Project Details

Search


File Number
SF2123
Project Name
Cloverleaf Final Plat Filing No. 2
Parcels
7124202236 7124202236 7124202237 7124202237
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA19215
File Prefix
SF - Final Plat
Year
2021
Project Manager
John Green
Status
Closed
Created
11/21/2019 2:48:25 PM

View: Review Comments


Approved Documents (16)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Grading & Erosion Control checklist
View MS4 Post Construction Form
View PBMP Applicability Form
View SWMP checklist
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Final
View Traffic Impact Study
View Deviation - Storm Sewer Drops
View Deviation - Walters Point sidewalk
View Drainage Facility Construction Plans
View Estimate of Guaranteed Funds
View Storm Sewer & Pond Plans
View Utility Construction Plans


Additional Documents (29)

Link Document Comment
View Posting Photos
View Mailing Packet: Notice, Map and Labels
View Returned Mail
View PC Staff Report with Attachments
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View BoCC Staff Report with Attachments
View Returned Mail
View PC Approval Letter
View BoCC Approval Letter
View BoCC Resolution 22-36
View PC Resolution
View Returned Mail
View Recorded Plat
View Recorded Amendment to Easement
View Recorded Disclosure
View Recorded Detention Maintenance Agreement
View Recorded Ratification of Plat
View Recorded SIA
View Recorded Sight Easement
View Recorded Sight Easement 2
View Approved Pavement Design Report
View Approved Deviation Report
View Recorded License Agreement
View 24-65 Cloverleaf Filing No. 2 Prelim RA


Review Documents (67)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 5/20/2021 2:10:56 PM
View Application/Petition Form 11/30/2021 9:49:10 AM
View Legal Description (MS WORD Version required) 5/18/2021 8:55:24 AM
View Letter of Intent 11/12/2021 4:59:56 PM
View Title Commitment (Current within 30 days of submittal) 5/19/2021 5:35:20 PM
View Vicinity/Location Map 5/18/2021 8:55:25 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 11/12/2021 2:23:09 PM
View Grading & Erosion Control checklist 11/30/2021 9:58:33 AM
View Mineral Rights Certification 5/19/2021 5:11:22 PM
View MS4 Post Construction Form 12/16/2021 1:54:43 PM
View PBMP Applicability Form 11/12/2021 2:45:13 PM
View PDB/BMP Operations & Maintenance Manual 11/30/2021 9:58:30 AM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 11/30/2021 9:58:29 AM
View SWMP checklist 11/30/2021 9:58:33 AM
View Construction Drawings (Plans/Profiles) 12/16/2021 12:38:13 PM
View Final Plat Drawings 12/16/2021 12:40:20 PM
View Grading & Erosion Control Plan 11/12/2021 2:56:21 PM
View Storm Water Management Plan (SWMP) 2/7/2022 10:22:05 AM
View Electric Provider Commitment Letter 11/30/2021 9:52:10 AM
View Fire Commitment Letter 5/19/2021 11:33:48 AM
View Natural Gas Commitment Letter 11/30/2021 9:52:11 AM
View Drainage Report - Final 12/16/2021 12:38:14 PM
View Fire Protection Report 8/25/2021 12:30:34 PM
View Natural Features Report 8/25/2021 12:40:18 PM
View Soils & Geology Report 8/25/2021 12:30:35 PM
View Subdivision Summary Sheet 11/30/2021 9:52:11 AM
View Traffic Impact Study 5/19/2021 6:11:01 PM
View Wastewater Treatment Report 11/30/2021 9:58:26 AM
View Water Quality Report 5/18/2021 8:55:27 AM
View Water Resources Report 11/30/2021 9:58:27 AM
View Water Supply Information Summary 11/30/2021 9:58:28 AM
View AutoCAD files for the project 12/22/2021 11:48:32 AM
View Closures Sheet (Survey) 5/18/2021 8:50:49 AM
View Commitment letter from waste water service provider 11/30/2021 10:58:15 AM
View Commitment letter from water service provider 11/30/2021 10:48:36 AM
View Deviation - Storm Sewer Drops 11/12/2021 2:40:18 PM
View Deviation - Walters Point sidewalk 11/12/2021 2:40:19 PM
View Drainage Facility Construction Plans 11/30/2021 9:46:02 AM
View Easement - north side of Leggins 11/12/2021 2:40:20 PM
View Estimate of Guaranteed Funds 11/12/2021 2:23:06 PM
View Exhibit B - BMP Map 12/22/2021 11:48:31 AM
View Exhibit C - Offsite Easement 12/22/2021 11:48:31 AM
View Existing Offsite Easement 12/22/2021 11:48:32 AM
View Pond Maintenance Agreement 1/27/2022 8:04:18 AM
View proposed plat note 8/25/2021 2:20:25 PM
View response to agency comments 8/25/2021 1:19:54 PM
View response to cd comments 8/25/2021 1:19:55 PM
View response to fae comments 8/25/2021 1:20:00 PM
View response to gec checklist comments 8/25/2021 1:20:00 PM
View response to gec plan comments 8/25/2021 1:33:37 PM
View response to MS4 comments 8/25/2021 1:33:40 PM
View response to O&M comments 8/25/2021 1:33:41 PM
View response to plat comments 8/25/2021 1:38:54 PM
View response to PMP comments 8/25/2021 1:33:44 PM
View response to sdi comments 8/25/2021 1:43:55 PM
View response to sdi sw comments 8/25/2021 1:43:56 PM
View response to SWMP checklist comments 8/25/2021 1:43:56 PM
View response to SWMP comments 8/25/2021 1:43:57 PM
View response to water comments 8/25/2021 1:46:19 PM
View response to ww report comments 8/25/2021 1:43:58 PM
View SEO Letter 12-2-2021 1/12/2022 11:02:30 AM
View sight visibility easement - north 2/3/2022 10:04:15 AM
View site visibility easement 8/25/2021 1:19:53 PM
View State NOI non-jurisdictional ponds 11/30/2021 9:58:34 AM
View Storm Sewer & Pond Plans 3/4/2022 2:27:51 PM
View Subdivision Improvement Agreement (MS Word version required) 2/16/2022 4:12:55 PM
View Utility Construction Plans 3/4/2022 2:27:49 PM



