Project Details

Search | All Active Projects


File Number
SF2242
Project Name
Eagleview Final Plat
Description
SP-21-006 for preliminary plan file number.
Parcels
5226000001 5226000001 5226000002 5226000002
Applicant
Joe DesJardin
Joe DesJardin ( JDesJardin@proterraco.com )
(307) 899-2020
Joe DesJardin ( JDesJardin@proterraco.com )
(307) 899-2020
EA Number
EA2186
File Prefix
SF - Final Plat
Year
2022
Project Manager
Ryan Howser
Status
Active
Created
11/23/2022 12:05:36 PM

View: Review Comments


Approved Documents (13)

Project pending final approval. Some approved documents are available prior to the overall Approval.

Link Document
View Grading & Erosion Control checklist
View Financial Assurance Forms
View PBMP Applicability Form
View PDB/BMP Operations & Maintenance Manual
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)
View SWMP checklist
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Final
View Channel O&M
View ESQCP
View State Non-Jurisdictional Water Impoundment


Additional Documents (3)

Link Document Comment
View BOCC Staff Report - final with attachments Staff Report for the Board of County Commissioners hearing on 03/13/2025. JM
View BOCC Hearing Agenda Hearing Agenda for the Board of County Commissioners hearing on 03/13/2025. JM
View Recorded BOCC Resolution SF2242 RECORDED BOCC RES 25-80


Review Documents (45)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 12/23/2022 11:54:28 AM
View Application/Petition Form 12/20/2022 3:39:59 PM
View Grading & Erosion Control checklist 4/18/2024 6:37:20 AM
View Legal Description (MS WORD Version required) 11/23/2022 3:07:50 PM
View Letter of Intent 8/26/2024 2:09:37 PM
View OWTS Report 11/23/2022 3:08:03 PM
View Title Commitment (Current within 30 days of submittal) 12/15/2022 2:05:01 PM
View Vicinity/Location Map 11/23/2022 3:07:59 PM
View Financial Assurance Forms 8/26/2024 2:12:53 PM
View Mineral Rights Certification 12/20/2022 3:41:55 PM
View PBMP Applicability Form 8/26/2024 2:09:38 PM
View PDB/BMP Operations & Maintenance Manual 11/15/2024 2:23:52 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 12/23/2022 10:27:08 AM
View Subdivision Improvement Agreement (MS Word version required) 12/20/2024 10:06:22 AM
View SWMP checklist 4/18/2024 6:34:00 AM
View Construction Drawings (Plans/Profiles) 11/15/2024 2:17:11 PM
View Final Plat Drawings 11/15/2024 2:17:13 PM
View Grading & Erosion Control Plan 11/15/2024 2:17:56 PM
View Storm Water Management Plan (SWMP) 4/18/2024 7:15:03 PM
View Deviation Request 12/15/2022 10:00:09 AM
View Electric Provider Commitment Letter 11/23/2022 3:07:46 PM
View Fire Commitment Letter 11/23/2022 3:07:47 PM
View Natural Gas Commitment Letter 11/23/2022 3:07:55 PM
View Drainage Report - Final 9/30/2024 12:43:27 PM
View Fire Protection Report 4/17/2024 9:45:51 AM
View Natural Features Report 11/23/2022 3:07:51 PM
View Noxious Weed Management Plan 11/23/2022 3:07:56 PM
View Soils & Geology Report 10/18/2024 2:55:05 PM
View Subdivision Summary Sheet 12/23/2022 9:44:08 AM
View Traffic Impact Study 12/15/2022 10:00:08 AM
View Channel Maintenance Agreement 5/13/2025 1:26:16 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 5/27/2025 3:39:09 PM
View Escrow Agreement 12/11/2024 9:42:33 AM
View Water Resources Report 11/23/2022 3:07:59 PM
View Water Supply Information Summary 11/23/2022 3:08:02 PM
View Applicant Comment Response - to CGS 10/18/2024 2:55:07 PM
View CD Comment Response 8/26/2024 2:59:34 PM
View Channel O&M 11/15/2024 2:23:53 PM
View Closures Sheet (Survey) 12/16/2022 9:58:34 AM
View ESQCP 8/26/2024 2:12:53 PM
View FAE Comment Response 8/26/2024 3:00:10 PM
View FDR Comment Response 8/26/2024 3:08:26 PM
View FP Comment Response 8/28/2024 8:25:17 AM
View GEC Comment Response 8/26/2024 3:01:11 PM
View State Non-Jurisdictional Water Impoundment 8/28/2024 1:52:44 PM



Events (229)

