Project Review Comments

Back to List


Project Name
Cloverleaf Final Plat Filing No. 2
Description
Location
Parcels
7124202236 7124202236 7124202237 7124202237
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA19215
File Number
SF2123
Project Manager
John Green
Status
Closed
Created
11/21/2019 2:48:25 PM

View: Project Documents



Review Comments (83)

Link Agency Comment
PCD Project Manager
3/10/2022 2:19:54 PM
No additional comments 3/10/2022 2:19:54 PM
PCD Engineering Division
3/9/2022 2:14:34 PM
The approved utility plan and revision #1 of the stormwater construction plans will be uploaded by the project manager.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
3/9/2022 2:14:34 PM
View County Attorney - Development Review
2/24/2022 10:11:30 AM
DMA signature attached. 2/24/2022 10:11:30 AM
View County Attorney - Development Review
2/22/2022 1:48:58 PM
Signature to SIA attached. 2/22/2022 1:48:58 PM
County Attorney - Development Review
2/19/2022 10:38:48 PM
No further comments from County Attorney - Development Review. 2/19/2022 10:38:48 PM
View EPC Parks Department
2/15/2022 9:25:54 AM
El Paso County Community Services / Parks Final Comments, Review #3 - Please See Attached Documents (PAB Endorsed 07/14/2021) 2/15/2022 9:25:54 AM
PCD Engineering Division
2/14/2022 10:39:49 AM
Review #6:
Unresolved. Utility Construction Plans: The WWSD must sign/approve the plans before submitting to the County for final approval. See BoCC Condition of Approval No. 11 under Resolution No. 22-36 (Reception No. 222015914).


Resolved: Upload signed version of the pond agreement.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
2/14/2022 10:39:49 AM
County Attorney - Development Review
2/10/2022 2:36:03 PM
Regarding the SIA:
1. “irrevocable letter of credit” in the last Whereas needs to be changed to “subdivision bond”
2. The Assessor’s website does not show CND-Cloverleaf, LLC as the property owner. The SIA must be signed by the entity that owns the property at the time of plat recording. Please confirm that the property has been conveyed to CND-Cloverleaf.
3. Please have the developer confirm the full legal name of the entity providing the subdivision bond so that I can verify that it’s authorized to do business in Colorado.
2/10/2022 2:36:03 PM
PCD Engineering Division
1/26/2022 10:23:05 AM
Review #5:
- Utility Construction Plans: The WWSD must sign/approve the plans before submitting to the County for final approval. Unresolved.

- Upload signed version of the pond agreement.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
1/26/2022 10:23:05 AM
View County Attorney - Water
1/19/2022 3:54:40 PM
See the attached Water Review. 1/19/2022 3:54:40 PM
PCD Project Manager
1/4/2022 9:02:50 AM
No additional Planning Comments 1/4/2022 9:02:50 AM
EPC Stormwater Review
12/27/2021 11:43:51 AM
Review 4: EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- Storm Sewer and Pond Plans
- MS4 Post Construction Form

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
12/27/2021 11:43:51 AM
PCD Engineering Division
12/20/2021 10:47:16 AM
Review #4: Redline comments to the following documents will be uploaded by the project manager:
- Utility Construction Plans: The WWSD must sign/approve the plans before submitting to the County for final approval. Unresolved.

Upload the AutoCAD base drawings for the construction plans and plat as part of the final submittal for approval per ECM section 5.9.4. The files shall contain at least two survey reference points to allow the County to move, fit and rotate the project file to the survey coordinate system used by EPC. Unresolved.

Upload signed version of the pond agreement.


