Project Details

Search | All Active Projects


File Number
PUDSP251
Project Name
Mayberry Phase 2 PUDSP
Description
Phase 2 of Mayberry development, consisting of original Tract K and nearby park land. 98 single-family lots, 3 park spaces, 1 community center/clubhouse, amenity space, and roadways.
Parcels
3400000472 3400000472 3400000473 3400000473 3414201024 3414201024 3414205001 3414205001 3414206001 3414206001
Applicant
Mayberry Communities LLC
Katie Carleo ( ccarleo@lja.com )
(719) 250-4313
Katie Carleo ( ccarleo@lja.com )
(719) 250-4313
File Prefix
PUDSP - Combined PUD/Preliminary Plan
Year
2025
Project Manager
Ryan Howser
Status
Active
Created
1/9/2025 10:18:56 AM

View: Review Comments | Submit/View Public Comment



Additional Documents (4)

Link Document Comment
View Neighbor Notice & Vicinity Map Notice of Application letters were mailed to surrounding property owners on 10/23/2025. JM
View Mailing Labels Mailing Labels for the 50 surrounding property owners that received notices. Cost = $37.00. JM
View Selected Range Selected Range was 500 feet. JM
View Returned Notices Returned Notice - Received 11/20/2025


Review Documents (30)

Link Document Date
View Application/Petition Form 6/15/2026 4:40:02 PM
View Landscape Plan drawings 6/15/2026 4:40:05 PM
View Legal Description (MS WORD Version required) 2/24/2025 9:28:35 AM
View Letter of Intent 6/15/2026 4:40:06 PM
View PUD Development Plan - can include phasing if proposed 6/15/2026 4:40:03 PM
View Title Commitment (Current within 30 days of submittal) 2/24/2025 9:28:37 AM
View Zoning Map 2/24/2025 9:28:38 AM
View Colorado Geological Survey Receipt 2/24/2025 10:11:49 AM
View Mineral Rights Certification 2/24/2025 10:19:25 AM
View PBMP Applicability Form 2/24/2025 9:28:39 AM
View Commitment letter from waste water service provider 2/24/2025 10:11:50 AM
View Commitment letter from water service provider 2/24/2025 10:11:49 AM
View Electric Provider Commitment Letter 2/24/2025 10:15:03 AM
View Natural Gas Commitment Letter 2/24/2025 10:19:26 AM
View Drainage Report - Preliminary 6/15/2026 4:40:06 PM
View Fire Protection Report 6/15/2026 4:40:04 PM
View Natural Features Report 2/24/2025 10:19:26 AM
View Soils & Geology Report 6/15/2026 4:40:05 PM
View Traffic Impact Study 6/15/2026 4:40:07 PM
View Wastewater Disposal Report 6/15/2026 4:40:08 PM
View Water Resources Report 6/15/2026 4:40:09 PM
View Water Supply Information Summary 6/15/2026 4:40:10 PM
View Combined Submittal 1 Comment Responses 6/15/2026 4:40:13 PM
View Deviation Request 6/16/2026 12:39:24 PM
View Deviation Request 6/16/2026 12:39:25 PM
View Deviation Request - T Intersections 6/15/2026 4:40:10 PM
View Legal Description 6/15/2026 4:40:11 PM
View ROW License Agreement Draft 6/15/2026 4:40:12 PM
View Special Standard PUD Zoning District 6/15/2026 4:40:11 PM
View Title Commitment 6/15/2026 4:40:12 PM



Events (146)

