8/6/2025 4:55:39 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources
|
8/6/2025 4:55:38 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
|
8/6/2025 4:55:37 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
8/6/2025 4:55:36 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
8/6/2025 4:55:35 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by April Willie on behalf of County Attorney - Water
|
8/6/2025 4:54:35 PM
|
Submission Triaged
|
8/6/2025 3:49:34 PM
|
Submission received from Applicant
|
4/2/2025 12:30:37 PM
|
Submission request sent to Applicant
|
4/2/2025 9:03:53 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/1/2025 3:28:13 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/20/2025 11:25:10 AM
|
Submission Triaged
|
3/20/2025 11:07:38 AM
|
Submission received from Applicant
|
3/20/2025 11:00:24 AM
|
Submission request sent to Applicant
|
3/20/2025 10:24:09 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/20/2025 10:24:08 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/20/2025 10:24:07 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/20/2025 10:24:05 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
3/20/2025 10:24:04 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
3/20/2025 10:24:03 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by April Willie on behalf of County Attorney - Water
|
3/20/2025 10:23:30 AM
|
Submission Triaged
|
3/20/2025 10:10:19 AM
|
Submission received from Applicant
|
3/18/2025 2:57:24 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/18/2025 1:36:44 PM
|
Submission request sent to Applicant
|
3/18/2025 12:14:56 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/17/2025 2:09:07 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/14/2025 12:36:16 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/14/2025 11:43:33 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/4/2025 9:50:08 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/4/2025 9:50:06 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/4/2025 9:50:05 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/4/2025 9:50:04 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/4/2025 9:50:03 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
3/4/2025 9:50:02 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
3/4/2025 9:50:01 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by April Willie on behalf of County Attorney - Water
|
3/4/2025 9:50:00 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
3/4/2025 9:49:59 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
3/4/2025 9:49:58 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
3/4/2025 9:49:56 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
3/4/2025 9:48:31 AM
|
Submission Triaged
|
3/2/2025 6:42:21 PM
|
Submission received from Applicant
|
5/16/2024 2:55:33 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/16/2024 2:34:54 PM
|
Request for Review Comments email resent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
5/2/2024 5:11:46 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/26/2024 11:01:58 AM
|
Submission request sent to Applicant
|
4/16/2024 1:13:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/15/2024 4:49:11 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/15/2024 4:27:46 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/15/2024 2:01:07 PM
|
Request for Review Comments sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/12/2024 10:08:10 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
4/12/2024 10:07:18 AM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
4/4/2024 8:32:26 AM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
3/29/2024 4:25:39 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
3/29/2024 4:25:37 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Michael Henley on behalf of Ellicott Fire Protection District
|
3/29/2024 4:25:35 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/29/2024 4:25:34 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/29/2024 4:25:32 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/29/2024 4:25:28 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
3/29/2024 4:25:26 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/29/2024 4:25:22 PM
|
Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
3/29/2024 4:23:11 PM
|
Submission Triaged
|
3/29/2024 2:49:34 PM
|
Submission received from Applicant
|
3/29/2024 11:14:04 AM
|
Submission request sent to Applicant
|
1/19/2024 1:20:50 PM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
1/18/2024 2:19:38 PM
|
Submission request sent to Applicant
|
1/18/2024 11:36:35 AM
|
Request for Review Comments returned by County Attorney - Water
|
1/18/2024 10:35:51 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/18/2024 10:21:33 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/17/2024 10:43:37 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/5/2024 2:09:47 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/4/2024 8:44:18 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
1/4/2024 8:44:16 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Michael Henley on behalf of Ellicott Fire Protection District
|
1/4/2024 8:44:14 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/4/2024 8:44:10 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/4/2024 8:44:08 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/4/2024 8:44:05 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/4/2024 8:44:03 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Christina Prete on behalf of EPC Stormwater Review
|
1/4/2024 8:44:00 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Water
|
1/4/2024 8:43:58 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by April Willie on behalf of County Attorney - Water
|
1/4/2024 8:43:52 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/4/2024 8:43:47 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
1/4/2024 8:39:28 AM
|
Submission Triaged
|
1/3/2024 4:09:25 PM
|
Submission received from Applicant
|
4/21/2023 5:23:43 PM
|
Request for Review Comments returned by EPC Health Department
|
4/4/2023 9:30:29 AM
|
Submission request sent to Applicant