Date Comment
6/4/2025 8:24:36 AM Project Ready for Approval requests. Review Comment period is complete.
6/3/2025 2:55:51 PM Request for Review Comments returned by County Attorney - Development Review
5/28/2025 7:54:34 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
5/28/2025 7:54:33 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
5/28/2025 7:54:32 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
5/28/2025 7:53:55 AM Submission Triaged
5/27/2025 3:39:16 PM Submission received from Applicant
5/22/2025 11:23:48 AM Submission request sent to Applicant
5/22/2025 11:16:34 AM Request for Review Comments returned by County Attorney - Development Review
5/13/2025 1:39:20 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
5/13/2025 1:39:19 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
5/13/2025 1:39:18 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
5/13/2025 1:33:32 PM Submission Triaged
5/13/2025 1:30:51 PM Submission received from Applicant
2/12/2025 7:56:19 AM Submission request sent to Applicant
2/11/2025 2:49:56 PM Request for Review Comments returned by County Attorney - Development Review
2/4/2025 3:30:29 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
2/4/2025 3:30:28 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
2/4/2025 3:30:27 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
2/4/2025 3:28:15 PM Submission Triaged
2/4/2025 2:20:55 PM Submission received from Applicant
1/29/2025 11:33:37 AM Submission request sent to Applicant
1/28/2025 11:28:17 AM Request for Review Comments returned by County Attorney - Development Review
1/21/2025 8:15:40 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/21/2025 8:15:39 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
1/21/2025 8:15:38 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
1/21/2025 8:14:36 AM Submission Triaged
1/21/2025 8:09:32 AM Submission received from Applicant
12/17/2024 11:14:40 AM Submission request sent to Applicant
12/17/2024 10:36:53 AM Request for Review Comments returned by County Attorney - Development Review
12/11/2024 1:58:20 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
12/11/2024 1:58:18 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
12/11/2024 1:58:16 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
12/11/2024 1:57:19 PM Submission Triaged
12/11/2024 9:42:39 AM Submission received from Applicant
12/6/2024 4:48:10 PM Submission request sent to Applicant
12/6/2024 3:18:57 PM Request for Review Comments returned by County Attorney - Development Review
12/2/2024 5:21:04 PM Request for Review Comments returned by PCD Engineering Division
12/2/2024 7:47:40 AM Request for Review Comments returned by EPC Stormwater Review
11/22/2024 11:53:28 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
11/22/2024 11:53:26 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
11/22/2024 11:53:25 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
11/22/2024 11:52:48 AM Submission Triaged
11/22/2024 11:17:12 AM Submission received from Applicant
11/21/2024 7:32:41 AM Submission request sent to Applicant
11/20/2024 5:51:32 PM Request for Review Comments returned by County Attorney - Development Review
11/19/2024 7:17:16 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
11/19/2024 7:17:15 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
11/19/2024 7:17:13 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
11/19/2024 7:17:11 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
11/19/2024 7:17:09 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
11/19/2024 7:17:07 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
11/19/2024 7:17:05 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
11/19/2024 7:17:01 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
11/19/2024 7:15:38 AM Submission Triaged
11/15/2024 3:15:16 PM Submission received from Applicant
11/12/2024 7:07:48 AM Submission request sent to Applicant
11/8/2024 2:52:35 PM Request for Review Comments returned by County Attorney - Development Review
11/5/2024 4:49:11 PM Submission request sent to Applicant
11/5/2024 8:35:57 AM Submission request sent to Applicant
11/1/2024 9:54:02 PM Request for Review Comments returned by PCD Engineering Division
10/31/2024 2:23:38 PM Request for Review Comments returned by Colorado Geological Survey
10/30/2024 3:01:46 PM Request for Review Comments returned by EPC Stormwater Review
10/25/2024 1:05:05 PM Request for Review Comments returned by Pikes Peak Regional Building Department
10/23/2024 1:06:16 PM Request for Review Comments returned by PCD Project Manager
10/22/2024 7:50:20 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/18/2024 4:51:29 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by on behalf of Pikes Peak Regional Building Department
10/18/2024 4:51:27 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/18/2024 4:51:26 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
10/18/2024 4:51:23 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/18/2024 4:51:21 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
10/18/2024 4:51:20 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
10/18/2024 4:51:18 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
10/18/2024 4:51:16 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
10/18/2024 4:51:14 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
10/18/2024 4:51:12 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
10/18/2024 4:51:08 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Kari Parsons on behalf of PCD Project Manager
10/18/2024 4:51:06 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
10/18/2024 4:51:02 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
10/18/2024 4:46:02 PM Submission Triaged
10/18/2024 3:08:20 PM Submission received from Applicant
10/1/2024 11:18:03 AM Submission request sent to Applicant
9/12/2024 3:46:29 PM Submission request sent to Applicant
9/12/2024 3:36:21 PM Request for Review Comments returned by EPC Stormwater Review
9/12/2024 3:33:51 PM Submission request sent to Applicant
