8/12/2025 6:06:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/12/2025 11:21:04 AM
|
Fees paid: 8/12/2025 (Receipt: 1010908)
|
8/12/2025 9:55:46 AM
|
Submission request canceled
|
8/12/2025 9:55:08 AM
|
Submission request sent to Applicant
|
8/5/2025 9:33:16 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/5/2025 9:33:14 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
8/5/2025 9:32:43 AM
|
Payment Request sent: 8/5/2025
|
8/5/2025 9:32:25 AM
|
Submission Triaged
|
7/29/2025 1:19:38 PM
|
Submission received from Applicant
|
7/23/2025 5:07:07 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/22/2025 3:09:11 PM
|
Submission request sent to Applicant
|
7/22/2025 2:46:18 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/9/2025 7:30:54 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
7/9/2025 7:30:53 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/9/2025 7:30:52 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/9/2025 7:30:51 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Christina Prete on behalf of EPC Stormwater Review
|
7/9/2025 7:30:50 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/9/2025 7:30:48 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
7/9/2025 7:29:48 AM
|
Submission Triaged
|
7/3/2025 4:50:57 PM
|
Submission received from Applicant
|
7/2/2025 1:58:24 PM
|
Submission request sent to Applicant
|
7/2/2025 1:56:51 PM
|
Project reopened for Review Comments
|
3/12/2025 2:43:09 PM
|
Project Closed
|
3/12/2025 2:43:09 PM
|
Project Approved: 3/12/2025
|
3/11/2025 11:42:26 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
3/11/2025 9:53:57 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/6/2025 4:14:03 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
3/6/2025 4:14:02 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Erika Keech on behalf of County Attorney - Development Review
|
3/6/2025 4:14:01 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by April Willie on behalf of County Attorney - Development Review
|
3/6/2025 4:13:23 PM
|
Submission Triaged
|
3/6/2025 4:04:22 PM
|
Submission received from Applicant
|
5/14/2024 12:10:26 PM
|
Submission request sent to Applicant
|
5/14/2024 11:48:17 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/7/2024 8:47:18 AM
|
Request for Review Comments email resent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
5/6/2024 7:32:34 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/2/2024 5:30:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/2/2024 3:32:36 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/26/2024 2:14:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/19/2024 4:38:11 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
4/19/2024 4:38:09 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/19/2024 4:38:07 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/19/2024 4:38:05 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Christina Prete on behalf of EPC Stormwater Review
|
4/19/2024 4:38:03 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
4/19/2024 4:38:02 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by April Willie on behalf of County Attorney - Development Review
|
4/19/2024 4:37:58 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Kari Parsons on behalf of PCD Project Manager
|
4/19/2024 4:37:56 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/19/2024 4:37:52 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
4/19/2024 4:34:43 PM
|
Submission Triaged
|
4/19/2024 4:30:35 PM
|
Submission received from Applicant
|
4/11/2024 2:37:08 PM
|
Submission request sent to Applicant
|
3/26/2024 10:45:04 AM
|
Submission request sent to Applicant
|
3/6/2024 3:31:20 PM
|
Request for Review Comments returned by Parks Advisory Board
|
3/1/2024 3:47:55 PM
|
Submission request sent to Applicant
|
3/1/2024 3:47:19 PM
|
Request for Review Comments sent for Project Forest Heights Estates for review by on behalf of Parks Advisory Board
|
2/20/2024 9:57:22 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/6/2024 2:23:24 PM
|
Submission request sent to Applicant
|
2/6/2024 2:02:34 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/6/2024 12:50:33 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/31/2024 2:10:46 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/31/2024 2:10:44 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/31/2024 2:10:42 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Christina Prete on behalf of EPC Stormwater Review
|
1/31/2024 2:10:40 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
1/31/2024 2:10:38 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by April Willie on behalf of County Attorney - Development Review
|
1/31/2024 2:10:36 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/31/2024 2:10:32 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
1/31/2024 2:06:50 PM
|
Submission Triaged
|
1/30/2024 6:01:25 PM
|
Submission received from Applicant
|
1/23/2024 8:38:56 AM
|
Submission request sent to Applicant
|
11/30/2023 1:59:12 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/15/2023 8:40:36 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Water
|
11/15/2023 8:40:34 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by April Willie on behalf of County Attorney - Water
|
11/9/2023 12:57:41 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/1/2023 4:40:13 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/31/2023 4:55:40 PM
|
Submission request sent to Applicant
|
