8/8/2025 1:26:08 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/8/2025 11:49:21 AM
|
Request for Review Comments returned by County Attorney - Water
|
8/7/2025 3:38:49 PM
|
Submission request sent to Applicant
|
8/7/2025 2:05:14 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/7/2025 7:58:59 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/6/2025 7:31:53 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/6/2025 5:35:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/6/2025 2:52:35 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/6/2025 2:25:58 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
8/6/2025 11:14:38 AM
|
Request for Review Comments returned by USAFA Base Planner
|
8/4/2025 9:19:03 AM
|
Fees paid: 8/4/2025 (Receipt: 1010863)
|
7/31/2025 3:30:46 PM
|
Request for Review Comments returned by EPC Fire and Wildfire Program Manager
|
7/25/2025 3:41:18 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/23/2025 1:55:16 PM
|
Payment Request sent: 7/23/2025
|
7/23/2025 10:30:08 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
7/23/2025 8:41:10 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
|
7/23/2025 8:39:26 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Sabrina Untal on behalf of USAFA Base Planner
|
7/23/2025 8:39:25 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
7/23/2025 8:39:24 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Amy Kelley on behalf of USAFA Base Planner
|
7/23/2025 8:39:23 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of USAFA Base Planner
|
7/23/2025 8:39:22 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/23/2025 8:39:21 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/23/2025 8:39:20 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/23/2025 8:39:18 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources
|
7/23/2025 8:39:17 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
|
7/23/2025 8:39:16 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
7/23/2025 8:39:15 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
7/23/2025 8:39:14 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
7/23/2025 8:39:13 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
7/23/2025 8:39:12 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/23/2025 8:39:11 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/23/2025 8:39:10 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
7/23/2025 8:39:09 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
7/23/2025 8:39:08 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
7/23/2025 8:39:07 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by April Willie on behalf of County Attorney - Water
|
7/23/2025 8:39:05 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
7/23/2025 8:39:04 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
7/23/2025 8:39:03 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
7/23/2025 8:39:02 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
7/23/2025 8:39:00 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/23/2025 8:38:58 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
7/23/2025 8:38:57 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of PCD Administrative Notice
|
7/23/2025 8:25:32 AM
|
Submission Triaged
|
7/23/2025 8:20:51 AM
|
Submission received from Applicant
|
7/2/2025 11:37:59 AM
|
Submission request sent to Applicant
|
6/11/2025 1:22:55 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/22/2025 3:52:55 PM
|
Project Manager Assigned: Joe Letke
|
5/22/2025 11:18:31 AM
|
Request for Review Comments email resent for Project Gleneagle View Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
|
5/22/2025 9:19:24 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/12/2025 3:10:24 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
5/8/2025 1:02:03 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/2/2025 1:37:40 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/1/2025 2:19:01 PM
|
Submission request sent to Applicant
|
5/1/2025 2:17:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/1/2025 1:36:29 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/1/2025 12:17:59 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/30/2025 5:04:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/30/2025 10:32:27 AM
|
Request for Review Comments returned by USAFA Base Planner
|
4/28/2025 11:16:44 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/24/2025 2:38:06 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
4/24/2025 11:36:26 AM
|
Request for Review Comments returned by County Attorney - Water
|
4/21/2025 7:20:49 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
4/17/2025 1:16:58 PM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Sabrina Untal on behalf of USAFA Base Planner
|
4/17/2025 1:16:57 PM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
4/17/2025 1:16:56 PM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Amy Kelley on behalf of USAFA Base Planner
|
4/17/2025 1:16:55 PM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of USAFA Base Planner
|
4/17/2025 10:21:07 AM
|
Request for Review Comments returned by EPC Environmental Services
|
4/17/2025 7:42:10 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
4/16/2025 11:03:23 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/16/2025 11:02:38 AM
|
Request for Review Comments returned by EPC Parks Department
|
4/15/2025 1:39:59 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/14/2025 12:33:48 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/14/2025 7:50:56 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/11/2025 11:07:33 AM
|
Request for Review Comments returned by Schriever AFB
|
4/10/2025 12:15:09 PM
|
Request for Review Comments returned by RBD Floodplain
|
4/10/2025 11:50:05 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
