7/2/2025 10:48:37 AM
|
Fees paid: 7/2/2025 (Receipt: 1010725)
|
7/1/2025 1:51:46 PM
|
Payment Request sent: 7/1/2025
|
6/20/2025 2:54:47 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mike McCarthy on behalf of EPC Health Department
|
6/20/2025 2:54:46 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Catherine McGarvy on behalf of EPC Health Department
|
6/20/2025 2:54:45 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by HEAEH LandUse on behalf of EPC Health Department
|
5/27/2025 1:54:43 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/27/2025 1:24:55 PM
|
Request for Review Comments email resent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/23/2025 4:34:43 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/22/2025 3:29:44 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/22/2025 11:43:57 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/20/2025 11:13:01 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/16/2025 3:18:55 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
5/16/2025 3:18:54 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Water
|
5/16/2025 3:18:53 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
5/8/2025 1:42:05 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/8/2025 1:42:04 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
5/8/2025 1:42:03 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
5/8/2025 1:42:01 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Justin Kilgore on behalf of PCD Project Manager
|
5/8/2025 1:41:59 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/8/2025 1:41:58 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
5/8/2025 1:41:02 PM
|
Submission Triaged
|
5/8/2025 12:52:37 PM
|
Submission received from Applicant
|
5/5/2025 3:23:02 PM
|
Submission request sent to Applicant
|
5/5/2025 3:18:23 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/5/2025 9:26:51 AM
|
Submission request sent to Applicant
|
5/5/2025 9:26:35 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/2/2025 1:47:26 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/1/2025 11:53:23 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/21/2025 9:08:02 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
4/21/2025 9:08:01 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Water
|
4/21/2025 9:08:00 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
4/21/2025 9:07:59 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
4/21/2025 9:07:58 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
4/21/2025 9:07:57 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
4/21/2025 9:07:55 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Justin Kilgore on behalf of PCD Project Manager
|
4/21/2025 9:07:53 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/21/2025 9:07:52 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
4/21/2025 9:06:21 AM
|
Submission Triaged
|
4/19/2025 12:43:52 PM
|
Submission received from Applicant
|
3/25/2025 12:38:41 PM
|
Submission request sent to Applicant
|
3/14/2025 2:29:16 PM
|
Submission request sent to Applicant
|
3/14/2025 2:28:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/14/2025 12:53:34 PM
|
Request for Review Comments email resent for Project Silverado Ranch Filing No. 2 for review by Justin Kilgore on behalf of PCD Project Manager
|
3/14/2025 12:45:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/14/2025 10:29:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/11/2025 3:56:42 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/11/2025 9:58:45 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/4/2025 2:04:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/28/2025 1:48:22 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
2/28/2025 1:48:20 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
2/28/2025 1:48:19 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Water
|
2/28/2025 1:48:18 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
2/28/2025 1:48:17 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/28/2025 1:48:16 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
2/28/2025 1:48:15 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
2/28/2025 1:48:13 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Justin Kilgore on behalf of PCD Project Manager
|
2/28/2025 1:48:11 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/28/2025 1:48:10 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
2/28/2025 1:46:00 PM
|
Submission Triaged
|
2/28/2025 11:46:25 AM
|
Submission received from Applicant
|
2/7/2025 12:16:00 PM
|
Submission request sent to Applicant
|
2/6/2025 2:40:08 PM
|
Submission Triaged
|
2/6/2025 1:13:54 PM
|
Submission received from Applicant
|
11/12/2024 4:25:12 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/31/2024 8:42:10 AM
|
Submission request sent to Applicant
|
10/31/2024 8:41:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/31/2024 8:14:34 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
10/31/2024 8:14:32 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
10/31/2024 8:14:30 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
10/30/2024 4:38:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/30/2024 4:25:27 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/29/2024 8:05:07 AM
|
Submission Triaged
|
10/28/2024 10:36:13 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/25/2024 6:31:00 PM
|
Submission received from Applicant
|
10/25/2024 3:25:26 PM
|
