8/12/2025 12:38:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/12/2025 11:15:40 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Steve Murphy on behalf of GMF Chipita Park Fire Protection District
|
8/12/2025 11:15:36 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
8/12/2025 11:15:35 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
8/12/2025 11:15:34 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
8/12/2025 11:15:01 AM
|
Submission Triaged
|
8/12/2025 11:00:00 AM
|
Submission received from Applicant
|
8/12/2025 8:39:40 AM
|
Submission request sent to Applicant
|
8/12/2025 8:26:15 AM
|
Submission Triaged
|
8/12/2025 7:58:53 AM
|
Submission received from Applicant
|
8/11/2025 4:30:00 PM
|
Submission request sent to Applicant
|
8/11/2025 3:44:29 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/8/2025 11:46:10 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/7/2025 8:44:11 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
8/7/2025 8:44:10 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
8/7/2025 8:44:09 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
8/7/2025 8:44:08 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
8/7/2025 8:44:07 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/7/2025 8:44:06 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/7/2025 8:44:05 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
8/7/2025 8:44:04 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
8/7/2025 8:44:03 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
8/7/2025 8:44:02 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
8/7/2025 8:43:59 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
8/7/2025 8:43:58 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/7/2025 8:43:57 AM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
8/7/2025 8:34:18 AM
|
Submission Triaged
|
8/6/2025 4:44:05 PM
|
Submission received from Applicant
|
7/30/2025 4:03:04 PM
|
Submission request sent to Applicant
|
7/30/2025 3:58:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/29/2025 1:47:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/26/2025 8:54:21 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/22/2025 2:34:20 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
7/22/2025 2:34:19 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
7/22/2025 2:34:18 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
7/22/2025 2:34:17 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
7/22/2025 2:34:16 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
7/22/2025 2:34:15 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
7/22/2025 2:34:13 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
7/22/2025 2:34:12 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/22/2025 2:34:11 PM
|
Request for Review Comments email sent for Project Rocky Top Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
7/22/2025 2:31:26 PM
|
Submission Triaged
|
7/22/2025 9:45:13 AM
|
Submission received from Applicant
|
7/1/2025 1:47:41 PM
|
Submission request sent to Applicant
|
7/1/2025 1:35:30 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/1/2025 8:54:58 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/30/2025 2:14:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/24/2025 3:41:41 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/16/2025 4:52:32 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/16/2025 12:15:25 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Steve Murphy on behalf of GMF Chipita Park Fire Protection District
|
6/16/2025 12:15:24 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
6/16/2025 12:15:23 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
6/16/2025 12:15:22 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
6/16/2025 12:15:21 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
6/16/2025 12:15:19 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
6/16/2025 12:15:19 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
6/16/2025 12:15:18 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
6/16/2025 12:15:16 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
6/16/2025 12:15:15 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/16/2025 12:15:14 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/16/2025 12:15:13 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
6/16/2025 12:15:12 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
|
6/16/2025 12:15:11 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
6/16/2025 12:15:10 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
6/16/2025 12:15:09 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
6/16/2025 12:15:08 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
6/16/2025 12:15:07 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
6/16/2025 12:15:04 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
6/16/2025 12:15:03 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/16/2025 12:15:02 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
6/13/2025 11:40:40 AM
|
Submission Triaged
|
6/13/2025 10:33:46 AM
|
Submission received from Applicant
|
6/12/2025 11:27:54 AM
|
Submission request sent to Applicant
|
6/12/2025 11:27:21 AM
|
Submission Triaged
|
6/11/2025 2:49:25 PM
|
Submission received from Applicant
|
5/22/2025 3:59:48 PM
|
Project Manager Assigned: Miranda Benson
|
5/21/2025 11:35:26 AM
|
Submission request sent to Applicant
|
5/12/2025 3:33:29 PM
|
Submission request sent to Applicant
|
5/12/2025 3:31:49 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/12/2025 3:22:36 PM
|
Request for Review Comments email resent for Project Rockytop Campground Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
4/28/2025 3:59:20 PM
|