Comments resolved on the following documents:
- Final Plat
- Storm and Pond Construction Plans


Reviewed by:
Gilbert Laforce, PE
gilbertlaforce@elpasoco.com
12/20/2021 10:47:16 AM
View PCD Project Manager
12/10/2021 9:33:25 AM
Please see redline comments on Drainage Report 12/10/2021 9:33:25 AM
View PCD Project Manager
12/10/2021 9:32:29 AM
Please see redline comments on Final Plat Drawing 12/10/2021 9:32:29 AM
View PCD Project Manager
12/10/2021 9:31:50 AM
Please see redline comments on CDs - Engineering 12/10/2021 9:31:50 AM
View PCD Project Manager
12/10/2021 9:31:07 AM
Please see redline comments on CDs - Stormwater 12/10/2021 9:31:07 AM
PCD Project Manager
12/9/2021 7:18:00 AM
No additional Planning Comments 12/9/2021 7:18:00 AM
View EPC Stormwater Review
12/7/2021 10:38:43 AM
MS4 Post Construction_v3 12/7/2021 10:38:43 AM
Pikes Peak Regional Building Department
12/7/2021 8:36:02 AM
Regarding a request for approval of a final plat for Cloverleaf Filing No. 2, Enumerations has the following comments:

1. The applicant has requested address assignment. Once the addressing is returned, the addresses need to be placed on the plat.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
12/7/2021 8:36:02 AM
PCD Engineering Division
12/7/2021 5:16:30 PM
Review 2: Redline comments to the following documents will be uploaded by the project manager:
- Final Plat
- Storm and Pond Construction Plans
- Utility Construction Plans: The developer statement is missing. Additional the WWSD must sign/approve the plans before submitting to the County for final approval.

Comments resolved on the following documents:
* Drainage Report
* Financial Assurance Estimate

Upload the AutoCAD base drawings for the construction plans and plat as part of the final submittal for approval per ECM section 5.9.4. The files shall contain at least two survey reference points to allow the County to move, fit and rotate the project file to the survey coordinate system used by EPC.

Remaining comments are minor. Upload all engineering documents with signatures for final signature approval once all of stormwater teams comments are resolved.

Reviewed by:
Gilbert Laforce, PE
gilbertlaforce@elpasoco.com
12/7/2021 5:16:30 PM
County Attorney - Development Review
12/9/2021 4:04:21 PM
1. No proposed changes to Pond Maintenance Agreement uploaded on 11/30/21. Please provide a copy of the existing easement granted to from Offsite Owner to Developer and Metro District.
2. Please provide proof that Texas Capital Bank is authorized to do business in Colorado.
12/9/2021 4:04:21 PM
EPC Stormwater Review
12/6/2021 5:29:12 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report.........................(to be uploaded by PM with PCD comments)
- Storm Sewer and Pond Plans....(to be uploaded by PM with PCD comments)
- MS4 Post Construction Form

EPC Stormwater comments have been resolved on the following documents:
- Maintenance Agreement
- O&M Manual
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
12/6/2021 5:29:12 PM
County Attorney - Water
11/19/2021 11:14:57 AM
The Application, Letter of Intent, and Water Supply Information Summary indicate 131 lots and the Subdivision Summary, District letter, Water Resources Report, and State Engineer's Office letter all indicate 132. Please clarify the correct number of lots and upload updated documents so the number of lots is consistent. Also, please have an updated State Engineer's Office letter uploaded indicating the correct date of the District letter that the State relied on in their opinion. 11/19/2021 11:14:57 AM
View PCD Project Manager
10/5/2021 4:33:09 PM
Please see redline comments on Final Plat 10/5/2021 4:33:09 PM
View PCD Project Manager
10/5/2021 4:32:42 PM
Please see redline comments on FAE 10/5/2021 4:32:42 PM
View PCD Project Manager
10/5/2021 4:32:16 PM
Please see redline comments on Drainage Report 10/5/2021 4:32:16 PM
View PCD Project Manager
10/5/2021 4:31:34 PM
Please see redline comments on CDs 10/5/2021 4:31:34 PM
View Woodmoor Water and Sanitation District
9/29/2021 9:48:47 AM
RE: Cloverleaf Filing No. 2 - Plat

