Project Details

Search | All Active Projects


File Number
SP251
Project Name
Antler Range Preliminary Plan
Description
Preliminary plan for 84 single-family residential lots
Parcels
4218000022 4218000022
Applicant
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
EA Number
EA24123
File Prefix
SP - Preliminary Plan
Year
2025
Project Manager
Lisa Elgin
Status
Active
Created
11/7/2024 12:00:34 PM

View: Review Comments | Submit Public Comment



Additional Documents (3)

Link Document Comment
View State Engineer's Office Opinion Letter
View Water Supply Review and Recommendations
View Mineral Rights Certificate


Review Documents (28)

Link Document Date
View Application/Petition Form 5/16/2025 12:20:11 PM
View Legal Description (MS WORD Version required) 5/16/2025 12:19:17 PM
View Letter of Intent 9/25/2025 10:49:56 AM
View Preliminary Plan Drawings 1/6/2026 1:53:11 PM
View Title Commitment (Current within 30 days of submittal) 2/3/2025 11:44:10 AM
View Clearance Letter - USF&W 9/8/2025 2:20:47 PM
View Colorado Geological Survey Receipt 2/3/2025 11:44:10 AM
View Deviation Request 9/15/2025 5:25:31 PM
View Electric Provider Commitment Letter 2/5/2025 12:25:28 PM
View Natural Gas Commitment Letter 2/11/2025 4:39:46 PM
View Drainage Report - Preliminary 11/18/2025 4:22:53 PM
View FEMA LOMR, CLOMR, LOMA 2/17/2025 12:20:31 PM
View Fire Protection Report 9/23/2025 11:13:58 AM
View Natural Features Report 9/23/2025 7:29:19 AM
View Noxious Weed Management Plan 9/15/2025 1:46:46 PM
View OWTS Report 8/4/2025 6:08:12 PM
View Soils & Geology Report 12/3/2025 8:26:45 AM
View Traffic Impact Study 9/5/2025 1:55:16 PM
View Water Resources Report 7/7/2025 10:42:59 AM
View Water Supply Information Summary 2/10/2025 8:05:49 AM
View Deviation Request 9/25/2025 11:27:30 AM
View Fire Commitment 2/5/2025 9:29:04 AM
View PBMP Applicability Form 2/10/2025 7:58:36 AM
View PDR Comment Response 7/22/2025 5:13:41 PM
View PP Comment Response 7/22/2025 5:13:42 PM
View Soils & Geology Report 9/23/2025 7:24:40 AM
View Soils Report 1/2/2026 8:16:54 AM
View TIS Comment Response 6/30/2025 7:35:20 AM



Events (200)