Events (193)

Date Comment
3/10/2022 3:10:07 PM Project Closed
3/10/2022 3:10:07 PM Project Approved: 3/10/2022
3/10/2022 2:20:04 PM Request for Review Comments returned by PCD Project Manager
3/9/2022 2:14:58 PM Request for Review Comments returned by PCD Engineering Division
3/8/2022 7:18:23 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
3/8/2022 7:18:17 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/8/2022 7:17:02 AM Submission Triaged
3/4/2022 2:28:38 PM Submission received from Applicant
3/3/2022 5:16:21 PM Submission request sent to Applicant
2/24/2022 10:11:41 AM Request for Review Comments returned by County Attorney - Development Review
2/24/2022 9:22:50 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
2/22/2022 1:49:22 PM Request for Review Comments returned by County Attorney - Development Review
2/22/2022 1:45:30 PM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
2/19/2022 10:39:06 PM Request for Review Comments returned by County Attorney - Development Review
2/17/2022 7:28:28 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
2/17/2022 7:27:21 AM Submission Triaged
2/16/2022 4:15:29 PM Submission received from Applicant
2/16/2022 3:29:57 PM Submission request sent to Applicant
2/16/2022 3:29:25 PM Submission Triaged
2/16/2022 8:26:16 AM Submission received from Applicant
2/15/2022 5:17:17 PM Submission request sent to Applicant
2/15/2022 9:26:37 AM Request for Review Comments returned by EPC Parks Department
2/14/2022 10:40:04 AM Request for Review Comments returned by PCD Engineering Division
2/10/2022 2:36:17 PM Request for Review Comments returned by County Attorney - Development Review
2/10/2022 9:15:10 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
2/10/2022 9:15:04 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/10/2022 9:14:01 AM Submission Triaged
2/7/2022 10:22:53 AM Submission received from Applicant
2/7/2022 10:03:38 AM Submission request sent to Applicant
2/4/2022 11:31:50 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of EPC Parks Department
2/3/2022 12:07:03 PM Submission Triaged
2/3/2022 10:04:40 AM Submission received from Applicant
2/3/2022 9:18:31 AM Submission request sent to Applicant
1/27/2022 5:20:01 PM Submission Triaged
1/27/2022 9:40:48 AM Submission received from Applicant
1/27/2022 9:36:30 AM Submission request sent to Applicant
1/26/2022 10:25:57 AM Submission request sent to Applicant
1/26/2022 10:24:08 AM Request for Review Comments returned by PCD Engineering Division
1/26/2022 8:28:41 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/21/2022 1:08:51 PM Submission Triaged
1/21/2022 1:04:16 PM Submission received from Applicant
1/21/2022 1:01:08 PM Submission request sent to Applicant
1/21/2022 12:54:35 PM Submission request sent to Applicant
1/19/2022 3:55:20 PM Request for Review Comments returned by County Attorney - Water
1/12/2022 10:58:04 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
1/4/2022 9:03:00 AM Request for Review Comments returned by PCD Project Manager
12/27/2021 11:44:28 AM Request for Review Comments returned by EPC Stormwater Review
12/22/2021 12:28:41 PM Submission Triaged
12/22/2021 11:56:08 AM Submission received from Applicant
12/22/2021 11:30:21 AM Submission request sent to Applicant
12/22/2021 10:48:32 AM Submission request sent to Applicant
12/21/2021 12:25:06 PM Request for Review Comments returned by County Attorney - Water
12/21/2021 12:05:15 PM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
12/20/2021 12:45:13 PM Request for Review Comments returned by County Attorney - Water
12/20/2021 10:57:25 AM Request for Review Comments returned by PCD Engineering Division
12/17/2021 10:12:34 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
12/17/2021 10:12:32 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
12/17/2021 10:12:30 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
12/17/2021 10:12:28 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
12/17/2021 10:12:22 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/17/2021 10:04:25 AM Submission Triaged
12/16/2021 1:56:09 PM Submission received from Applicant
12/10/2021 9:36:02 AM Submission request sent to Applicant
12/10/2021 9:34:10 AM Request for Review Comments returned by PCD Project Manager
12/9/2021 4:04:36 PM Request for Review Comments returned by County Attorney - Development Review
12/9/2021 8:27:55 AM Request for Review Comments returned by EPC Stormwater Review
12/9/2021 7:31:55 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
12/9/2021 7:18:19 AM Request for Review Comments returned by PCD Project Manager
12/7/2021 5:16:55 PM Request for Review Comments returned by PCD Engineering Division
