Project Details

Search | All Active Projects


File Number
SKP201
Project Name
GrandView Reserve Sketch Plan
Description
768 acre mixed use sketchplan includes Rex Road from Eastonvoille to HWY 24
Parcels
4200000396 4200000396
Applicant
HR Green
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
EA Number
EA2020
File Prefix
SKP - Sketch Plan
Year
2020
Project Manager
Kari Parsons
Status
Active
Created
2/12/2020 3:32:31 PM

View: Review Comments


Approved Documents (2)

Link Document
View Traffic Impact Study
View Master Development Drainage Plan (MDDP)


Additional Documents (13)

Link Document Comment
View Postings Pictures
View PC Staff Report September 17,2020
View BoCC Staff Report September 22,2020
View Opposition - Thursday, September 17, 2020 11:36 AM
View Opposition - Thursday, September 17, 2020 11:36 AM
View Opposition - Thursday, September 17, 2020 11:36 AM
View Opposition - Thursday, September 17, 2020 11:36 AM
View 1 of 2 Adjacent Property Letter Susan and Scott
View 2 of 2 Adjacent Property Letter Susan and Scott
View PC Approval Letter
View BoCC Approval Letter
View BOCC Resolution 20-342
View Approved Sketch Plan


Review Documents (30)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 4/22/2020 5:57:45 AM
View Application/Petition Form 4/22/2020 5:57:46 AM
View Legal Description (MS WORD Version required) 4/22/2020 5:57:48 AM
View Letter of Intent 9/22/2020 3:47:54 PM
View Title Commitment (Current within 30 days of submittal) 4/23/2020 1:30:48 PM
View Vicinity/Location Map 4/22/2020 6:05:07 AM
View Clearance Letter - USF&W 4/22/2020 5:57:54 AM
View Colorado Geological Survey Receipt 4/22/2020 5:57:47 AM
View Mineral Rights Certification 4/22/2020 5:57:50 AM
View Sketch Plan Drawing(s) 8/26/2020 12:13:48 PM
View Fire Commitment Letter 4/22/2020 5:57:47 AM
View Natural Landforms, Vegetation, Riparian Analysis 8/17/2020 8:05:17 PM
View Soils & Geology Report 4/23/2020 2:24:46 PM
View Traffic Impact Study 9/22/2020 3:47:10 PM
View Wastewater Disposal Report 8/19/2020 1:42:25 PM
View Water Resources Report 8/19/2020 1:42:27 PM
View Application 7/14/2020 8:49:25 AM
View Application 7/14/2020 8:49:53 AM
View Application 8/17/2020 8:09:45 PM
View Comment Responses 8/17/2020 8:09:46 PM
View Commitment letter from waste water service provider 8/19/2020 11:29:06 AM
View Commitment letter from water service provider 8/19/2020 2:32:33 PM
View Detailed Response Letter 7/14/2020 8:47:10 AM
View Geotechnical Report 8/17/2020 8:12:49 PM
View Master Development Drainage Plan (MDDP) 11/4/2020 9:43:25 AM
View MDDP Comments 7/14/2020 8:51:44 AM
View MDDP Responses 8/17/2020 8:09:46 PM
View Noise Study 8/17/2020 8:12:50 PM
View Traffic Impact Analysis 8/17/2020 8:05:19 PM
View Traffic Noise Study 7/14/2020 8:48:22 AM



Events (187)

