Project Review Comments

Back to List


Project Name
4-WAY LIFT STATION
Description
Intent of Owner is to construct a wastewater pumping facility and access driveway within 4-Way Ranch Metropolitan District holdings located NW of Highway 24 and Stapleton Drive in Falcon, Colorado. Site occupies part of Sections 13 and 28, Township 12 South, Range 64 West of the 6th P.M. Site is located within a current 131.5-acre tract and currently zoned PUD. Parcel schedule number is 4200000366. Site will include a 24’ x 25’ building, approximately 19’ tall. Construction of facility is planned to start early this summer. Facility will NOT be customer-oriented, and will not have customer traffic. A locked gate with access code will prevent access to anyone other than District operations staff. Access to the site will be via a future platted right-of-way, but initially through an access easement off of 4-Way Ranch Filing #1 at intersection of Thatcher Court and Gilbert Drive.
Location
The property is located on the north side of Stapleton Drive between Eastonville and US Highway 24 within the approved Waterbury PUD development area.
Parcels
4200000366 4200000366
Applicant
JDS-Hydro Consultants, Inc.
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
EA Number
EA18114
File Number
PPR1851
Project Manager
Nina Ruiz
Status
Active
Created
3/21/2018 1:14:39 PM

View: Project Documents



Review Comments (10)

Link Agency Comment
Falcon Fire Protection District
12/31/2018 2:45:57 PM
Falcon Fire has reviewed this development plan request with no objections and one request. That adequate emergency vehicle access road be provided to the facility meeting requirements of the 2009 IFC as adopted and approved. 12/31/2018 2:45:57 PM
View PCD Project Manager
12/19/2018 5:36:05 PM
MDT Letter 12/19/2018 5:36:05 PM
View PCD Project Manager
12/19/2018 5:34:41 PM
Drainage Redlines 12/19/2018 5:34:41 PM
View PCD Project Manager
12/19/2018 5:34:21 PM
GEC Redlines 12/19/2018 5:34:21 PM
PCD Project Manager
12/19/2018 5:33:27 PM
1. Please confirm there will be no exterior lights.
2. Please include a spreadsheet outlining the necessary landscaping in comparison to what has been provided.
3. Please add standard ADA note and ADA route.
4. Please add the exterior boundaries of the parcel (dimensioned) and then show a zoomed in version with the detail.
12/19/2018 5:33:27 PM
Woodmen Hills Metro
12/14/2018 4:00:52 PM
Construction will be done per Woodmen Hills Metropolitan District specifications. Inspections will be done by WHMD staff. 12/14/2018 4:00:52 PM
View EPC Health Department
12/14/2018 10:15:01 AM
12/14/2018 10:15:01 AM
View PCD Engineering Division
12/13/2018 1:00:17 PM
See Comment Letter 12/13/2018 1:00:17 PM
Pikes Peak Regional Building Department
12/6/2018 4:16:50 PM
Enumerations/Floodplain has the following comments:

1. Is the proposed access the black highlighted line leading to Stapleton Road on page 2?
2. Once the subdivision is built the substation address will have to change address to the direct access. Enumerations needs in writing, that this is understood.
12/6/2018 4:16:50 PM
View Mountain View Electric Association, Inc.
12/3/2018 4:37:35 PM
12/3/2018 4:37:35 PM