9/12/2024 3:32:00 PM Request for Review Comments returned by PCD Engineering Division
9/12/2024 3:30:45 PM Request for Review Comments email resent for Project Eagleview Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
9/12/2024 10:28:21 AM Submission request sent to Applicant
9/11/2024 11:01:20 PM Request for Review Comments returned by PCD Engineering Division
9/11/2024 5:23:29 PM Request for Review Comments returned by PCD Project Manager
9/11/2024 11:25:37 AM Request for Review Comments returned by Colorado Geological Survey
9/10/2024 11:36:52 AM Request for Review Comments returned by County Attorney - Development Review
8/29/2024 12:00:09 PM Request for Review Comments returned by Pikes Peak Regional Building Department
8/29/2024 8:06:51 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
8/28/2024 4:18:14 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by on behalf of Pikes Peak Regional Building Department
8/28/2024 4:18:12 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
8/28/2024 4:18:10 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
8/28/2024 4:18:08 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
8/28/2024 4:18:06 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
8/28/2024 4:18:04 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
8/28/2024 4:18:03 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
8/28/2024 4:18:01 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
8/28/2024 4:17:59 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
8/28/2024 4:17:57 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
8/28/2024 4:17:53 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Kari Parsons on behalf of PCD Project Manager
8/28/2024 4:17:51 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
8/28/2024 4:17:47 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
8/28/2024 4:13:24 PM Submission Triaged
8/28/2024 1:52:54 PM Submission received from Applicant
8/27/2024 4:37:12 PM Submission request sent to Applicant
7/19/2024 3:36:51 PM Submission request sent to Applicant
7/19/2024 2:23:27 PM Request for Review Comments returned by County Attorney - Development Review
7/18/2024 11:18:16 PM Request for Review Comments returned by PCD Engineering Division
7/17/2024 5:02:28 PM Request for Review Comments returned by EPC Stormwater Review
7/17/2024 3:26:43 PM Request for Review Comments returned by PCD Project Manager
7/17/2024 12:49:03 PM Request for Review Comments returned by Colorado Geological Survey
7/9/2024 10:46:26 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/9/2024 7:31:14 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/3/2024 1:50:57 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by on behalf of Pikes Peak Regional Building Department
7/3/2024 1:50:55 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/3/2024 1:50:53 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
7/3/2024 1:50:51 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
7/3/2024 1:50:49 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Shannon Mustoe on behalf of EPC Stormwater Review
7/3/2024 1:50:47 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
7/3/2024 1:50:45 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
7/3/2024 1:50:43 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
7/3/2024 1:50:41 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
7/3/2024 1:50:39 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
7/3/2024 1:50:37 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Development Review
7/3/2024 1:50:33 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Kari Parsons on behalf of PCD Project Manager
7/3/2024 1:50:31 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
7/3/2024 1:50:27 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
7/3/2024 1:45:30 PM Submission Triaged
7/3/2024 12:52:26 PM Submission received from Applicant
6/21/2024 4:15:43 PM Submission request sent to Applicant
5/21/2024 8:09:59 AM Submission request sent to Applicant
5/17/2024 4:45:22 PM Request for Review Comments returned by PCD Engineering Division
5/16/2024 3:01:42 PM Request for Review Comments returned by County Attorney - Development Review
5/15/2024 3:49:18 PM Request for Review Comments returned by EPC Stormwater Review
5/15/2024 1:50:55 PM Request for Review Comments returned by County Attorney - Water
5/15/2024 7:55:56 AM Request for Review Comments returned by PCD Project Manager
5/13/2024 11:19:28 AM Request for Review Comments returned by EPC Parks Department
5/6/2024 1:18:58 PM Request for Review Comments returned by Pikes Peak Regional Building Department
4/25/2024 2:09:42 PM Request for Review Comments returned by EPC Environmental Services
4/25/2024 8:10:11 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/23/2024 11:09:22 AM Request for Review Comments email resent for Project Eagleview Final Plat (Minor) for review by on behalf of Pikes Peak Regional Building Department
4/23/2024 10:16:57 AM Request for Review Comments returned by Pikes Peak Regional Building Department
4/23/2024 8:20:49 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by on behalf of Pikes Peak Regional Building Department
4/23/2024 8:20:47 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
4/23/2024 8:20:45 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
4/23/2024 8:20:43 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Shannon Mustoe on behalf of EPC Stormwater Review
4/23/2024 8:20:41 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Mikayla Hartford on behalf of EPC Stormwater Review
4/23/2024 8:20:39 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Glenn Reese on behalf of EPC Stormwater Review
4/23/2024 8:20:37 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Christina Prete on behalf of EPC Stormwater Review
4/23/2024 8:20:35 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by on behalf of EPC Parks Department
4/23/2024 8:20:33 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Kathy Andrew on behalf of EPC Environmental Services
