:20:28 PM
County Attorney - Water
1/18/2024 11:36:00 AM
-Please re-issue the Commitment Letter as the letter is from 2021, if possible, please include the amount of the commitment in acre-feet.
-Please update the Water Resources Report to comply with Sections 8.4.7 (B)(1)(c) of the Land Development Code and upload a copy of the 1988 Water Agreement mentioned with the WRR.
-The Colorado Division of Water Resources letter is uploaded in the preliminary plan file, but not in this one - please be sure to upload it here.
-Lastly, because no irrigation demand has been identified in the required documentation - the report will require that the covenants prohibit irrigation. Therefore, if irrigation is desired, all documents should be updated to reflect the amount. Thank you.
1/18/2024 11:36:00 AM
View PCD Project Manager
1/18/2024 10:34:54 AM
V3: PDB/BMP O&M Manual (includes markup summary) 1/18/2024 10:34:54 AM
View PCD Project Manager
1/18/2024 10:34:31 AM
V3: PBMP Form 1/18/2024 10:34:31 AM
View PCD Project Manager
1/18/2024 10:34:04 AM
V3: Final Plat 1/18/2024 10:34:04 AM
View PCD Project Manager
1/18/2024 10:33:43 AM
V3: Drainage Report (includes markup summary) 1/18/2024 10:33:43 AM
View PCD Project Manager
1/18/2024 10:33:20 AM
V3: Detention Maintenance Agreement 1/18/2024 10:33:20 AM
PCD Project Manager
1/18/2024 10:30:57 AM
Review 3: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Final Plat (includes Engineering comments)

PCD Project Manager has also uploaded the following documents with Engineering and Stormwater comments:
- Drainage Letter
- Detention Maintenance Agreement
- PDB-BMP O&M Manual
- PBMP Form
1/18/2024 10:30:57 AM
PCD Engineering Division
1/18/2024 10:21:14 AM
Engineer Review Ver.3

Please see engineer comments on the following documents.
1. Final Plat Drawings_V3
2. Drainage Report_V3 Please update bridge fee amount and sign/stamp report

Thank you

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
1/18/2024 10:21:14 AM
EPC Stormwater Review
1/17/2024 10:12:24 AM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the project manager):
- Drainage Letter
- Detention Maintenance Agreement
- PBMP
- O&M Manual

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
1/17/2024 10:12:24 AM
Colorado Division of Water Resources
1/5/2024 2:09:20 PM
No updated water supply information was submitted with this referral. Therefore, the previous letter of acceptance should be sufficient. 1/5/2024 2:09:20 PM
View EPC Health Department
4/21/2023 5:23:11 PM
4/21/2023 5:23:11 PM
View EPC Stormwater Review
4/3/2023 9:11:47 AM
Drainage Letter 4/3/2023 9:11:47 AM
Pikes Peak Regional Building Department
3/30/2023 9:04:21 AM
No further comments.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
3/30/2023 9:04:21 AM
EPC Stormwater Review
4/3/2023 9:11:28 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter

EPC DPW Stormwater comments have been resolved on the following documents:
- Final Plat Drawings

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
glennreese@elpasoco.com

Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
4/3/2023 9:11:28 AM
View PCD Project Manager
3/30/2023 7:30:26 AM
LOI comments - V2 3/30/2023 7:30:26 AM
View PCD Project Manager
3/30/2023 7:30:09 AM
Final plat comments - V2 3/30/2023 7:30:09 AM
PCD Project Manager
3/30/2023 7:29:31 AM
Review #2: PCD Planning comments have been provided on the following documents (in green):

- Letter of Intent
- Final Plat drawings
3/30/2023 7:29:31 AM
PCD Engineering Division
3/29/2023 2:56:07 PM
Engineer Review Ver.2

Please see engineer comments on the following documents. Planner to upload documents.
1. Final Plat Drawings V2 Planner to upload documents.
2. Letter of Intent V2 Planner to upload documents.
3. PBMP Form V1. Correct Part III Question #1 should be marked "NO" . Remainder of form is correct. Please resubmit.
4. A Detention Basin Maintenance Agreement and O&M Manual submission is needed.

Thank you

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
3/29/2023 2:56:07 PM
Ellicott Fire Protection District
3/9/2023 1:40:16 PM
Disapproved - Please respond to the below comments:
The Fire Protection Report is not correct and is misleading. The Ellicott Fire Commitment Letter paragraph 3 is the only authorized Fire Protection Report to be approved by the fire district. We have previously discussed this with the El Paso County Planning Department and no other information is to be released publicly.