12/7/2021 8:36:15 AM Request for Review Comments returned by Pikes Peak Regional Building Department
12/7/2021 7:40:17 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
12/3/2021 8:58:08 PM Request for Review Comments returned by County Attorney - Development Review
12/2/2021 7:31:08 AM Submission Triaged
11/30/2021 11:01:32 AM Submission received from Applicant
11/30/2021 9:19:22 AM Submission request sent to Applicant
11/19/2021 11:15:08 AM Request for Review Comments returned by County Attorney - Water
11/16/2021 9:01:32 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/16/2021 9:01:28 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/16/2021 9:01:26 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
11/16/2021 9:01:24 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
11/16/2021 9:01:21 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
11/16/2021 9:01:16 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/16/2021 8:58:34 AM Submission Triaged
11/12/2021 5:00:25 PM Submission received from Applicant
11/12/2021 2:51:34 PM Submission request sent to Applicant
10/11/2021 2:06:08 PM Submission request sent to Applicant
10/5/2021 4:34:45 PM Submission request sent to Applicant
10/5/2021 4:33:39 PM Request for Review Comments returned by PCD Project Manager
10/5/2021 4:30:10 PM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
9/29/2021 9:49:13 AM Request for Review Comments returned by Woodmoor Water and Sanitation District
9/21/2021 3:15:31 PM Request for Review Comments returned by Pikes Peak Regional Building Department
9/21/2021 10:49:47 AM Request for Review Comments returned by EPC Stormwater Review
9/20/2021 1:59:51 PM Request for Review Comments returned by PCD Engineering Division
9/20/2021 12:06:17 PM Request for Review Comments returned by County Attorney - Development Review
9/17/2021 4:28:53 PM Request for Review Comments returned by PCD Project Manager
9/16/2021 5:38:47 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Hunyadi on behalf of Colorado Dam Safety Division
9/16/2021 10:05:00 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
9/10/2021 4:27:45 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/3/2021 12:04:02 PM Request for Review Comments returned by Parks Advisory Board
9/3/2021 12:00:53 PM Request for Review Comments returned by EPC Parks Department
9/1/2021 1:42:31 PM Request for Review Comments returned by County Attorney - Water
9/1/2021 10:25:52 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
9/1/2021 10:25:50 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of EPC Parks Department
9/1/2021 10:24:07 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
9/1/2021 10:24:05 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by General Email on behalf of Mountain View Electric Association, Inc.
9/1/2021 10:24:02 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
9/1/2021 10:23:51 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of Parks Advisory Board
9/1/2021 10:23:47 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/1/2021 10:23:45 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
9/1/2021 10:23:43 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
9/1/2021 10:23:41 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
9/1/2021 10:23:34 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/1/2021 10:19:32 AM Submission Triaged
8/31/2021 8:05:46 AM Submission received from Applicant
8/30/2021 9:23:10 AM Submission request sent to Applicant
8/27/2021 4:34:06 PM Submission Triaged
8/25/2021 2:21:10 PM Submission received from Applicant
8/17/2021 8:45:46 AM Submission request sent to Applicant
7/27/2021 8:11:46 PM Submission request sent to Applicant
7/26/2021 2:38:18 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
7/23/2021 3:22:25 PM Request for Review Comments returned by EPC Health Department
7/23/2021 11:29:37 AM Request for Review Comments returned by Parks Advisory Board
7/20/2021 11:38:07 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/13/2021 4:40:48 PM Submission request sent to Applicant
7/13/2021 4:39:41 PM Request for Review Comments returned by PCD Project Manager
7/13/2021 4:31:57 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
7/13/2021 4:30:55 PM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
7/8/2021 7:28:29 AM Request for Review Comments returned by PCD Project Manager
7/7/2021 2:59:41 PM Request for Review Comments returned by PCD Engineering Division
7/6/2021 8:23:49 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
7/1/2021 6:35:58 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
7/1/2021 11:04:04 AM Request for Review Comments email resent for Project Cloverleaf Final Plat Filing No. 2 for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
