7/30/2025 11:44:38 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/29/2025 10:37:09 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/29/2025 10:37:07 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
7/29/2025 10:34:37 AM
|
Submission Triaged
|
7/25/2025 5:58:09 PM
|
Submission received from Applicant
|
7/10/2025 7:06:12 AM
|
Submission request sent to Applicant
|
7/9/2025 5:27:24 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/8/2025 8:09:09 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/8/2025 8:09:07 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
7/8/2025 7:20:07 AM
|
Submission Triaged
|
7/7/2025 4:41:52 PM
|
Submission received from Applicant
|
7/3/2025 9:31:50 AM
|
Fees paid: 7/3/2025 (Receipt: 1010732)
|
7/2/2025 9:15:09 AM
|
Submission request sent to Applicant
|
7/1/2025 1:34:43 PM
|
Payment Request sent: 7/1/2025
|
6/3/2025 3:50:09 PM
|
Project Manager Assigned: Joe Letke
|
5/30/2025 8:13:11 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
5/29/2025 2:56:14 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/29/2025 1:09:43 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/28/2025 10:47:44 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/27/2025 2:28:55 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/16/2025 9:32:29 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
5/16/2025 9:32:28 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/16/2025 9:32:27 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/16/2025 9:32:26 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
5/16/2025 9:32:25 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
5/16/2025 9:32:24 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
5/16/2025 9:32:23 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
5/16/2025 9:32:22 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
5/16/2025 9:32:20 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/16/2025 9:32:18 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
5/16/2025 9:30:44 AM
|
Submission Triaged
|
5/16/2025 8:25:17 AM
|
Submission received from Applicant
|
5/16/2025 8:14:51 AM
|
Submission request sent to Applicant
|
5/16/2025 8:14:34 AM
|
Submission Triaged
|
5/15/2025 7:51:51 PM
|
Submission received from Applicant
|
4/22/2025 12:22:46 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/17/2025 2:26:38 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/15/2025 2:19:24 PM
|
Submission request sent to Applicant
|
4/15/2025 10:25:42 AM
|
Submission request sent to Applicant
|
4/15/2025 10:23:44 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/15/2025 10:23:43 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
4/15/2025 10:23:42 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
4/15/2025 10:17:34 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/15/2025 9:06:00 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/14/2025 8:30:15 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/11/2025 8:26:22 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
4/10/2025 2:25:30 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/7/2025 1:36:20 PM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
4/7/2025 1:36:19 PM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
|
4/7/2025 11:39:26 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
4/7/2025 11:39:25 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
4/7/2025 11:39:24 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by April Willie on behalf of County Attorney - Water
|
4/7/2025 11:39:23 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/7/2025 11:39:22 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
4/7/2025 11:39:21 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
3/31/2025 8:54:07 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/31/2025 8:54:06 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/31/2025 8:54:05 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/31/2025 8:54:04 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
3/31/2025 8:54:03 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
3/31/2025 8:54:02 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by April Willie on behalf of County Attorney - Water
|
3/31/2025 8:54:01 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
3/31/2025 8:53:59 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/31/2025 8:53:57 AM
|
Request for Review Comments email sent for Project Table Rock Homesteads Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
3/31/2025 8:52:05 AM
|
Submission Triaged
|
3/28/2025 2:45:27 PM
|
Submission received from Applicant
|
3/19/2025 12:00:37 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
3/6/2025 1:38:30 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
2/26/2025 12:08:58 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/20/2025 3:41:22 PM
|
Submission request sent to Applicant
|
2/20/2025 3:19:46 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/20/2025 3:14:04 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/20/2025 2:48:22 PM
|
Submission request sent to Applicant
|
2/20/2025 2:36:52 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/20/2025 8:44:14 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/18/2025 9:00:00 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/14/2025 5:39:37 PM
|
Request for Review Comments returned by EPC Health Department
|
2/13/2025 10:53:59 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/13/2025 9:33:56 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/12/2025 4:15:02 PM
|
Request for Review Comments returned by Parks Advisory Board
|
1/31/2025 1:23:41 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/30/2025 4:01:04 PM
|
Request for Review Comments returned by EPC Parks Department