Water Supply – Fire Protection water supply is required. 2 options – The 1st Option is a 30,000 Gallon Cistern; this would have to be located near the intersection of Chesley Dr & Antelope Dr and on a portion of Lot 4 or Lot 5. The 2nd Option is to connect Fire Hydrants to the current water system assuming the main is at least a 4 IN. A total of 3 fire hydrants would be required. One Fire hydrant at the intersection of Chesley Dr & Antelope Dr and two more hydrants one 1,000 FT to the East and the other 1,000 Ft to the West. This was not clearly addressed in the Water Service Commitment – Separate Water Utility plans need to be approved by the Fire District. Locations of Cisterns or hydrants is required.

FYI: we are concerned with the high-water table and flooding in the drainage areas. This could cause problems if a cistern is used. For this reason a Pressurized water supply with Fire hydrants is preferred. Fire Hydrants require a 1,000 GPM at 20 PSI residual flow contact me for reduce fire flows if needed.

Temporary turn-around - construction type, and radius need to be shown. No parking signage in the turn around is required.

For approval of the final plat:
In General the Final Plat cannot be approved prior to the Preliminary Plat. However, if all comments are addressed and both review fees are paid we will approve both preliminary and final plats at the same time. The Fire Protection Report needs to be removed from this document. Documentation showing the detailed plans of the selected Fire Protection Water Supply System needs to be attached. If Cistern call me for a design specification. For Fire hydrant the water mains need to be shown (Utility Plans). Plans showing the details of the turnarounds must be shown. The $131.00 Fire department (Final Plat) review fee needs to be paid to the Ellicott Fire Department (check or cash only)
75 North Ellicott Hwy, Calhan, CO 80808.
Please indicate the project on the check.

Any questions please contact me:
Mark Stanwood
Ellicott Fire Department
Fire Marshal
719-360-0578
Markstanwood32@gmail.com
3/9/2023 1:40:16 PM
County Attorney - Water
3/8/2023 12:05:32 PM
County Attorney's Office will review upon receipt of an updated letter from the State Engineer's Office. Please indicate whether you want review to occur in connection with the preliminary plan or final plat. 3/8/2023 12:05:32 PM
View Parks Advisory Board
1/12/2022 3:44:49 PM
See Park Advisory Board endorsed comments attached. 1/12/2022 3:44:49 PM
View Colorado Department of Transportation - Pueblo Office
1/5/2022 6:06:59 PM
1/5/2022 6:06:59 PM
View EPC Parks Department
1/3/2022 8:58:44 AM
See preliminary Parks comments attached.

Greg
1/3/2022 8:58:44 AM
View PCD Project Manager
1/3/2022 8:02:24 AM
Letter of Intent_V1 redlines 1/3/2022 8:02:24 AM
View PCD Project Manager
1/3/2022 8:00:49 AM
Traffic Memo_V1 redlines 1/3/2022 8:00:49 AM
View PCD Project Manager
1/3/2022 8:00:14 AM
Wastewater Treatment Report_V1 redlines 1/3/2022 8:00:14 AM
View PCD Project Manager
1/3/2022 7:58:29 AM
Final Plat Drawings_V1 redlines 1/3/2022 7:58:29 AM
View PCD Project Manager
1/3/2022 7:58:02 AM
Drainage Report - Final_V1 redlines 1/3/2022 7:58:02 AM
View Upper Black Squirrel Creek GWMD
12/29/2021 12:00:37 PM
12/29/2021 12:00:37 PM
View Upper Black Squirrel Creek GWMD
12/29/2021 12:00:19 PM
12/29/2021 12:00:19 PM
View Colorado Parks and Wildlife
12/26/2021 4:36:15 PM
12/26/2021 4:36:15 PM
Colorado Geological Survey
12/22/2021 3:06:59 PM
Viewpoint Estates Filing No.2 (38.8391°, -104.4356°) is a site that is not undermined, does not have steep slopes, and the geologic conditions imposing hazards and constraints can be mitigated through avoidance or commonly employed engineering methods. CGS concurs with Entech (p.6) that to mitigate constraints from the geologic conditions, site-specific investigations within each lot will be necessary before the design and construction of structures and septic systems.

These additional investigations are needed to investigate soil, bedrock, and groundwater conditions, take soil samples, and perform laboratory testing to identify swell/consolidation and any other engineering properties necessary to develop foundation, utility, pavement, and septic system recommendations. Provided these additional investigations are performed (as stated in Plat Note 11) and that they also address any site-specific impacts from potential subsurface groundwater (Entech (p.3): “Isolated sand layers within the soil profile can carry water in the subsurface”) potential for hydrocompaction (a geologic process) of collapsible soils (a geologic deposit), loose soils, potentially seasonal shallow groundwater, erosion, and regional hazards related to radon and seismicity the Colorado Geological Survey (CGS) has no objection to the proposed residential use and density.