6/29/2021 5:23:55 PM Request for Review Comments returned by EPC Stormwater Review
6/27/2021 7:38:39 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
6/25/2021 10:28:01 AM Request for Review Comments returned by EPC Parks Department
6/24/2021 4:06:50 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
6/24/2021 2:53:21 PM Request for Review Comments returned by County Attorney - Development Review
6/24/2021 9:41:51 AM Request for Review Comments returned by Pikes Peak Regional Building Department
6/22/2021 11:29:40 AM Request for Review Comments returned by Colorado Parks and Wildlife
6/22/2021 10:53:16 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/21/2021 12:00:27 PM Request for Review Comments returned by Lewis Palmer 38
6/21/2021 11:58:15 AM Request for Review Comments returned by Colorado Division of Water Resources
6/21/2021 10:58:40 AM Request for Review Comments returned by Colorado Geological Survey
6/21/2021 9:26:05 AM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
6/11/2021 9:57:45 AM Request for Review Comments returned by Colorado State Forest Service
6/9/2021 10:53:24 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/9/2021 9:37:24 AM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/4/2021 1:07:29 PM Request for Review Comments returned by EPC Environmental Services
6/4/2021 11:26:35 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
6/4/2021 11:26:30 AM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/4/2021 8:01:07 AM Request for Review Comments returned by County Attorney - Water
6/3/2021 4:32:10 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
6/3/2021 4:32:08 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
6/3/2021 4:32:06 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
6/3/2021 4:32:03 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by General Email on behalf of Mountain View Electric Association, Inc.
6/3/2021 4:32:01 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Debbie Flynn on behalf of Monument
6/3/2021 4:31:59 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Vicki Wood on behalf of Lewis Palmer 38
6/3/2021 4:31:57 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
6/3/2021 4:31:54 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
6/3/2021 4:31:52 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/3/2021 4:31:50 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/3/2021 4:31:48 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
6/3/2021 4:31:46 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
6/3/2021 4:31:44 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
6/3/2021 4:31:41 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
6/3/2021 4:31:38 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/3/2021 4:31:28 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of Parks Advisory Board
6/3/2021 4:31:26 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/3/2021 4:31:24 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/3/2021 4:31:21 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/3/2021 4:31:19 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of EPC Parks Department
6/3/2021 4:31:17 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by on behalf of EPC Health Department
6/3/2021 4:31:10 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Kathy Andrew on behalf of EPC Environmental Services
6/3/2021 4:31:08 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Edi Anderson on behalf of County Attorney - Water
6/3/2021 4:31:06 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
6/3/2021 4:31:04 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by John Green on behalf of PCD Project Manager
6/3/2021 4:31:01 PM Request for Review Comments email sent for Project Cloverleaf Final Plat Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/25/2021 3:22:54 PM Fees paid: 5/25/2021 (Receipt: 1004468)
5/24/2021 7:51:38 PM Project Manager Assigned: John Green
5/24/2021 7:51:27 PM Payment Request sent: 5/24/2021
5/24/2021 7:51:26 PM File # Assigned: SF2123
5/24/2021 7:51:16 PM Submission Triaged
5/24/2021 2:38:55 PM Submission received from Applicant
5/22/2021 9:17:25 PM Submission request sent to Applicant
5/22/2021 9:17:07 PM Submission Triaged
5/21/2021 4:28:06 PM Submission received from Applicant
5/10/2021 2:42:32 PM Submission request sent to Applicant
3/24/2020 5:37:49 PM Submission request sent to Applicant
11/21/2019 3:10:48 PM Submission request sent to Applicant
11/21/2019 3:09:37 PM Submission request sent to Applicant
11/21/2019 2:48:46 PM Project Manager Assigned: Nina Ruiz
11/21/2019 2:48:45 PM EA Assigned: EA19215
11/21/2019 2:48:45 PM Project Created