Date Comment
7/1/2026 11:01:54 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/1/2026 9:27:24 AM Request for Review Comments returned by County Attorney - Development Review
6/29/2026 9:15:28 AM Request for Review Comments returned by EPC Environmental Services
6/25/2026 11:24:28 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/25/2026 7:38:36 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/23/2026 1:44:13 PM Request for Review Comments returned by Colorado Parks and Wildlife
6/18/2026 12:04:08 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
6/16/2026 2:41:17 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
6/16/2026 2:27:47 PM Request for Review Comments returned by Schriever AFB
6/16/2026 12:59:20 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Darren Horstmeier on behalf of Schriever AFB
6/16/2026 12:59:19 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Chris Smith on behalf of Ellicott SD 22
6/16/2026 12:59:18 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Peggy Current on behalf of Ellicott Metro
6/16/2026 12:59:16 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Michael Henley on behalf of Ellicott Fire Protection District
6/16/2026 12:59:15 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Norma Houghton on behalf of Ellicott Fire Protection District
6/16/2026 12:59:14 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Trish Riber on behalf of Black Hills Energy-Aquila
6/16/2026 12:59:13 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
6/16/2026 12:59:13 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
6/16/2026 12:59:12 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
6/16/2026 12:59:10 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of Pikes Peak Regional Building Department
6/16/2026 12:59:09 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/16/2026 12:59:08 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
6/16/2026 12:59:07 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Travis Sauder on behalf of Colorado Parks and Wildlife
6/16/2026 12:59:06 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
6/16/2026 12:59:04 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Peter Chapman on behalf of Colorado Parks and Wildlife
6/16/2026 12:59:04 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Karen Voltura on behalf of Colorado Parks and Wildlife
6/16/2026 12:59:03 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
6/16/2026 12:59:02 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
6/16/2026 12:59:00 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Mike Matz on behalf of Colorado Division of Water Resources
6/16/2026 12:58:59 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Ailis Thyne on behalf of Colorado Division of Water Resources
6/16/2026 12:58:58 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
6/16/2026 12:58:57 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
6/16/2026 12:58:56 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
6/16/2026 12:58:55 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
6/16/2026 12:58:54 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of Colorado Department of Public Health and Environment
6/16/2026 12:58:53 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
6/16/2026 12:58:52 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by General Email on behalf of Mountain View Electric Association, Inc.
6/16/2026 12:58:50 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of Parks Advisory Board
6/16/2026 12:58:49 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Jeff Kramer on behalf of EPC Sheriff's Department
6/16/2026 12:58:49 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Lizz Floro on behalf of EPC Sheriff's Department
6/16/2026 12:58:47 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Public Works, County Engineer
6/16/2026 12:58:46 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Public Works, County Engineer
6/16/2026 12:58:45 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Parks Department
6/16/2026 12:58:44 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Catherine McGarvy on behalf of EPC Health Department
6/16/2026 12:58:43 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by HEAEH LandUse on behalf of EPC Health Department
6/16/2026 12:58:42 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Kathy Andrew on behalf of EPC Environmental Services
6/16/2026 12:58:41 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Zachary Jannusch on behalf of EPC DPW Stormwater
6/16/2026 12:58:40 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Mikayla Hartford on behalf of EPC DPW Stormwater
6/16/2026 12:58:39 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Glenn Reese on behalf of EPC DPW Stormwater
6/16/2026 12:58:38 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Erica Rylander on behalf of EPC DPW Stormwater
6/16/2026 12:58:37 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Christina Prete on behalf of EPC DPW Stormwater
6/16/2026 12:58:36 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Lori Seago on behalf of County Attorney - Water
6/16/2026 12:58:35 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Erika Keech on behalf of County Attorney - Water
6/16/2026 12:58:34 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by April Willie on behalf of County Attorney - Water
6/16/2026 12:58:33 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Lori Seago on behalf of County Attorney - Development Review
6/16/2026 12:58:32 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Erika Keech on behalf of County Attorney - Development Review
6/16/2026 12:58:32 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by April Willie on behalf of County Attorney - Development Review
6/16/2026 12:58:30 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Justin Kilgore on behalf of PCD Project Manager
6/16/2026 12:58:28 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
6/16/2026 12:58:26 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
6/16/2026 12:58:24 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of PCD Administrative Notice
6/16/2026 12:56:01 PM Submission Triaged
6/16/2026 12:39:34 PM Submission received from Applicant
6/15/2026 4:34:29 PM Submission request sent to Applicant
11/14/2025 8:29:20 AM Request for Review Comments returned by Schriever AFB
11/13/2025 6:59:28 AM Request for Review Comments returned by Parks Advisory Board
10/29/2025 7:15:10 PM Request for Review Comments returned by EPC Health Department
10/29/2025 3:05:49 PM Request for Review Comments returned by EPC Parks Department
10/29/2025 11:19:11 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/27/2025 2:55:39 PM Request for Review Comments returned by Ellicott Fire Protection District
10/24/2025 12:37:29 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
10/23/2025 4:19:15 PM Submission request sent to Applicant
10/23/2025 3:32:36 PM Request for Review Comments returned by PCD Engineering Division
10/23/2025 3:24:58 PM Request for Review Comments returned by PCD Administrative Notice