Submitted 12/22/2021 by Jonathan R. Lovekin, P.G. Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
12/22/2021 3:06:59 PM
PCD Engineering Division
12/22/2021 10:48:13 AM
Engineer Review Ver.1
Please see engineer redline comments on the following documents
1. Final Plat Drawings
2. Letter of Intent
3. Drainage Report
4. Traffic Memo
PCD Project Manager will prepare and send submitted files with embedded redline comments.

Thank you

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
12/22/2021 10:48:13 AM
EPC Stormwater Review
12/22/2021 10:01:28 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...........(to be uploaded by PM with PCD comments)
- Final Plat Drawings.......(to be uploaded by PM with PCD comments)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
12/22/2021 10:01:28 AM
Pikes Peak Regional Building Department
12/22/2021 7:34:26 AM
It appears all lots will be accessed off of Chelsey Drive and will have a Chelsey Drive address. Once the development plan is approved we will address the development.

Standard Final Plat comments apply:
1. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
2. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment.
3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. BeckyA@pprbd.org (Please email the Enumerations staff that reviewed your project).

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
12/22/2021 7:34:26 AM
County Attorney - Development Review
12/21/2021 12:41:49 PM
No comments from County Attorney - Development Review at this time. 12/21/2021 12:41:49 PM
Mountain View Electric Association, Inc.
12/21/2021 12:33:59 PM
Final Plat Easement Note states: UNLESS OTHERWISE INDICATED, ALL SIDE AND REAR LOT LINES ARE HEREBY PLATTED ON EITHER SIDE WITH A 10 FOOT PUBLIC UTILITY AND DRAINAGE EASEMENT, ALL FRONT LINES WITH A 15 FOOT PUBLIC UTILITY AND DRAINAGE EASEMENT UNLESS OTHERWISE INDICATED. ALL EXTERIOR SUBDIVISION BOUNDARIES ARE HEREBY PLATTED WITH A 15 FOOT PUBLIC UTILITY AND DRAINAGE EASEMENT.

Please list all lot line utility easements on the Recorded Plat.
12/21/2021 12:33:59 PM
Colorado Department of Transportation - Pueblo Office
12/9/2021 8:10:39 AM
Michelle Regalado will be handling this planning referral request.

Thank you,
Valerie Vigil
CDOT Permits Program Mgr
12/9/2021 8:10:39 AM
View EPC Environmental Services
12/6/2021 3:09:08 PM
12/6/2021 3:09:08 PM
911 Authority - El Paso/Teller County
12/6/2021 9:03:59 AM
No new street names requested on this submittal.
No action for E911.
Thank you.
Justin.
12/6/2021 9:03:59 AM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
12/3/2021 7:30:13 PM
Hello, Mercedes Rivas -
The U.S. Fish and Wildlife Service (Service) has reviewed the documents associated with the final plat of Viewpoint Estates in El Paso County at 21209 and 21307 Chesley Drive. The 24+ acres will be vacated and replated into seven single-family rural residential lots. The Service has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered.

We recommend that you review the Service’s migratory bird guidance on avoiding and minimizing impacts, and our nationwide standard conservation measures.

If there is a “No Effect” determination, there is no need to contact our office.

We appreciate your efforts to ensure the conservation of threatened and endangered species. Thank you for contacting us and please let me know if you have any further questions. I can be reached at 303-236-4758 or at jen_williams@fws.gov.

Reference: Projects\EL PASO COUNTY\VIEWPOINT ESTATES – FINAL PLAT\2022-TA-0278
12/3/2021 7:30:13 PM
US Postal Service
12/3/2021 7:33:05 AM
Standard comment for Post Office
Contact Elaine Kelly – elaine.f.kelly@usps.gov and Rita Minnard oreta.j.minnard@usps.gov / 719-570-5592 to review development for mail service.
Confirm all pad location prior to final plat or it may be disapproved due to current Postal Regulations.
12/3/2021 7:33:05 AM
County Attorney - Water
12/2/2021 1:00:48 PM
County Attorney's Office will provide review of water sufficiency following receipt of findings from Colorado Division of Water Resources. 12/2/2021 1:00:48 PM
Colorado State Forest Service
12/2/2021 10:51:39 AM
The primary wildland fuel type for this proposal is grassland with scattered trees having a low wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. 12/2/2021 10:51:39 AM
Ellicott Fire Protection District
12/2/2021 8:22:39 AM
The Final Platt cannot be reviewed and completed until after the preliminary plat has been reviewed and approved. It is estimated it will take longer then the 2 weeks given for a review to complete the preliminary plat. At that time the Final plat can be approved once all fees are paid. The Fire Department Final Plat Review fee is $131.00.At this time the Final Plat is disapproved pending completion of the preliminary plat. 12/2/2021 8:22:39 AM
View El Paso County Conservation Dist
12/1/2021 11:56:13 AM
12/1/2021 11:56:13 AM
View El Paso County Conservation Dist
12/1/2021 11:55:41 AM
12/1/2021 11:55:41 AM