10/31/2023 2:42:04 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/30/2023 7:58:08 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/27/2023 9:22:52 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/25/2023 9:03:03 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/17/2023 9:14:57 AM
|
Submission Triaged
|
10/17/2023 8:25:25 AM
|
Submission received from Applicant
|
10/17/2023 8:19:42 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/17/2023 8:19:32 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Edi Anderson on behalf of County Attorney - Water
|
10/17/2023 8:19:26 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
10/17/2023 8:19:24 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Ryan Howser on behalf of PCD Project Manager
|
10/17/2023 8:19:19 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 8:19:18 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 8:17:31 AM
|
Submission request sent to Applicant
|
10/17/2023 8:16:57 AM
|
Submission Triaged
|
10/13/2023 6:47:12 PM
|
Submission received from Applicant
|
8/24/2023 2:59:40 PM
|
Submission request sent to Applicant
|
8/24/2023 2:28:23 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/24/2023 1:56:06 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/23/2023 4:40:19 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/22/2023 7:12:29 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/18/2023 10:25:59 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/17/2023 4:35:31 PM
|
Request for Review Comments returned by County Attorney - Water
|
8/2/2023 4:20:59 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
8/2/2023 4:20:58 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
8/2/2023 4:20:56 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/2/2023 4:20:51 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Edi Anderson on behalf of County Attorney - Water
|
8/2/2023 4:20:48 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
8/2/2023 4:20:47 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Ryan Howser on behalf of PCD Project Manager
|
8/2/2023 4:20:45 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/2/2023 4:14:39 PM
|
Submission Triaged
|
8/2/2023 9:54:46 AM
|
Submission received from Applicant
|
3/23/2023 11:14:28 AM
|
Submission request sent to Applicant
|
10/18/2022 9:52:14 AM
|
Submission request sent to Applicant
|
10/18/2022 9:52:04 AM
|
Set Applicant to M.V.E., Inc.
|
8/15/2022 9:00:14 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/27/2022 8:25:16 AM
|
Request for Review Comments returned by Parks Advisory Board
|
6/24/2022 2:19:54 PM
|
Request for Review Comments email resent for Project Forest Heights Estates for review by on behalf of Parks Advisory Board
|
6/17/2022 1:26:11 PM
|
Submission request sent to Applicant
|
6/17/2022 1:22:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/17/2022 12:53:44 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/15/2022 1:08:17 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/15/2022 1:01:44 PM
|
Request for Review Comments email resent for Project Forest Heights Estates for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/15/2022 12:09:45 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/15/2022 11:02:30 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Edi Anderson on behalf of County Attorney - Water
|
6/14/2022 10:55:46 PM
|
Request for Review Comments returned by Black Forest Trails Association
|
6/14/2022 1:26:11 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/13/2022 4:27:27 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/7/2022 8:15:25 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/6/2022 9:28:19 AM
|
Request for Review Comments returned by Parks Advisory Board
|
6/6/2022 9:26:56 AM
|
Request for Review Comments returned by EPC Parks Department
|
6/3/2022 1:04:43 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by on behalf of Parks Advisory Board
|
6/3/2022 1:04:42 PM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by on behalf of EPC Parks Department
|
5/31/2022 11:55:19 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
5/31/2022 8:43:35 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
5/20/2022 10:06:52 AM
|
Request for Review Comments returned by County Attorney - Water
|
5/19/2022 10:37:43 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
5/19/2022 10:37:42 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
5/19/2022 10:37:38 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
5/19/2022 10:37:36 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/19/2022 10:37:35 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Edi Anderson on behalf of County Attorney - Water
|
5/19/2022 10:37:34 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Lori Seago on behalf of County Attorney - Development Review
|
5/19/2022 10:37:32 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Ryan Howser on behalf of PCD Project Manager
|
5/19/2022 10:37:25 AM
|
Request for Review Comments email sent for Project Forest Heights Estates for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/19/2022 10:34:43 AM
|
Submission Triaged
|
5/19/2022 8:39:17 AM
|
Submission received from Applicant
|
5/18/2022 4:54:56 PM
|
Submission request sent to Applicant
|
5/18/2022 4:54:10 PM
|
Submission request sent to Applicant
|
5/18/2022 4:52:54 PM
|
Submission Triaged
|
5/18/2022 2:16:01 PM
|
Submission received from Applicant
|
3/11/2022 3:13:09 PM
|
Submission request sent to Applicant
|