The Woodmoor Water and Sanitation District No. 1 (the District) has received the plat related to the Cloverleaf Filing No. 2 and currently had the following concerns and/or recommendations:


General Comments


1. In the General Notes, #11 should read “WATER AND SANITARY SEWER SERVICES SHALL BE SUPPLIED BY WOODMOOR WATER AND SANITATION DISTRICT No. 1”
2. On Sheet 3 of 8, Tract L is not labeled.
3. On sheet 4 of 8, please replace “DRAINAGE” with “UTILITY” on the easement running through and to the east of Tract B, and add “See Detail A, Sheet 8” to description.
4. On sheet 4 of 8, please correct “D.E.” to “U.E.” in the easement description located in Tract B.
5. On sheet 6 of 8, “Tract” is misspelled on Tract H.
6. On sheet 7 of 8, please label the 20’ width of the easement in Detail A.


If you should have any questions, please contact me.
9/29/2021 9:48:47 AM
Pikes Peak Regional Building Department
9/21/2021 2:00:40 PM
Regarding a request for approval of a final plat for Cloverleaf Filing No. 2, Enumerations has the following comments:

1. Previous comments regarding the missing street names on (now) page 7 have not been addressed. The streets shown in the vicinity of lots 127-132 do not show a street name on page 7.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
9/21/2021 2:00:40 PM
View EPC Stormwater Review
9/21/2021 10:47:22 AM
PBMP App Form_v2 9/21/2021 10:47:22 AM
View EPC Stormwater Review
9/21/2021 10:47:03 AM
O&M Manual_v2 9/21/2021 10:47:03 AM
View EPC Stormwater Review
9/21/2021 10:46:38 AM
MS4 Post Construction_v2 9/21/2021 10:46:38 AM
View County Attorney - Development Review
9/20/2021 12:06:03 PM
Proposed changes to Detention Maintenance Agreement attached. 9/20/2021 12:06:03 PM
EPC Stormwater Review
9/21/2021 10:45:58 AM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD.........................(to be uploaded by PM with PCD comments)
- MS4 Post Construction Form
- Maintenance Agreement (comments made in O&M Manual file - Attachment A, so no additional file uploaded)
- O&M Manual
- PBMP Applicability Form

EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- GEC Plan
- GEC Checklist
- SDI
- SWMP Checklist
- SWMP

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
9/21/2021 10:45:58 AM
PCD Project Manager
9/17/2021 4:28:44 PM
Comments will be uploaded once PCD Engineering review is complete 9/17/2021 4:28:44 PM
Mountain View Electric Association, Inc.
9/16/2021 10:04:38 AM
Please reference the review letter dated June 22, 2021. No additional comments at this time. 9/16/2021 10:04:38 AM
PCD Engineering Division
9/20/2021 1:59:38 PM
Review 2: Redline comments to the following documents will be uploaded by the project manager:
* Final Plat
* Drainage Report
* Construction Plans
* Financial Assurance Estimate

Comments resolved on the following documents:
- Grading and Erosion Control Plans
- SDI Worksheet

- Submit the Non-Jurisdictional Water Impoundment Form to the State and upload a copy of the form and receipt. Unresolved.