Submission request sent to Applicant
|
4/18/2025 2:52:46 PM
|
Submission request sent to Applicant
|
4/18/2025 11:27:40 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/18/2025 11:21:41 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/18/2025 9:45:51 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/17/2025 3:59:28 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/4/2025 2:07:15 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
4/4/2025 2:07:14 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/4/2025 2:07:13 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/4/2025 2:07:12 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
4/4/2025 2:07:11 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
4/4/2025 2:07:10 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
4/4/2025 2:07:09 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
4/4/2025 2:07:08 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
4/4/2025 2:07:05 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/4/2025 2:07:04 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
4/4/2025 2:05:32 PM
|
Submission Triaged
|
4/4/2025 1:02:54 PM
|
Submission received from Applicant
|
2/12/2025 12:12:03 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
2/7/2025 12:59:01 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/6/2025 11:32:07 AM
|
Submission request sent to Applicant
|
2/6/2025 11:30:59 AM
|
Submission request sent to Applicant
|
2/6/2025 11:01:09 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/4/2025 3:09:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/3/2025 5:04:58 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/21/2025 11:27:28 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 11:27:27 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 11:27:25 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 11:27:24 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/21/2025 11:27:23 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/21/2025 11:27:22 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
1/21/2025 11:27:20 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
1/21/2025 11:27:19 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
1/21/2025 11:27:18 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
1/21/2025 11:27:17 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
1/21/2025 11:27:15 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/21/2025 11:27:14 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
1/21/2025 11:25:28 AM
|
Submission Triaged
|
1/21/2025 11:19:28 AM
|
Submission received from Applicant
|
1/21/2025 11:03:36 AM
|
Submission request sent to Applicant
|
1/16/2025 1:46:44 PM
|
Submission request sent to Applicant
|
4/17/2024 3:24:35 PM
|
Project Manager Assigned: Ashlyn Mathy
|
1/23/2024 1:31:53 PM
|
Submission request sent to Applicant
|
5/24/2023 2:10:12 PM
|
Submission request sent to Applicant
|
5/24/2023 2:09:01 PM
|
Submission request canceled
|
5/1/2023 10:36:44 AM
|
Submission request sent to Applicant
|
3/14/2023 9:20:40 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/8/2023 3:50:16 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/8/2023 2:01:40 PM
|
Submission request sent to Applicant
|
3/8/2023 12:37:06 PM
|
Request for Review Comments email resent for Project Rockytop Campground Site Development Plan for review by Christian Haas on behalf of PCD Project Manager
|
3/8/2023 12:34:48 PM
|
Submission Triaged
|
3/3/2023 12:31:12 PM
|
Submission received from Applicant
|
3/3/2023 12:09:37 PM
|
Submission request sent to Applicant
|
2/27/2023 8:06:11 AM
|
Submission Triaged
|
2/20/2023 8:46:48 AM
|
Submission received from Applicant
|
2/17/2023 3:53:06 PM
|
Submission request sent to Applicant
|
2/17/2023 3:37:14 PM
|
Submission request sent to Applicant
|
2/10/2023 2:52:36 PM
|
Project Manager Assigned: Christian Haas
|
2/10/2023 2:52:15 PM
|
Project Manager Assigned: Lekishia Bellamy
|
1/19/2023 3:24:38 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
1/18/2023 8:12:29 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/18/2023 5:33:54 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/18/2023 3:21:37 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/12/2023 5:21:50 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/30/2022 5:36:28 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/30/2022 5:36:25 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
12/30/2022 5:36:24 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by HR Green EPC Consultant on behalf of PCD Project Manager
|
12/30/2022 5:36:22 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/30/2022 5:35:21 PM
|
Submission Triaged
|
12/28/2022 7:45:18 AM
|
Submission received from Applicant
|
12/12/2022 11:29:30 AM
|
Submission request sent to Applicant
|
12/12/2022 11:23:20 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/10/2022 1:45:37 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/8/2022 4:34:41 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/8/2022 4:32:41 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/8/2022 12:45:48 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/8/2022 9:39:20 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/23/2022 8:19:35 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/23/2022 8:12:20 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/22/2022 5:24:01 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
11/22/2022 5:24:00 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/22/2022 5:23:59 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/22/2022 5:23:57 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