10/23/2025 3:04:47 PM Request for Review Comments returned by EPC DPW Stormwater
10/23/2025 2:51:57 PM Request for Review Comments returned by County Attorney - Water
10/22/2025 4:31:40 PM Request for Review Comments returned by PCD Project Manager
10/22/2025 4:30:47 PM Request for Review Comments email resent for Project Mayberry Phase 2 PUDSP for review by Justin Kilgore on behalf of PCD Project Manager
10/22/2025 4:29:55 PM Request for Review Comments returned by PCD Project Manager
10/22/2025 9:51:19 AM Request for Review Comments returned by Colorado Geological Survey
10/20/2025 2:25:59 PM Request for Review Comments returned by County Attorney - Development Review
10/17/2025 1:29:43 PM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
10/16/2025 4:35:05 PM Request for Review Comments returned by Pikes Peak Regional Building Department
10/10/2025 3:11:15 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/10/2025 10:59:00 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/3/2025 11:49:24 AM Request for Review Comments returned by EPC Environmental Services
10/2/2025 12:31:10 PM Request for Review Comments returned by Colorado Parks and Wildlife
10/1/2025 2:45:52 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Darren Horstmeier on behalf of Schriever AFB
10/1/2025 2:45:51 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Chris Smith on behalf of Ellicott SD 22
10/1/2025 2:45:49 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Peggy Current on behalf of Ellicott Metro
10/1/2025 2:45:48 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Michael Henley on behalf of Ellicott Fire Protection District
10/1/2025 2:45:47 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Norma Houghton on behalf of Ellicott Fire Protection District
10/1/2025 2:45:46 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Trish Riber on behalf of Black Hills Energy-Aquila
10/1/2025 2:45:45 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
10/1/2025 2:45:44 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
10/1/2025 2:45:43 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Adam Magoon on behalf of Black Hills Energy-Aquila
10/1/2025 2:45:42 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
10/1/2025 2:45:40 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of Pikes Peak Regional Building Department
10/1/2025 2:45:39 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/1/2025 2:45:38 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
10/1/2025 2:45:37 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Travis Sauder on behalf of Colorado Parks and Wildlife
10/1/2025 2:45:36 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
10/1/2025 2:45:35 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Peter Chapman on behalf of Colorado Parks and Wildlife
10/1/2025 2:45:34 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Karen Voltura on behalf of Colorado Parks and Wildlife
10/1/2025 2:45:33 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
10/1/2025 2:45:32 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/1/2025 2:45:31 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Ailis Thyne on behalf of Colorado Division of Water Resources
10/1/2025 2:45:30 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
10/1/2025 2:45:29 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
10/1/2025 2:45:28 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
10/1/2025 2:45:27 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/1/2025 2:45:26 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by General Email on behalf of Mountain View Electric Association, Inc.
10/1/2025 2:45:25 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of Parks Advisory Board
10/1/2025 2:45:23 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Jeff Kramer on behalf of EPC Sheriff's Department
10/1/2025 2:45:22 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
10/1/2025 2:45:21 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Andrew Prehm on behalf of EPC Sheriff's Department
10/1/2025 2:45:20 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Public Works, County Engineer
10/1/2025 2:45:19 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Public Works, County Engineer
10/1/2025 2:45:18 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of EPC Parks Department
10/1/2025 2:45:17 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Mike McCarthy on behalf of EPC Health Department
10/1/2025 2:45:16 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Catherine McGarvy on behalf of EPC Health Department
10/1/2025 2:45:15 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by HEAEH LandUse on behalf of EPC Health Department
10/1/2025 2:45:14 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Kathy Andrew on behalf of EPC Environmental Services
10/1/2025 2:45:12 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Zachary Jannusch on behalf of EPC DPW Stormwater
10/1/2025 2:45:11 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Mikayla Hartford on behalf of EPC DPW Stormwater
10/1/2025 2:45:10 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Glenn Reese on behalf of EPC DPW Stormwater
10/1/2025 2:45:09 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Christina Prete on behalf of EPC DPW Stormwater
10/1/2025 2:45:08 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Lori Seago on behalf of County Attorney - Water
10/1/2025 2:45:07 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Erika Keech on behalf of County Attorney - Water
10/1/2025 2:45:06 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by April Willie on behalf of County Attorney - Water
10/1/2025 2:45:05 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Lori Seago on behalf of County Attorney - Development Review
10/1/2025 2:45:04 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Erika Keech on behalf of County Attorney - Development Review
10/1/2025 2:45:03 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by April Willie on behalf of County Attorney - Development Review
10/1/2025 2:45:01 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Justin Kilgore on behalf of PCD Project Manager
10/1/2025 2:45:00 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
10/1/2025 2:44:59 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
10/1/2025 2:44:58 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by on behalf of PCD Administrative Notice
10/1/2025 2:44:57 PM Request for Review Comments email sent for Project Mayberry Phase 2 PUDSP for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
10/1/2025 7:48:01 AM Fees paid: 10/1/2025 (Receipt: 1011142)
2/25/2025 4:36:04 PM Payment Request sent: 2/25/2025
2/25/2025 4:36:03 PM File # Assigned: PUDSP251
2/25/2025 4:35:58 PM Submission Triaged
2/24/2025 2:12:37 PM Submission received from Applicant
1/9/2025 11:15:41 AM Submission request sent to Applicant
1/9/2025 10:31:09 AM Set Applicant to Mayberry Communities LLC
1/9/2025 10:19:02 AM Project Manager Assigned: Ryan Howser
1/9/2025 10:19:02 AM Project Created