4/23/2024 8:20:31 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Water
4/23/2024 8:20:29 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by April Willie on behalf of County Attorney - Water
4/23/2024 8:20:27 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
4/23/2024 8:20:25 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by April Willie on behalf of County Attorney - Development Review
4/23/2024 8:20:21 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Kari Parsons on behalf of PCD Project Manager
4/23/2024 8:20:19 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division
4/23/2024 8:20:15 AM Request for Review Comments email sent for Project Eagleview Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
4/23/2024 8:15:41 AM Submission Triaged
4/19/2024 4:56:09 PM Submission received from Applicant
4/17/2024 1:59:57 PM Submission request sent to Applicant
2/14/2023 9:26:52 AM Request for Review Comments returned by Colorado Division of Water Resources
2/9/2023 1:56:44 PM Request for Review Comments returned by PCD Project Manager
2/9/2023 1:55:52 PM Request for Review Comments email resent for Project Eagleview Final Plat for review by Ryan Howser on behalf of PCD Project Manager
2/9/2023 1:40:20 PM Request for Review Comments returned by Parks Advisory Board
2/9/2023 10:22:29 AM Request for Review Comments returned by EPC Stormwater Review
2/8/2023 7:44:51 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
2/7/2023 3:51:45 PM Submission request sent to Applicant
2/7/2023 3:50:30 PM Request for Review Comments returned by PCD Project Manager
2/7/2023 2:00:28 PM Request for Review Comments returned by PCD Engineering Division
2/7/2023 11:23:04 AM Request for Review Comments email resent for Project Eagleview Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/6/2023 4:26:35 PM Request for Review Comments returned by PCD Engineering Division
2/5/2023 7:31:17 PM Request for Review Comments returned by EPC Health Department
2/2/2023 3:28:05 PM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Water
1/31/2023 2:56:02 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
1/24/2023 3:35:21 PM Request for Review Comments returned by EPC Parks Department
1/18/2023 11:38:41 AM Request for Review Comments returned by Colorado Geological Survey
1/12/2023 5:42:38 PM Request for Review Comments returned by County Attorney - Development Review
1/12/2023 5:09:15 PM Request for Review Comments returned by El Paso County Conservation Dist
1/12/2023 2:26:00 PM Request for Review Comments returned by County Attorney - Water
1/12/2023 10:50:05 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/12/2023 9:19:03 AM Request for Review Comments returned by EPC Environmental Services
1/11/2023 9:28:02 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/9/2023 1:49:57 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/5/2023 8:47:08 AM Request for Review Comments returned by Colorado State Forest Service
12/30/2022 2:14:00 PM Request for Review Comments returned by Falcon Fire Protection District
12/30/2022 10:23:59 AM Request for Review Comments returned by Colorado Parks and Wildlife
12/29/2022 9:03:40 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
12/29/2022 9:03:39 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Elizabeth Dukes on behalf of Falcon School District 49
12/29/2022 9:03:38 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
12/29/2022 9:03:37 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
12/29/2022 9:03:36 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
12/29/2022 9:03:35 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
12/29/2022 9:03:34 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
12/29/2022 9:03:33 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
12/29/2022 9:03:32 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
12/29/2022 9:03:31 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
12/29/2022 9:03:30 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
12/29/2022 9:03:29 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
12/29/2022 9:03:20 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
12/29/2022 9:03:18 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
12/29/2022 9:03:16 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by CDOT Permits Program Mgr Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
12/29/2022 9:03:11 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by on behalf of Parks Advisory Board
12/29/2022 9:03:10 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
12/29/2022 9:03:07 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
12/29/2022 9:03:05 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
12/29/2022 9:03:04 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
12/29/2022 9:03:03 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by on behalf of EPC Parks Department
12/29/2022 9:03:01 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
12/29/2022 9:02:58 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
12/29/2022 9:02:56 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by April Willie on behalf of County Attorney - Water
12/29/2022 9:02:54 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
12/29/2022 9:02:51 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Ryan Howser on behalf of PCD Project Manager
12/29/2022 9:02:50 AM Request for Review Comments email sent for Project Eagleview Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/29/2022 8:46:03 AM Fees paid: 12/29/2022 (Receipt: 1007305)
12/28/2022 3:57:03 PM Payment Request sent: 12/28/2022
12/28/2022 3:57:03 PM File # Assigned: SF2242
12/28/2022 3:56:59 PM Submission Triaged
12/23/2022 1:06:42 PM Submission received from Applicant
12/15/2022 3:49:00 PM Submission request sent to Applicant
11/23/2022 1:55:14 PM Submission request sent to Applicant
11/23/2022 12:06:10 PM Project Manager Assigned: Ryan Howser
11/23/2022 12:06:10 PM EA Assigned: EA2186
11/23/2022 12:06:10 PM Project Created