Reviewed by:
Gilbert Laforce, PE
gilbertlaforce@elpasoco.com
9/20/2021 1:59:38 PM
Colorado Department of Transportation - Pueblo Office
9/10/2021 4:27:05 PM
CDOT staff does not have any further comments for this development. Out of CDOT jurisdiction and no impact are expected as of this development. Arthur Gonzales - Access Manager 9/10/2021 4:27:05 PM
View Parks Advisory Board
9/3/2021 12:03:34 PM
El Paso County Community Services / Parks Final Comments, Review #2 - Please See Attached Documents (PAB Endorsed 07/14/2021) 9/3/2021 12:03:34 PM
View EPC Parks Department
9/3/2021 12:00:19 PM
El Paso County Community Services / Parks Final Comments, Review #2 - Please See Attached Documents (PAB Endorsed 07/14/2021) 9/3/2021 12:00:19 PM
County Attorney - Water
9/1/2021 1:42:18 PM
Applicant - Please provide an updated Water Supply Information Summary indicating 132 lots and the correct overall water demand for the subdivision. Also, the State Engineer's Office refers to a District letter dated February 10, 2021 - please upload said letter. (Or is the letter in EDARP from the District dated May 13, 2020 possibly mis-dated and should indicate 5/13/21? If so - please correct). Thank you. 9/1/2021 1:42:18 PM
View EPC Health Department
7/23/2021 3:21:29 PM
7/23/2021 3:21:29 PM
View Parks Advisory Board
7/23/2021 11:29:14 AM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (PAB Endorsed 07/14/2021) 7/23/2021 11:29:14 AM
Colorado Department of Transportation - Pueblo Office
7/20/2021 11:37:57 AM
CDOT staff does not have any further comments for this development. Arthur Gonzales - Access Manager 7/20/2021 11:37:57 AM
View PCD Project Manager
7/13/2021 4:39:32 PM
Please see redline comments on Water Resources Report 7/13/2021 4:39:32 PM
View PCD Project Manager
7/13/2021 4:39:04 PM
Please see redline comments on Wastewater Report 7/13/2021 4:39:04 PM
View PCD Project Manager
7/13/2021 4:38:36 PM
Please see redline comments on SIA 7/13/2021 4:38:36 PM
View PCD Project Manager
7/13/2021 4:38:15 PM
Please see redline comments on SDI 7/13/2021 4:38:15 PM
View PCD Project Manager
7/13/2021 4:37:55 PM
Please see redline comments on Soils Report 7/13/2021 4:37:55 PM
View PCD Project Manager
7/13/2021 4:37:29 PM
Please see redline comments on LOI 7/13/2021 4:37:29 PM
View PCD Project Manager
7/13/2021 4:37:08 PM
Please see redline comments on GEC Plan 7/13/2021 4:37:08 PM
View PCD Project Manager
7/13/2021 4:36:32 PM
Please see redline comments on Fire Protection Report 7/13/2021 4:36:32 PM
View PCD Project Manager
7/13/2021 4:35:53 PM
Please see redline comments on Final Plat 7/13/2021 4:35:53 PM
View PCD Project Manager
7/13/2021 4:35:21 PM
Please see redline comments on FAE 7/13/2021 4:35:21 PM
View PCD Project Manager
7/13/2021 4:34:58 PM
Please see redline comments on Drainage Report 7/13/2021 4:34:58 PM
View PCD Project Manager
7/13/2021 4:34:02 PM
Please see redline comments on Construction Drawings 7/13/2021 4:34:02 PM
View PCD Project Manager
7/13/2021 4:33:14 PM
Please see redline comments on application form 7/13/2021 4:33:14 PM
View EPC Stormwater Review
6/29/2021 5:19:23 PM
SWMP_v1 6/29/2021 5:19:23 PM
View EPC Stormwater Review
6/29/2021 5:18:24 PM
SWMP Checklist_v1 6/29/2021 5:18:24 PM
View EPC Stormwater Review
6/29/2021 5:18:08 PM
SDI_v1 6/29/2021 5:18:08 PM
View EPC Stormwater Review
6/29/2021 5:17:44 PM
PBMP Applicability Form_v1 6/29/2021 5:17:44 PM
View EPC Stormwater Review
6/29/2021 5:17:24 PM
O&M Manual_v1 6/29/2021 5:17:24 PM
View EPC Stormwater Review
6/29/2021 5:17:04 PM
MS4 Post Construction Form_v1 6/29/2021 5:17:04 PM
View EPC Stormwater Review
6/29/2021 5:16:47 PM
GEC Checklist_v1 6/29/2021 5:16:47 PM
EPC Stormwater Review
6/29/2021 5:16:26 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD.........................(to be uploaded by PM with PCD comments)
- Drainage Report....(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- MS4 Post Construction Form
- O&M Manual + Maintenance Agreement
- PBMP Applicability Form
- SDI
- SWMP Checklist
- SWMP