|
1/30/2025 2:48:09 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/30/2025 10:39:57 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/29/2025 1:11:49 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/29/2025 10:37:20 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/29/2025 8:40:33 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/29/2025 8:40:32 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of Monument
|
1/29/2025 8:40:31 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38
|
1/29/2025 8:40:30 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Melissa Andrews on behalf of Lewis Palmer 38
|
1/29/2025 8:40:29 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Brett Ridgway on behalf of Lewis Palmer 38
|
1/29/2025 8:40:28 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:27 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:26 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:25 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Erica Carter on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:24 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:22 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:21 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:20 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Billy Richard on behalf of El Paso County Conservation Dist
|
1/29/2025 8:40:19 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/29/2025 8:40:18 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/29/2025 8:40:17 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
1/29/2025 8:40:15 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
1/29/2025 8:40:14 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
1/29/2025 8:40:13 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
1/29/2025 8:40:12 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
1/29/2025 8:40:11 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
1/29/2025 8:40:10 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
1/29/2025 8:40:09 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/29/2025 8:40:08 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/29/2025 8:40:07 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/29/2025 8:40:06 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/29/2025 8:40:04 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
1/29/2025 8:40:03 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Mike Till on behalf of Colorado State Forest Service
|
1/29/2025 8:40:02 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
1/29/2025 8:40:01 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
1/29/2025 8:40:00 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
1/29/2025 8:39:59 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
1/29/2025 8:39:58 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/29/2025 8:39:56 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/29/2025 8:39:55 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/29/2025 8:39:54 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/29/2025 8:39:53 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/29/2025 8:39:52 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/29/2025 8:39:51 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of Parks Advisory Board
|
1/29/2025 8:39:49 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/29/2025 8:39:48 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/29/2025 8:39:47 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
1/29/2025 8:39:46 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
1/29/2025 8:39:45 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
1/29/2025 8:39:44 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
1/29/2025 8:39:43 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of EPC Public Works, County Engineer
|
1/29/2025 8:39:42 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of EPC Public Works, County Engineer
|
1/29/2025 8:39:41 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by on behalf of EPC Parks Department
|
1/29/2025 8:39:40 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Mike McCarthy on behalf of EPC Health Department
|
1/29/2025 8:39:39 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
1/29/2025 8:39:37 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
|
1/29/2025 8:39:36 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Jim Schanel on behalf of EPC Fire Marshal
|
1/29/2025 8:39:35 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/29/2025 8:39:34 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
1/29/2025 8:39:33 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
1/29/2025 8:39:32 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by April Willie on behalf of County Attorney - Water
|
1/29/2025 8:39:30 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
1/29/2025 8:39:29 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
1/29/2025 8:39:28 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
1/29/2025 8:39:27 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
1/29/2025 8:39:25 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/29/2025 8:39:24 AM
|
Request for Review Comments email sent for Project Jarosz Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
1/28/2025 10:32:02 AM
|
Fees paid: 1/28/2025 (Receipt: 1010099)
|
1/27/2025 4:09:08 PM
|
Payment Request sent: 1/27/2025
|
1/27/2025 4:09:08 PM
|
File # Assigned: SF254
|
1/27/2025 4:09:03 PM
|
Submission Triaged
|
1/24/2025 6:24:06 PM
|
Submission received from Applicant
|
6/3/2024 11:26:31 AM
|
Submission request sent to Applicant
|
6/3/2024 8:12:47 AM
|
Project Manager Assigned: Ashlyn Mathy
|
6/3/2024 8:12:47 AM
|
EA Assigned: EA2463
|
6/3/2024 8:12:47 AM
|
Project Created
|