4/10/2025 11:50:05 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
|
4/10/2025 11:50:03 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Darren Horstmeier on behalf of Schriever AFB
|
4/10/2025 11:50:02 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
4/10/2025 11:50:01 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
4/10/2025 11:50:00 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:59 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:58 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Erica Carter on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:57 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:56 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:55 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:54 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Billy Richard on behalf of El Paso County Conservation Dist
|
4/10/2025 11:49:52 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Jeff Hodge on behalf of Donala Water and San Dist
|
4/10/2025 11:49:51 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Christina Hawker on behalf of Donala Water and San Dist
|
4/10/2025 11:49:50 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/10/2025 11:49:49 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/10/2025 11:49:48 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
4/10/2025 11:49:47 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
|
4/10/2025 11:49:46 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
4/10/2025 11:49:45 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
4/10/2025 11:49:44 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
4/10/2025 11:49:43 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
4/10/2025 11:49:42 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
4/10/2025 11:49:41 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
4/10/2025 11:49:40 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
4/10/2025 11:49:38 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Keith Curtis on behalf of RBD Floodplain
|
4/10/2025 11:49:37 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
4/10/2025 11:49:36 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/10/2025 11:49:35 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
4/10/2025 11:49:34 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/10/2025 11:49:33 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/10/2025 11:49:32 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/10/2025 11:49:31 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
4/10/2025 11:49:29 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
4/10/2025 11:49:28 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
4/10/2025 11:49:27 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
4/10/2025 11:49:26 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
4/10/2025 11:49:25 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/10/2025 11:49:24 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
4/10/2025 11:49:23 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/10/2025 11:49:22 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
4/10/2025 11:49:21 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
4/10/2025 11:49:20 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
4/10/2025 11:49:18 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of Parks Advisory Board
|
4/10/2025 11:49:17 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
4/10/2025 11:49:16 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/10/2025 11:49:15 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/10/2025 11:49:14 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
4/10/2025 11:49:13 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
4/10/2025 11:49:12 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
4/10/2025 11:49:11 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
4/10/2025 11:49:10 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of EPC Public Works, County Engineer
|
4/10/2025 11:49:09 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of EPC Public Works, County Engineer
|
4/10/2025 11:49:07 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by on behalf of EPC Parks Department
|
4/10/2025 11:49:06 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Mike McCarthy on behalf of EPC Health Department
|
4/10/2025 11:49:05 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
4/10/2025 11:49:04 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
|
4/10/2025 11:49:03 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/10/2025 11:49:02 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
4/10/2025 11:49:01 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
4/10/2025 11:49:00 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by April Willie on behalf of County Attorney - Water
|
4/10/2025 11:48:59 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/10/2025 11:48:57 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
4/10/2025 11:48:56 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
4/10/2025 11:48:55 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
4/10/2025 11:48:53 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/10/2025 11:48:52 AM
|
Request for Review Comments email sent for Project Gleneagle View Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
4/8/2025 8:54:20 AM
|
Fees paid: 4/8/2025 (Receipt: 1010392)
|
3/21/2025 2:54:21 PM
|
Payment Request sent: 3/21/2025
|
3/21/2025 2:54:21 PM
|
File # Assigned: SF2510
|
3/21/2025 2:54:15 PM
|
Submission Triaged
|
3/20/2025 10:51:07 AM
|
Submission received from Applicant
|
9/3/2024 10:57:24 AM
|
Submission request sent to Applicant
|
9/3/2024 8:46:59 AM
|
Project Manager Assigned: Ashlyn Mathy
|
9/3/2024 8:46:59 AM
|
EA Assigned: EA2496
|
9/3/2024 8:46:59 AM
|
Project Created
|