11/22/2022 5:23:56 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/22/2022 5:23:53 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
11/22/2022 5:23:52 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by HR Green EPC Consultant on behalf of PCD Project Manager
|
11/22/2022 5:23:50 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/22/2022 4:44:06 PM
|
Submission Triaged
|
11/22/2022 8:53:05 AM
|
Submission received from Applicant
|
11/9/2022 7:48:23 AM
|
Submission request sent to Applicant
|
8/2/2022 8:28:43 PM
|
Submission request sent to Applicant
|
7/26/2022 4:53:58 PM
|
Submission request sent to Applicant
|
6/22/2022 4:51:17 PM
|
Submission request sent to Applicant
|
6/22/2022 4:43:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/22/2022 9:52:03 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/21/2022 11:24:33 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/1/2022 7:39:20 AM
|
Project Manager Assigned: HR Green EPC Consultant
|
5/31/2022 9:14:16 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/31/2022 9:14:14 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Ryan Howser on behalf of PCD Project Manager
|
5/31/2022 9:14:12 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/31/2022 9:13:22 AM
|
Submission Triaged
|
5/27/2022 3:54:51 PM
|
Submission received from Applicant
|
4/12/2022 12:03:03 PM
|
Project Manager Assigned: Ryan Howser
|
2/23/2022 5:30:16 PM
|
Submission request sent to Applicant
|
2/23/2022 5:28:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/23/2022 5:24:49 PM
|
Request for Review Comments email resent for Project Rockytop Campground Site Development Plan for review by John Green on behalf of PCD Project Manager
|
2/18/2022 9:55:37 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/17/2022 7:12:09 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/16/2022 10:22:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/8/2022 12:03:18 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/1/2022 7:19:10 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
2/1/2022 7:19:06 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/1/2022 7:19:02 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
2/1/2022 7:19:00 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by John Green on behalf of PCD Project Manager
|
2/1/2022 7:18:56 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/1/2022 7:17:00 AM
|
Submission Triaged
|
1/27/2022 6:58:31 PM
|
Submission received from Applicant
|
10/1/2021 10:32:30 AM
|
Submission request sent to Applicant
|
10/1/2021 10:31:17 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/1/2021 10:25:24 AM
|
Request for Review Comments email resent for Project Rockytop Campground Site Development Plan for review by John Green on behalf of PCD Project Manager
|
9/30/2021 7:33:26 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/30/2021 7:24:49 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/29/2021 5:10:15 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/28/2021 4:36:55 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
9/20/2021 11:39:45 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/15/2021 2:32:25 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/10/2021 4:39:27 PM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/7/2021 9:46:18 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by John Green on behalf of PCD Project Manager
|
9/7/2021 9:46:14 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/7/2021 8:55:36 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/3/2021 10:50:06 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
9/1/2021 11:25:48 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/1/2021 9:23:42 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
9/1/2021 9:23:40 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Assistant Superintendent on behalf of Manitou Springs SD 14
|
9/1/2021 9:23:37 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Steve Murphy on behalf of GMF Chipita Park Fire Protection District
|
9/1/2021 9:23:35 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
9/1/2021 9:23:33 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/1/2021 9:23:30 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/1/2021 9:23:28 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
9/1/2021 9:23:26 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
9/1/2021 9:23:24 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/1/2021 9:23:20 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
9/1/2021 9:23:18 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
9/1/2021 9:23:10 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
9/1/2021 9:23:07 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by John Green on behalf of PCD Project Manager
|
9/1/2021 9:23:05 AM
|
Request for Review Comments email sent for Project Rockytop Campground Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/19/2021 4:42:55 PM
|
Fees paid: 8/19/2021 (Receipt: 1004969)
|
8/19/2021 4:13:24 PM
|
Project Manager Assigned: John Green
|
8/19/2021 4:13:14 PM
|
Payment Request sent: 8/19/2021
|
8/19/2021 4:13:14 PM
|
File # Assigned: PPR2140
|
8/19/2021 4:13:07 PM
|
Submission Triaged
|
8/19/2021 12:56:25 PM
|
Submission received from Applicant
|
8/18/2021 8:28:49 PM
|
Submission request sent to Applicant
|
8/18/2021 8:28:21 PM
|
Submission Triaged
|
8/18/2021 7:44:07 PM
|
Submission received from Applicant
|
3/3/2021 4:20:33 PM
|
Submission request sent to Applicant
|
3/3/2021 9:08:22 AM
|
Project Manager Assigned: Nina Ruiz
|
3/2/2021 6:50:46 PM
|
Submission request sent to Applicant
|
3/2/2021 6:49:15 PM
|
Project Manager Assigned: Tara Younger
|
3/2/2021 6:49:15 PM
|
EA Assigned: EA18250
|
3/2/2021 6:49:15 PM
|
Project Created
|