Submission request sent to Applicant
|
10/25/2024 11:29:57 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/23/2024 9:36:03 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/16/2024 11:13:24 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
10/16/2024 11:13:22 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/16/2024 11:13:20 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
10/16/2024 11:13:19 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
10/16/2024 11:13:17 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
10/16/2024 11:13:15 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
10/16/2024 11:13:13 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Water
|
10/16/2024 11:13:11 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
10/16/2024 11:13:07 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
10/16/2024 11:13:04 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/16/2024 11:13:02 AM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
10/16/2024 11:02:01 AM
|
Submission Triaged
|
10/15/2024 12:04:38 PM
|
Submission received from Applicant
|
8/29/2024 9:39:54 AM
|
Submission request sent to Applicant
|
7/12/2024 3:33:03 PM
|
Submission request sent to Applicant
|
7/12/2024 3:32:12 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/12/2024 9:37:33 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/10/2024 9:44:07 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/9/2024 10:32:24 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/5/2024 11:00:43 AM
|
Request for Review Comments returned by County Attorney - Water
|
7/2/2024 10:27:46 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/2/2024 9:02:31 AM
|
Request for Review Comments email resent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
7/1/2024 12:27:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
6/28/2024 2:29:33 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
6/28/2024 2:29:31 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Michael Henley on behalf of Ellicott Fire Protection District
|
6/28/2024 2:29:29 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
6/28/2024 2:29:27 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/28/2024 2:29:25 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/28/2024 2:29:23 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/28/2024 2:29:21 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/28/2024 2:29:19 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
6/28/2024 2:29:17 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
6/28/2024 2:29:15 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Erika Keech on behalf of County Attorney - Water
|
6/28/2024 2:29:13 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
6/28/2024 2:29:09 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
6/28/2024 2:29:05 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/28/2024 2:29:03 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
6/28/2024 2:26:22 PM
|
Submission request canceled
|
6/28/2024 2:25:39 PM
|
Submission request sent to Applicant
|
6/28/2024 2:19:51 PM
|
Submission Triaged
|
6/27/2024 8:20:57 PM
|
Submission received from Applicant
|
6/12/2024 9:32:56 AM
|
Submission request sent to Applicant
|
4/24/2024 10:52:07 AM
|
Submission request sent to Applicant
|
4/12/2024 8:39:24 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/2/2024 2:45:09 PM
|
Submission request sent to Applicant
|
4/2/2024 2:44:28 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/2/2024 2:35:03 PM
|
Request for Review Comments email resent for Project Silverado Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
4/2/2024 9:39:09 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/2/2024 8:16:44 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/2/2024 7:55:16 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/1/2024 9:43:04 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/31/2024 9:57:04 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
3/28/2024 2:14:30 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/22/2024 11:04:46 AM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
3/21/2024 12:22:46 PM
|
Request for Review Comments returned by EPC Environmental Services
|
3/20/2024 1:12:07 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/19/2024 4:09:11 PM
|
Fees paid: 3/19/2024 (Receipt: 1008906)
|
3/19/2024 2:44:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/19/2024 2:12:55 PM
|
Payment Request sent: 3/19/2024
|
3/19/2024 11:58:10 AM
|
Request for Review Comments returned by PCD Administrative
|
3/15/2024 3:00:39 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/15/2024 1:16:21 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/15/2024 6:58:13 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/14/2024 10:17:38 AM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/14/2024 7:34:06 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/13/2024 1:46:35 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/13/2024 10:52:28 AM
|
Request for Review Comments email resent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
3/13/2024 10:15:54 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
3/13/2024 7:22:44 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/11/2024 4:02:11 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
3/11/2024 4:02:09 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Chris Smith on behalf of Ellicott SD 22
|