Date Comment
1/26/2026 4:57:39 PM Request for Review Comments returned by EPC Health Department
1/22/2026 10:21:50 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
1/22/2026 10:21:49 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
1/22/2026 10:21:48 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
1/20/2026 8:37:38 AM Request for Review Comments returned by Colorado Geological Survey
1/15/2026 11:27:08 AM Request for Review Comments email resent for Project Antler Range Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/15/2026 11:14:22 AM Request for Review Comments returned by PCD Project Manager
1/7/2026 11:19:51 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
1/7/2026 11:11:20 AM Submission Triaged
1/6/2026 1:54:10 PM Submission received from Applicant
1/6/2026 1:50:52 PM Submission request sent to Applicant
1/5/2026 11:00:58 AM Submission Triaged
1/5/2026 10:41:20 AM Submission received from Applicant
1/5/2026 10:39:09 AM Submission request sent to Applicant
1/5/2026 10:38:32 AM Submission Triaged
1/2/2026 8:18:54 AM Submission received from Applicant
12/23/2025 4:02:59 PM Submission request sent to Applicant
12/23/2025 4:01:28 PM Request for Review Comments returned by PCD Project Manager
12/19/2025 10:55:22 AM Request for Review Comments returned by PCD Engineering Division
12/15/2025 2:29:27 PM Request for Review Comments returned by Falcon Fire Protection District
12/9/2025 11:39:26 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
12/9/2025 11:39:25 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
12/9/2025 11:39:24 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
12/9/2025 11:39:22 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
12/9/2025 11:39:21 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
12/9/2025 11:39:20 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
12/9/2025 11:39:18 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
12/9/2025 11:27:35 AM Submission Triaged
12/3/2025 8:26:54 AM Submission received from Applicant
11/13/2025 12:44:23 PM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/10/2025 8:21:05 AM Request for Review Comments email resent for Project Antler Range Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/9/2025 11:04:23 AM Request for Review Comments returned by Colorado Geological Survey
11/4/2025 11:53:40 AM Submission request sent to Applicant
11/3/2025 3:48:48 PM Request for Review Comments returned by PCD Engineering Division
11/3/2025 12:08:11 PM Request for Review Comments returned by PCD Project Manager
11/3/2025 11:55:11 AM Request for Review Comments email resent for Project Antler Range Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/30/2025 4:52:00 PM Request for Review Comments returned by El Paso County Conservation Dist
10/30/2025 1:46:12 PM Request for Review Comments returned by EPC Stormwater Review
10/29/2025 12:31:23 PM Request for Review Comments returned by Falcon Fire Protection District
10/29/2025 12:16:22 PM Request for Review Comments sent for Project Antler Range Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
10/29/2025 11:19:26 AM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
10/28/2025 12:30:08 PM Request for Review Comments returned by Falcon Fire Protection District
10/24/2025 12:24:39 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
10/20/2025 3:21:06 PM Request for Review Comments returned by RBD Floodplain
10/20/2025 11:59:23 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
10/20/2025 11:59:22 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
10/20/2025 11:59:21 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
10/20/2025 11:59:20 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/20/2025 11:59:19 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/20/2025 11:59:18 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/20/2025 11:59:17 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
10/20/2025 11:59:16 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
10/20/2025 11:59:15 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
10/20/2025 11:59:14 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
10/20/2025 11:59:12 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
10/20/2025 11:59:11 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
10/20/2025 11:59:10 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
10/20/2025 11:59:07 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
9/26/2025 9:28:07 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
9/26/2025 9:28:06 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
9/26/2025 9:28:05 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
9/26/2025 9:28:04 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
9/26/2025 9:28:03 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by on behalf of El Paso County Conservation Dist
9/26/2025 9:28:02 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
9/26/2025 9:28:01 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
9/26/2025 9:28:00 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
9/26/2025 9:27:59 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Trish Riber on behalf of Black Hills Energy-Aquila
9/26/2025 9:27:58 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
9/26/2025 9:27:57 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
9/26/2025 9:27:56 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
9/26/2025 9:27:55 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
9/26/2025 9:27:54 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
9/26/2025 9:27:52 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Mike Till on behalf of Colorado State Forest Service
9/26/2025 9:27:51 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
9/26/2025 9:27:50 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
9/26/2025 9:27:49 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
9/26/2025 9:27:48 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
9/26/2025 9:27:47 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
9/26/2025 9:26:18 AM Submission Triaged
9/25/2025 11:27:35 AM Submission received from Applicant
9/2/2025 2:30:04 PM Submission request sent to Applicant
8/29/2025 10:39:00 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/28/2025 5:10:31 PM Request for Review Comments returned by PCD Engineering Division
8/28/2025 4:30:11 PM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
8/28/2025 2:25:15 PM Request for Review Comments returned by County Attorney - Water
8/28/2025 1:46:26 PM Request for Review Comments returned by PCD Project Manager
8/28/2025 11:53:22 AM Request for Review Comments returned by EPC Stormwater Review
8/20/2025 8:52:29 AM Request for Review Comments returned by EPC Environmental Services
8/18/2025 10:37:33 AM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/15/2025 8:58:35 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
8/14/2025 2:47:05 PM Request for Review Comments returned by RBD Floodplain
8/14/2025 9:40:20 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
8/14/2025 9:36:52 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
8/14/2025 9:36:51 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
8/14/2025 9:36:50 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
8/14/2025 9:36:49 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/14/2025 9:36:48 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/14/2025 9:36:47 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/14/2025 9:36:46 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
8/14/2025 9:36:45 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