3/11/2022 3:09:52 PM
|
Submission Triaged
|
3/11/2022 1:50:04 PM
|
Submission received from Applicant
|
3/10/2022 4:48:49 PM
|
Submission request sent to Applicant
|
3/10/2022 4:28:07 PM
|
Submission Triaged
|
3/10/2022 3:35:52 PM
|
Submission received from Applicant
|
1/7/2022 4:54:56 PM
|
Submission request sent to Applicant
|
1/7/2022 4:52:16 PM
|
Submission Triaged
|
1/7/2022 10:13:22 AM
|
Submission received from Applicant
|
10/27/2021 1:42:37 PM
|
Submission request sent to Applicant
|
2/16/2021 6:51:20 PM
|
Request for Review Comments returned by EPC Health Department
|
2/12/2021 11:47:32 AM
|
Submission request sent to Applicant
|
1/30/2021 1:45:23 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
1/15/2021 9:00:12 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/12/2021 11:38:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/12/2021 10:17:28 AM
|
Request for Review Comments email resent for Project Forest Heights Properties for review by Ryan Howser on behalf of PCD Project Manager
|
1/11/2021 9:55:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/7/2021 4:51:53 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/5/2021 4:16:10 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/4/2021 4:19:36 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/31/2020 4:34:19 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/29/2020 3:49:02 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/29/2020 10:22:41 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/23/2020 12:49:09 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/20/2020 12:04:04 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/18/2020 6:47:51 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/15/2020 2:32:58 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/14/2020 12:31:16 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/10/2020 11:16:06 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/9/2020 7:45:58 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
12/8/2020 11:01:49 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
12/8/2020 10:11:23 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/7/2020 11:49:10 AM
|
Request for Review Comments returned by EPC Environmental Services
|
12/4/2020 3:47:14 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/4/2020 3:47:12 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
12/4/2020 3:47:10 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
12/4/2020 3:47:08 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
12/4/2020 3:47:06 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
12/4/2020 3:47:03 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
12/4/2020 3:47:01 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/4/2020 3:46:59 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/4/2020 3:46:57 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
12/4/2020 3:46:55 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/4/2020 3:46:53 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
12/4/2020 3:46:51 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
12/4/2020 3:46:49 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/4/2020 3:46:47 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/4/2020 3:46:44 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/4/2020 3:46:42 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by on behalf of Parks Advisory Board
|
12/4/2020 3:46:40 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/4/2020 3:46:37 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/4/2020 3:46:35 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
12/4/2020 3:46:32 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by on behalf of EPC Parks Department
|
12/4/2020 3:46:30 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Catherine McGarvy on behalf of EPC Health Department
|
12/4/2020 3:46:22 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/4/2020 3:46:19 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Edi Anderson on behalf of County Attorney - Water
|
12/4/2020 3:46:16 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Lori Seago on behalf of County Attorney - Development Review
|
12/4/2020 3:46:14 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Ryan Howser on behalf of PCD Project Manager
|
12/4/2020 3:46:12 PM
|
Request for Review Comments email sent for Project Forest Heights Properties for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/3/2020 1:32:19 PM
|
Fees paid: 12/3/2020 (Receipt: 1003634)
|
11/16/2020 5:39:31 AM
|
Project Manager Assigned: Ryan Howser
|
11/16/2020 5:38:32 AM
|
Payment Request sent: 11/16/2020
|
11/16/2020 5:38:31 AM
|
File # Assigned: MS206
|
11/16/2020 5:38:20 AM
|
Submission Triaged
|
11/11/2020 2:37:32 PM
|
Submission received from Applicant
|
9/18/2020 7:07:55 AM
|
Submission request sent to Applicant
|
9/18/2020 7:07:17 AM
|
Submission Triaged
|
9/17/2020 12:25:22 PM
|
Submission received from Applicant
|
9/5/2020 1:32:43 PM
|
Submission request sent to Applicant
|
7/9/2020 11:45:21 AM
|
Submission request sent to Applicant
|
7/9/2020 11:43:30 AM
|
Submission Triaged
|
7/8/2020 2:28:42 PM
|
Submission received from Applicant
|
6/3/2020 3:25:07 PM
|
Submission request sent to Applicant
|
4/20/2020 3:23:30 PM
|
Submission request sent to Applicant
|
4/20/2020 3:22:03 PM
|
Submission request sent to Applicant
|
4/20/2020 3:15:04 PM
|
Project Manager Assigned: Gabe Sevigny
|
4/20/2020 3:15:04 PM
|
EA Assigned: EA17184
|
4/20/2020 3:15:04 PM
|
Project Created
|