Project Details

Search | All Active Projects


File Number
PPR2420
Project Name
Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan
Description
SDP for church. BOA approved and Subdivision still needed.
Parcels
3400000207 3400000207
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA21223
File Prefix
PPR - Plot Plan Review
Year
2024
Project Manager
Lisa Elgin
Status
Active
Created
1/6/2022 8:41:45 AM

View: Review Comments



Review Documents (25)

Link Document Date
View Application/Petition Form 6/9/2024 9:09:01 PM
View Grading & Erosion Control checklist 3/31/2026 9:27:55 AM
View Legal Description (MS WORD Version required) 6/9/2024 9:09:04 PM
View Letter of Intent 2/19/2025 2:51:43 PM
View Title Commitment (Current within 30 days of submittal) 6/9/2024 9:20:08 PM
View Vicinity/Location Map 6/9/2024 9:09:06 PM
View Easement(s) (MS Word version required attachments included) 2/19/2025 5:33:58 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 3/31/2026 9:27:50 AM
View Financial Assurance Forms 3/31/2026 9:27:47 AM
View Floor Plans (24" x 36") 2/19/2025 2:51:42 PM
View PBMP Applicability Form 3/31/2026 9:27:56 AM
View PDB/BMP Operations & Maintenance Manual 3/31/2026 9:27:54 AM
View SDI Form or MHFD Detention Calculations 3/31/2026 9:27:54 AM
View SWMP checklist 3/31/2026 9:27:55 AM
View Construction Drawings (Plans/Profiles) 2/19/2025 2:51:40 PM
View Grading & Erosion Control Plan 3/31/2026 9:27:48 AM
View Landscape Plan drawings 3/31/2026 9:27:49 AM
View Lighting Plan 3/31/2026 9:27:50 AM
View Sign Plan 2/19/2025 2:51:45 PM
View Site Development Plan 3/31/2026 9:27:53 AM
View Storm Water Management Plan (SWMP) 3/31/2026 9:27:51 AM
View Drainage Report - Final 3/31/2026 9:27:48 AM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 3/31/2026 9:27:46 AM
View Elevation Plans 2/19/2025 2:51:40 PM
View Traffic Memo 3/31/2026 9:27:51 AM



Events (107)