8/14/2025 9:36:44 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Peter Chapman on behalf of Colorado Parks and Wildlife
8/14/2025 9:36:43 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
8/14/2025 9:36:42 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
8/14/2025 9:36:40 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
8/14/2025 9:36:39 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
8/14/2025 9:36:38 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
8/14/2025 9:36:38 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
8/14/2025 9:36:36 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
8/14/2025 9:36:35 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
8/14/2025 9:36:34 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
8/14/2025 9:36:33 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by April Willie on behalf of County Attorney - Water
8/14/2025 9:36:31 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
8/14/2025 9:36:30 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
8/14/2025 9:36:29 AM Request for Review Comments email sent for Project Antler Range Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
8/14/2025 9:08:41 AM Submission Triaged
8/13/2025 3:02:14 PM Submission received from Applicant
8/11/2025 2:50:18 PM Submission request sent to Applicant
8/11/2025 11:59:53 AM Submission request sent to Applicant
8/11/2025 11:47:32 AM Submission Triaged
8/8/2025 11:18:24 AM Submission received from Applicant
5/27/2025 1:44:57 PM Submission request sent to Applicant
3/31/2025 2:50:55 PM Request for Review Comments returned by Black Forest Land Use Committee
3/28/2025 6:44:21 PM Request for Review Comments returned by EPC Health Department
3/28/2025 9:22:07 AM Request for Review Comments returned by Colorado Division of Water Resources
3/20/2025 1:34:00 PM Request for Review Comments returned by PCD Project Manager
3/20/2025 1:32:49 PM Request for Review Comments email resent for Project Antlers Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
3/20/2025 11:32:34 AM Submission request sent to Applicant
3/20/2025 11:28:31 AM Request for Review Comments returned by PCD Project Manager
3/17/2025 6:33:33 PM Request for Review Comments returned by PCD Engineering Division
3/17/2025 4:14:40 PM Request for Review Comments returned by EPC Stormwater Review
3/17/2025 2:22:25 PM Request for Review Comments returned by County Attorney - Water
3/17/2025 11:34:01 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/17/2025 11:18:00 AM Request for Review Comments returned by Falcon School District 49
3/17/2025 7:38:07 AM Request for Review Comments returned by Colorado Geological Survey
3/13/2025 7:47:04 AM Request for Review Comments returned by Parks Advisory Board
3/10/2025 12:48:49 PM Request for Review Comments returned by Falcon Fire Protection District
3/6/2025 2:01:28 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/4/2025 3:36:34 PM Request for Review Comments email resent for Project Antlers Range Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/4/2025 11:05:26 AM Request for Review Comments returned by EPC Parks Department
2/26/2025 3:19:37 PM Request for Review Comments returned by Black Forest Land Use Committee
2/25/2025 3:13:55 PM Request for Review Comments returned by EPC Environmental Services
2/24/2025 12:59:39 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/24/2025 12:25:11 PM Request for Review Comments returned by RBD Floodplain
2/24/2025 10:50:28 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
2/24/2025 9:10:06 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
2/24/2025 9:10:05 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
2/24/2025 9:10:04 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
2/24/2025 9:10:03 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
2/24/2025 9:10:02 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
2/24/2025 9:10:01 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
2/24/2025 9:10:00 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
2/24/2025 9:09:59 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of El Paso County Conservation Dist
2/24/2025 9:09:57 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
2/24/2025 9:09:56 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
2/24/2025 9:09:55 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
2/24/2025 9:09:54 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
2/24/2025 9:09:53 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
2/24/2025 9:09:52 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
2/24/2025 9:09:51 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
2/24/2025 9:09:50 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
2/24/2025 9:09:48 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
2/24/2025 9:09:47 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
2/24/2025 9:09:46 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
2/24/2025 9:09:45 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/24/2025 9:09:44 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
2/24/2025 9:09:43 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
2/24/2025 9:09:41 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Mike Till on behalf of Colorado State Forest Service
2/24/2025 9:09:40 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
2/24/2025 9:09:39 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
2/24/2025 9:09:38 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
2/24/2025 9:09:37 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Evelyn galanephillips on behalf of Falcon School District 49
2/24/2025 9:09:36 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of Parks Advisory Board
2/24/2025 9:09:34 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/24/2025 9:09:33 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
2/24/2025 9:09:32 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
2/24/2025 9:09:31 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
2/24/2025 9:09:30 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
2/24/2025 9:09:29 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
2/24/2025 9:09:28 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
2/24/2025 9:09:27 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
2/24/2025 9:09:26 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by on behalf of EPC Parks Department
2/24/2025 9:09:25 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
2/24/2025 9:09:24 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
2/24/2025 9:09:22 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
2/24/2025 9:09:21 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
2/24/2025 9:09:20 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
2/24/2025 9:09:19 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
2/24/2025 9:09:18 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by April Willie on behalf of County Attorney - Water
2/24/2025 9:09:16 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
2/24/2025 9:09:14 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
2/24/2025 9:09:14 AM Request for Review Comments email sent for Project Antlers Range Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
2/20/2025 8:34:28 AM Project Manager Assigned: Lisa Elgin
2/19/2025 4:09:36 PM Fees paid: 2/19/2025 (Receipt: 1010187)
2/19/2025 2:48:52 PM Payment Request sent: 2/19/2025
2/19/2025 2:48:51 PM File # Assigned: SP251
2/19/2025 2:48:48 PM Submission Triaged
2/17/2025 12:39:42 PM Submission received from Applicant
11/13/2024 8:13:06 AM Submission request sent to Applicant
11/7/2024 12:00:40 PM EA Assigned: EA24123
11/7/2024 12:00:40 PM Project Created