|
4/3/2023 9:12:11 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/30/2023 9:04:31 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/30/2023 7:31:40 AM
|
Submission request sent to Applicant
|
3/30/2023 7:30:32 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/29/2023 2:56:15 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/9/2023 1:40:37 PM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
3/8/2023 12:05:39 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/8/2023 10:46:31 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Michael Henley on behalf of Ellicott Fire Protection District
|
3/8/2023 10:46:30 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/8/2023 10:46:29 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Elaine Kelly on behalf of US Postal Service
|
3/8/2023 10:46:27 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/8/2023 10:46:23 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by EHS Mike McCarthy on behalf of EPC Health Department
|
3/8/2023 10:46:17 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Edi Anderson on behalf of County Attorney - Water
|
3/8/2023 10:46:16 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
3/8/2023 10:46:14 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/8/2023 10:44:14 AM
|
Submission Triaged
|
3/7/2023 9:02:02 AM
|
Submission received from Applicant
|
1/12/2022 3:44:55 PM
|
Request for Review Comments returned by Parks Advisory Board
|
1/5/2022 6:07:08 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/4/2022 3:47:33 PM
|
Project Manager Assigned: Ryan Howser
|
1/3/2022 8:58:51 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/3/2022 8:04:33 AM
|
Submission request sent to Applicant
|
1/3/2022 8:02:31 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/29/2021 12:00:53 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
12/26/2021 4:36:33 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/22/2021 3:07:44 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/22/2021 10:48:44 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/22/2021 10:02:45 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/22/2021 7:34:44 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/21/2021 12:42:00 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/21/2021 12:34:12 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/16/2021 3:59:26 PM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/6/2021 3:09:32 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/6/2021 9:04:09 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/3/2021 7:30:25 PM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/3/2021 7:33:26 AM
|
Request for Review Comments returned by US Postal Service
|
12/2/2021 1:01:18 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/2/2021 10:51:48 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/2/2021 8:22:58 AM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
12/1/2021 12:05:45 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
12/1/2021 10:40:05 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/1/2021 10:40:02 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Lisa Johnson on behalf of Ellicott Town Center Metropolitan District
|
12/1/2021 10:40:00 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Chris Smith on behalf of Ellicott SD 22
|
12/1/2021 10:39:58 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Michael Henley on behalf of Ellicott Fire Protection District
|
12/1/2021 10:39:56 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
12/1/2021 10:39:54 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/1/2021 10:39:52 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/1/2021 10:39:49 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/1/2021 10:39:47 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Elaine Kelly on behalf of US Postal Service
|
12/1/2021 10:39:45 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/1/2021 10:39:42 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
12/1/2021 10:39:37 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/1/2021 10:39:31 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/1/2021 10:39:28 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/1/2021 10:39:24 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
12/1/2021 10:39:13 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by on behalf of Parks Advisory Board
|
12/1/2021 10:39:11 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/1/2021 10:39:06 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/1/2021 10:39:04 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
12/1/2021 10:39:02 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by on behalf of EPC Parks Department
|
12/1/2021 10:39:00 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
12/1/2021 10:38:52 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/1/2021 10:38:50 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Edi Anderson on behalf of County Attorney - Water
|
12/1/2021 10:38:47 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
12/1/2021 10:38:45 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/1/2021 10:38:43 AM
|
Request for Review Comments email sent for Project Viewpoint Estates - Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/23/2021 9:52:51 AM
|
Fees paid: 11/23/2021 (Receipt: 1005421)
|
11/22/2021 9:22:04 PM
|
Project Manager Assigned: Mercedes Rivas
|
11/22/2021 9:21:54 PM
|
Payment Request sent: 11/22/2021
|
11/22/2021 9:21:54 PM
|
File # Assigned: SF2142
|
11/22/2021 9:21:45 PM
|
Submission Triaged
|
11/19/2021 3:39:00 PM
|
Submission received from Applicant
|
11/18/2021 1:50:40 PM
|
Submission request sent to Applicant
|
11/17/2021 9:09:29 PM
|
Submission request sent to Applicant
|
11/16/2021 4:56:01 PM
|
Submission request sent to Applicant
|
11/16/2021 4:54:50 PM
|
Project Manager Assigned: Nina Ruiz
|
8/21/2020 4:43:19 PM
|
Submission request sent to Applicant
|
4/14/2020 4:22:12 PM
|
Submission request sent to Applicant
|
4/14/2020 4:10:56 PM
|
Project Manager Assigned: Gabe Sevigny
|
4/14/2020 4:10:56 PM
|
EA Assigned: EA19218
|
4/14/2020 4:10:56 PM
|
Project Created
|