Please upload the maintenance agreement as a separate file, it is currently attached to the file for the O&M Manual.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
6/29/2021 5:16:26 PM
View EPC Parks Department
6/25/2021 10:26:58 AM
El Paso County Community Services / Parks Preliminary Comments - Please See Attached Documents (To be presented to the PAB for endorsement on 07/14/2021) 6/25/2021 10:26:58 AM
Woodmoor Water and Sanitation District
6/24/2021 4:05:11 PM
The Woodmoor Water and Sanitation District No. 1 (the District) has received the plat related to the Cloverleaf Filing No. 1 and currently had the following concerns and/or recommendations:

1. The District is concerned that a 5' front, side, and rear lot platted utility easement may be too narrow for construction of water and sanitary sewer utilities.

2. There is a proposed easement between lots 19 and 20 for the re-routing of an existing raw water transmission pipeline. The District would like to discuss this re-route with the Engineer. It is possible that a different route could be more feasible and require less labor, and it would require different locations for the easement(s).

3. Some properties do not contain side or rear lot easements. An example of this is lots 122-126. Is this intentional, and if so, what is the intent?

4. On sheet 3 of 7, how wide is the side lot easement on the north side of lot 39?

5. On sheet 4 of 7, please note what type of easement Rec No 220072332 is.

6. On sheet 4 of 7, please note which entity (public, electric, private, etc) is associated with easement Book 5437 pg 646

7. Is 5' the new standard for side, front, and rear lot public easement widths? Is 7' the standard for new exterior subdivision easement widths?
6/24/2021 4:05:11 PM
View County Attorney - Development Review
6/24/2021 2:53:08 PM
If the developer wishes to include the subdivision in Public Improvement District No. 2, please complete the attached petition in full and submit to the County Attorney's Office, along with a legal description of the subdivision in Word.

State law requires that legal notice of the BoCC hearing to include the property in the PID be published for three weeks. Developer is responsible for reimbursing the County Attorney's Office for the cost of publication.

The inclusion hearing must be held before the plat is recorded and requires 3 weeks of published notice. The County Attorney's Office makes every attempt to schedule the inclusion hearing on the date of BoCC or administrative approval of the plat, or as close thereto as possible. The developer and County Planning are responsible to keep the County Attorney's Office informed of the anticipated plat approval date.
6/24/2021 2:53:08 PM
View County Attorney - Development Review
6/24/2021 2:51:57 PM
2 minor changes to SIA on first page attached.
Please submit a Detention Maintenance Agreement for review.
6/24/2021 2:51:57 PM
PCD Engineering Division
7/7/2021 2:59:31 PM
Review 1:
- Upload the pond maintenance agreement as a separate standalone document from the pond O&M
- Submit the Non-Jurisdictional Water Impoundment Form to the State and upload a copy of the form and receipt.

Redline comments to the following documents will be uploaded by the project manager:
- Final Plat
- Drainage Report
- Construction Plans
- Grading and Erosion Control Plans
- Financial Assurance Estimate
- SDI Worksheet


Reviewed by:
Gilbert Laforce, PE
gilbertlaforce@elpasoco.com
7/7/2021 2:59:31 PM
Pikes Peak Regional Building Department
6/23/2021 1:31:43 PM
Regarding a request for approval of a final plat for Cloverleaf Filing No. 2, Enumerations has the following comment:

1. This plan indicates that the existing streets of Walters Point and Cross Timbers Green will be officially extended and platted as part of this project. Shouldn’t these street names be shown on page 6?
2. Per Regional Building Code, section RBC312.8 addresses must appear on plats. Submit a 100 scale copy of the plat to our office for addressing. Place an (xxxx) on all lots and tracts which will require an address, in the location the address will be needed. Once addressing is completed, the addresses will be returned so that they may be placed on the mylar prior to recording.
3. Prior to recording, Enumerations will review the mylar for addressing, title block, street names and floodplain statement. A fee of $10 per lot/tract addressed, payable to Pikes Peak Regional Building Department will be due at the time of mylar review.
4. Provide a copy of the final recorded plat to Enumerations. Approval of any plans submitted for this development will be pending receipt in our office of a copy of the final recorded plat.




Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
6/23/2021 1:31:43 PM
View Colorado Parks and Wildlife
6/22/2021 11:19:53 AM
6/22/2021 11:19:53 AM
View Mountain View Electric Association, Inc.
6/22/2021 10:52:43 AM
See attached comments 6/22/2021 10:52:43 AM
View Colorado Division of Water Resources
6/21/2021 11:58:04 AM
6/21/2021 11:58:04 AM
Lewis Palmer 38
6/21/2021 11:57:37 AM
Lewis-Palmer School District 38 requests cash in-lieu-of land for any residential development within the Cloverleaf subdivision. 6/21/2021 11:57:37 AM
Colorado Geological Survey
6/21/2021 10:49:03 AM
The Cloverleaf Final Plat Filing No. 2 site (39.0819, -104.8476) has been reviewed by the Colorado Geological Survey (CGS) during the preliminary plan stage, most recently on 12.2.20 and 2.9.21. As noted on page 6 of the Letter of Intent (NES, Inc., May 2021), “All houses will include a subsurface foundation perimeter drain. During final design, the civil engineer will design an underdrain system,” and “provide a gravity outfall.” Provided Entech’s recommendations (Soil, Geology and Geologic Hazard Study, Cloverleaf Development, El Paso County, Colorado, Entech Engineering Job No. 200100, revised November 9, 2020) are adhered to, CGS has no objection to the final plat's approval.

We offer the following comments.

1. Sheet 1 of the Final Plat (J.R. Engineering, May 7, 2021) should reference Entech’s November 9, 2020 report and indicate all geologic hazards and constraints associated with the site, including mapped wetlands.

2. CGS recommends that a routine inspection and maintenance plan be established and implemented for the underdrain systems and noted on the plans.

Amy Crandall, P.E., Colorado Geological Survey acrandall@mines.edu
6/21/2021 10:49:03 AM
Tri-Lakes-Monument Fire Protection District
6/21/2021 9:25:57 AM
No additional comments. 6/21/2021 9:25:57 AM
Colorado State Forest Service
6/11/2021 9:57:37 AM
The primary wildland fuel type for this proposal is grassland with scattered trees having a low wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. 6/11/2021 9:57:37 AM
911 Authority - El Paso/Teller County
6/9/2021 10:53:18 AM
Street names previously approved.
No action for E911.
Thank you.
Justin
6/9/2021 10:53:18 AM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/9/2021 9:37:01 AM
Hello John Green,

The U.S. Fish and Wildlife Service (Service) has reviewed the documents associated with the residential subdivision construction Cloverleaf Final Plat Filing No. 2 in Monument, CO. On October 31, 2019, the Service determined there were no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered. We reaffirm this determination.

We appreciate your efforts to ensure the conservation of threatened and endangered species. Thank you for contacting us and please let me know if you have any further questions.

George L. San Miguel

Wildlife Biologist
Colorado Ecological Services Field Office
US Fish & Wildlife Service
134 Union Blvd., Suite 670
Lakewood, Colorado 80228
(303)236-4752
George_SanMiguel@FWS.gov
6/9/2021 9:37:01 AM
View EPC Environmental Services
6/4/2021 1:06:35 PM
6/4/2021 1:06:35 PM
County Attorney - Water
6/4/2021 8:00:58 AM
County Attorney's Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources.

Note - there appears to be a discrepancy in the documentation as to whether the proposal is for 132 lots or 135 lots. Thank you.
6/4/2021 8:00:58 AM