Intent of Owner is to construct a wastewater pumping facility and access driveway within 4-Way Ranch Metropolitan District holdings located NW of Highway 24 and Stapleton Drive in Falcon, Colorado. Site occupies part of Sections 13 and 28, Township 12 South, Range 64 West of the 6th P.M. Site is located within a current 131.5-acre tract and currently zoned PUD. Parcel schedule number is 4200000366. Site will include a 24’ x 25’ building, approximately 19’ tall. Construction of facility is planned to start early this summer. Facility will NOT be customer-oriented, and will not have customer traffic. A locked gate with access code will prevent access to anyone other than District operations staff. Access to the site will be via a future platted right-of-way, but initially through an access easement off of 4-Way Ranch Filing #1 at intersection of Thatcher Court and Gilbert Drive.
Location
The property is located on the north side of Stapleton Drive between Eastonville and US Highway 24 within the approved Waterbury PUD development area.
Parcels
4200000366 4200000366
Applicant
JDS-Hydro Consultants, Inc.
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
EA Number
EA18114
File Number
PPR1851
Project Manager
Nina Ruiz
Status
Closed
Created
3/21/2018 1:14:39 PM

View: Project Documents



Review Comments (22)

Link Agency Comment
Falcon Fire Protection District
4/1/2020 12:28:16 PM
no fire comments 4/1/2020 12:28:16 PM
View EPC Health Department
1/30/2020 4:05:22 PM
The CDPHE approval letter has been provided, and responses to the 2018 comments are acceptable. The 2018 comments are attached for reference. 1/30/2020 4:05:22 PM
PCD Project Manager
12/26/2019 5:12:24 PM
Lights are being provided. Please provide a photometric plan. 12/26/2019 5:12:24 PM
View PCD Project Manager
12/26/2019 5:08:46 PM
Drainage redline 12/26/2019 5:08:46 PM
View PCD Project Manager
12/26/2019 5:08:19 PM
ESQCP Redline 12/26/2019 5:08:19 PM
View PCD Project Manager
12/26/2019 5:07:39 PM
FAS Redline 12/26/2019 5:07:39 PM
View PCD Project Manager
12/26/2019 5:07:23 PM
Site Development Redline 12/26/2019 5:07:23 PM
View PCD Engineering Division
12/19/2019 3:11:41 PM
See Comment Letter
Steve Kuehster
719-520-6813
12/19/2019 3:11:41 PM
PCD Project Manager
12/12/2019 1:29:50 PM
EPC Engineering Division continues to be short staffed and is experiencing delayed review times. The comments are expected to be posted next week. 12/12/2019 1:29:50 PM
RBD Floodplain
12/11/2019 9:56:00 AM
The proposed Lift station is not located within the SFHA,
Floodplain has No Comment on this project
12/11/2019 9:56:00 AM
Pikes Peak Regional Building Department
12/10/2019 10:34:09 AM
1. A permanent sign with the temporary address needs to be posted, pointing in the direction of the access road at Stapleton Road.
2. Temp. address for substation until the subdivision is built out and the access to the substation changes is 14070 Stapleton Road.
No further comments at this time.
12/10/2019 10:34:09 AM
Mountain View Electric Association, Inc.
11/26/2019 10:40:25 AM
Thank you for the opportunity to review this project. No additional comments at this time.
Cathy
Mountain View Electric Association, Inc.
11/26/2019 10:40:25 AM
Falcon Fire Protection District
12/31/2018 2:45:57 PM
Falcon Fire has reviewed this development plan request with no objections and one request. That adequate emergency vehicle access road be provided to the facility meeting requirements of the 2009 IFC as adopted and approved. 12/31/2018 2:45:57 PM
View PCD Project Manager
12/19/2018 5:36:05 PM
MDT Letter 12/19/2018 5:36:05 PM
View PCD Project Manager
12/19/2018 5:34:41 PM
Drainage Redlines 12/19/2018 5:34:41 PM
View PCD Project Manager
12/19/2018 5:34:21 PM
GEC Redlines 12/19/2018 5:34:21 PM
PCD Project Manager
12/19/2018 5:33:27 PM
1. Please confirm there will be no exterior lights.
2. Please include a spreadsheet outlining the necessary landscaping in comparison to what has been provided.
3. Please add standard ADA note and ADA route.
4. Please add the exterior boundaries of the parcel (dimensioned) and then show a zoomed in version with the detail.
12/19/2018 5:33:27 PM
Woodmen Hills Metro
12/14/2018 4:00:52 PM
Construction will be done per Woodmen Hills Metropolitan District specifications. Inspections will be done by WHMD staff. 12/14/2018 4:00:52 PM
View EPC Health Department
12/14/2018 10:15:01 AM
12/14/2018 10:15:01 AM
View PCD Engineering Division
12/13/2018 1:00:17 PM
See Comment Letter 12/13/2018 1:00:17 PM
Pikes Peak Regional Building Department
12/6/2018 4:16:50 PM
Enumerations/Floodplain has the following comments:

1. Is the proposed access the black highlighted line leading to Stapleton Road on page 2?
2. Once the subdivision is built the substation address will have to change address to the direct access. Enumerations needs in writing, that this is understood.
12/6/2018 4:16:50 PM