Date Comment
4/3/2026 12:22:17 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/31/2026 3:55:27 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
3/31/2026 3:55:26 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Chris Smith on behalf of Ellicott SD 22
3/31/2026 3:55:25 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Peggy Current on behalf of Ellicott Metro
3/31/2026 3:55:24 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Dave Sanger on behalf of Ellicott Elementary/Senior High School
3/31/2026 3:55:23 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mike Harrower on behalf of Elbert Fire Protection District
3/31/2026 3:55:21 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Trish Riber on behalf of Black Hills Energy-Aquila
3/31/2026 3:55:21 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
3/31/2026 3:55:20 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
3/31/2026 3:55:19 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
3/31/2026 3:55:18 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
3/31/2026 3:55:17 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
3/31/2026 3:55:16 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
3/31/2026 3:55:15 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
3/31/2026 3:55:14 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
3/31/2026 3:55:13 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
3/31/2026 3:55:12 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
3/31/2026 3:55:11 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
3/31/2026 3:55:10 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
3/31/2026 3:55:09 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
3/31/2026 3:55:08 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/31/2026 3:55:07 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
3/31/2026 3:55:06 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
3/31/2026 3:55:04 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
3/31/2026 3:55:03 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
3/31/2026 3:55:02 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
3/31/2026 3:35:16 PM Submission Triaged
3/31/2026 9:28:03 AM Submission received from Applicant
5/22/2025 3:58:56 PM Project Manager Assigned: Lisa Elgin
3/14/2025 4:50:59 PM Request for Review Comments returned by EPC Health Department
3/12/2025 8:45:31 AM Submission request sent to Applicant
3/12/2025 8:44:42 AM Request for Review Comments returned by PCD Project Manager
3/11/2025 5:23:10 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/10/2025 2:26:15 PM Request for Review Comments returned by EPC Stormwater Review
3/10/2025 12:00:40 PM Request for Review Comments returned by PCD Engineering Division
3/4/2025 11:27:59 AM Request for Review Comments returned by County Attorney - Development Review
2/21/2025 1:34:41 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Chris Smith on behalf of Ellicott SD 22
2/21/2025 1:34:40 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Peggy Current on behalf of Ellicott Metro
2/21/2025 1:34:39 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Dave Sanger on behalf of Ellicott Elementary/Senior High School
2/21/2025 1:34:38 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mike Harrower on behalf of Elbert Fire Protection District
2/21/2025 1:34:36 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
2/21/2025 1:34:35 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
2/21/2025 1:34:34 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
2/21/2025 1:34:33 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
2/21/2025 1:34:32 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
2/21/2025 1:34:31 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
2/21/2025 1:34:30 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
2/21/2025 1:34:29 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
2/21/2025 1:34:28 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/21/2025 1:34:27 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
2/21/2025 1:34:26 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
2/21/2025 1:34:25 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
2/21/2025 1:34:24 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
2/21/2025 1:34:23 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
2/21/2025 1:34:21 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
2/21/2025 1:34:20 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
2/21/2025 1:34:19 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
2/21/2025 1:34:18 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
2/21/2025 1:34:16 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
2/21/2025 1:34:14 PM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
2/21/2025 1:25:29 PM Submission Triaged
2/21/2025 1:04:50 PM Submission received from Applicant
2/18/2025 10:14:51 AM Submission request sent to Applicant
6/26/2024 8:58:29 AM Submission request sent to Applicant
6/26/2024 8:57:04 AM Request for Review Comments returned by PCD Project Manager
6/25/2024 7:51:27 AM Request for Review Comments returned by EPC Stormwater Review
6/24/2024 9:38:07 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/19/2024 2:47:49 PM Request for Review Comments returned by Pikes Peak Regional Building Department
6/18/2024 2:04:01 PM Request for Review Comments returned by PCD Engineering Division
6/14/2024 8:32:27 AM Request for Review Comments returned by El Paso County Conservation Dist
6/12/2024 8:21:47 AM Fees paid: 6/12/2024 (Receipt: 1009223)
6/11/2024 11:22:47 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
6/11/2024 11:22:45 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Chris Smith on behalf of Ellicott SD 22
6/11/2024 11:22:43 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Peggy Current on behalf of Ellicott Metro
6/11/2024 11:22:41 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Dave Sanger on behalf of Ellicott Elementary/Senior High School
6/11/2024 11:22:39 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mike Harrower on behalf of Elbert Fire Protection District
6/11/2024 11:22:36 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
6/11/2024 11:22:35 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
6/11/2024 11:22:32 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
6/11/2024 11:22:30 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
6/11/2024 11:22:28 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
6/11/2024 11:22:26 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
6/11/2024 11:22:24 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
6/11/2024 11:22:22 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by on behalf of Pikes Peak Regional Building Department
6/11/2024 11:22:20 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review
6/11/2024 11:22:18 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
6/11/2024 11:22:16 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
6/11/2024 11:22:14 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
6/11/2024 11:22:12 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
6/11/2024 11:22:10 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
6/11/2024 11:22:08 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
6/11/2024 11:22:05 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
6/11/2024 11:22:01 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
6/11/2024 11:21:59 AM Request for Review Comments email sent for Project Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
6/10/2024 8:19:06 AM Payment Request sent: 6/10/2024
6/10/2024 8:19:00 AM File # Assigned: PPR2420
6/10/2024 8:02:31 AM Submission Triaged
6/10/2024 2:47:01 AM Submission received from Applicant
3/19/2024 8:58:15 AM Submission request sent to Applicant
3/19/2024 8:57:17 AM Project reopened for Review Comments
3/19/2024 8:56:42 AM Project Manager Assigned: Ashlyn Mathy
1/13/2023 12:00:00 AM Project Closed
1/13/2023 12:00:00 AM Project Expired one year after 01/13/2022 Submission Request 01/13/2023
1/13/2022 2:27:46 PM Submission request sent to Applicant
1/6/2022 8:41:57 AM Project Manager Assigned: Mercedes Rivas
1/6/2022 8:41:57 AM EA Assigned: EA21223
1/6/2022 8:41:57 AM Project Created