3/11/2024 4:02:07 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Peggy Current on behalf of Ellicott Metro
|
3/11/2024 4:02:05 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
3/11/2024 4:02:03 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Michael Henley on behalf of Ellicott Fire Protection District
|
3/11/2024 4:02:01 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
3/11/2024 4:01:59 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of Pikes Peak Regional Building Department
|
3/11/2024 4:01:57 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/11/2024 4:01:55 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/11/2024 4:01:53 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/11/2024 4:01:51 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/11/2024 4:01:49 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
3/11/2024 4:01:47 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
3/11/2024 4:01:45 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:43 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:42 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:40 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:38 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:36 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:34 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:32 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:31 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:29 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
3/11/2024 4:01:27 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/11/2024 4:01:25 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/11/2024 4:01:23 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/11/2024 4:01:21 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
3/11/2024 4:01:19 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
3/11/2024 4:01:17 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
3/11/2024 4:01:15 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
3/11/2024 4:01:13 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
3/11/2024 4:01:12 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Jennifer Irvine on behalf of Road Impact Fee Administrator
|
3/11/2024 4:01:10 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of Parks Advisory Board
|
3/11/2024 4:01:07 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/11/2024 4:01:06 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/11/2024 4:01:04 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
3/11/2024 4:01:02 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
3/11/2024 4:01:00 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
3/11/2024 4:00:58 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
3/11/2024 4:00:56 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of EPC Public Works, County Engineer
|
3/11/2024 4:00:54 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of EPC Public Works, County Engineer
|
3/11/2024 4:00:52 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by on behalf of EPC Parks Department
|
3/11/2024 4:00:50 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mike McCarthy on behalf of EPC Health Department
|
3/11/2024 4:00:49 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Catherine McGarvy on behalf of EPC Health Department
|
3/11/2024 4:00:47 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by HEAEH LandUse on behalf of EPC Health Department
|
3/11/2024 4:00:45 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/11/2024 4:00:43 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Mindy Schulz on behalf of EPC Code Enforcement
|
3/11/2024 4:00:41 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Water
|
3/11/2024 4:00:39 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
3/11/2024 4:00:37 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/11/2024 4:00:35 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
3/11/2024 4:00:31 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/11/2024 4:00:29 PM
|
Request for Review Comments email sent for Project Silverado Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
3/11/2024 3:57:59 PM
|
Request for Review Comments sent for Project Silverado Ranch Filing No. 2 for review by Admin on behalf of PCD Administrative
|
3/11/2024 1:09:31 PM
|
File # Assigned: SF246
|
3/7/2024 1:54:44 PM
|
Fees paid: 3/7/2024 (Receipt: 1008851)
|
3/7/2024 12:46:18 PM
|
Payment Request sent: 3/7/2024
|
3/7/2024 12:45:53 PM
|
Payment Request canceled: 3/7/2024
|
3/7/2024 7:17:32 AM
|
Payment Request sent: 3/7/2024
|
3/7/2024 7:17:32 AM
|
File # Assigned: SF245
|
3/7/2024 7:17:22 AM
|
Submission Triaged
|
3/6/2024 12:34:43 PM
|
Submission received from Applicant
|
2/29/2024 10:29:59 AM
|
Submission request sent to Applicant
|
2/29/2024 10:29:43 AM
|
Submission Triaged
|
2/29/2024 9:48:47 AM
|
Submission received from Applicant
|
2/13/2024 7:11:06 AM
|
Submission request sent to Applicant
|
2/13/2024 7:10:51 AM
|
Submission Triaged
|
2/13/2024 12:49:07 AM
|
Submission received from Applicant
|
1/5/2024 9:46:59 AM
|
Submission request sent to Applicant
|
1/3/2024 12:49:06 PM
|
Submission request sent to Applicant
|
6/28/2023 2:17:23 PM
|
Submission request sent to Applicant
|
2/27/2023 7:52:11 AM
|
Project Manager Assigned: Kylie Bagley
|
6/30/2022 12:08:39 PM
|
Submission request sent to Applicant
|
6/30/2022 12:01:55 PM
|
Project Manager Assigned: Kari Parsons
|
6/30/2022 12:01:55 PM
|
EA Assigned: EA21137
|
6/30/2022 12:01:55 PM
|
Project Created
|