Date Comment
1/11/2021 8:07:12 AM Request for Review Comments returned by Colorado Parks and Wildlife
1/5/2021 10:26:40 AM Fees paid: 1/5/2021 (Receipt: 1003748)
1/5/2021 8:39:36 AM Payment Request sent: 1/5/2021
12/4/2020 8:48:46 AM Project Closed
12/4/2020 8:48:46 AM Project Approved: 12/4/2020
12/2/2020 10:40:46 AM Request for Review Comments returned by EPC Parks Department
12/1/2020 1:54:54 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
11/25/2020 3:07:49 PM Request for Review Comments returned by PCD Engineering Division
11/25/2020 10:37:30 AM Request for Review Comments returned by PCD Project Manager
11/10/2020 3:54:54 PM Request for Review Comments returned by EPC Environmental Services
11/4/2020 1:29:56 PM Request for Review Comments returned by RBD Floodplain
11/4/2020 12:55:19 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23
11/4/2020 12:55:16 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/4/2020 12:55:14 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
11/4/2020 12:55:12 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/4/2020 12:55:10 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
11/4/2020 12:55:08 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of EPC Parks Department
11/4/2020 12:55:06 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
11/4/2020 12:55:04 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
11/4/2020 12:55:00 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/4/2020 12:53:35 PM Submission Triaged
11/4/2020 9:46:28 AM Submission received from Applicant
10/27/2020 12:45:22 PM Submission request sent to Applicant
10/13/2020 10:08:49 AM Request for Review Comments returned by PCD Engineering Division
10/13/2020 9:38:22 AM Request for Review Comments returned by PCD Project Manager
10/9/2020 12:33:52 PM Request for Review Comments returned by Woodmen Hills Metro
10/5/2020 8:07:24 PM Request for Review Comments returned by EPC Health Department
10/2/2020 11:50:26 AM Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
10/1/2020 11:11:38 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/29/2020 10:45:12 AM Project reopened for Review Comments
9/29/2020 10:44:38 AM Project Closed
9/29/2020 10:44:38 AM Project Approved: 9/29/2020
9/29/2020 10:43:38 AM Request for Review Comments returned by PCD Project Manager
9/23/2020 7:22:41 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
9/23/2020 7:22:36 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/23/2020 7:13:02 AM Submission Triaged
9/22/2020 3:48:15 PM Submission received from Applicant
9/22/2020 7:51:35 AM Request for Review Comments returned by Traffic Review Consultant
9/17/2020 9:03:14 AM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
9/15/2020 7:41:10 AM Request for Review Comments returned by Parks Advisory Board
9/10/2020 3:43:20 PM Request for Review Comments returned by Colorado Geological Survey
9/9/2020 2:51:51 PM Request for Review Comments returned by PCD Project Manager
9/8/2020 7:28:43 AM Submission request sent to Applicant
9/4/2020 10:53:03 AM Request for Review Comments returned by Pikes Peak Regional Building Department
9/3/2020 5:27:27 PM Request for Review Comments returned by PCD Engineering Division
8/26/2020 12:30:08 PM Submission Triaged
8/26/2020 12:13:53 PM Submission received from Applicant
8/26/2020 12:07:44 PM Submission request sent to Applicant
8/26/2020 12:07:30 PM Submission Triaged
8/26/2020 11:54:03 AM Submission received from Applicant
8/26/2020 11:25:14 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/26/2020 11:20:39 AM Submission request sent to Applicant
8/26/2020 11:20:25 AM Submission Triaged
8/26/2020 10:35:32 AM Submission received from Applicant
8/25/2020 1:40:06 PM Submission request sent to Applicant
8/25/2020 11:25:21 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/25/2020 11:01:59 AM Submission request sent to Applicant
8/25/2020 9:42:49 AM Submission request sent to Applicant
8/20/2020 1:41:54 PM Request for Review Comments returned by RBD Floodplain
8/20/2020 7:17:15 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro
8/20/2020 7:16:08 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23
8/20/2020 7:14:52 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro
8/20/2020 7:14:51 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
8/20/2020 7:14:50 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant
8/20/2020 7:14:49 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
8/20/2020 7:14:48 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
8/20/2020 7:14:47 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
8/20/2020 7:14:46 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
8/20/2020 7:14:45 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
8/20/2020 7:14:43 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
8/20/2020 7:14:42 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of Parks Advisory Board
8/20/2020 7:14:35 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of EPC Health Department
8/20/2020 7:14:32 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
8/20/2020 7:14:31 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/20/2020 7:11:53 AM Submission Triaged
8/19/2020 4:52:16 PM Submission received from Applicant
8/19/2020 2:37:21 PM Submission request sent to Applicant
8/18/2020 4:43:50 PM Submission request sent to Applicant
8/18/2020 10:41:34 AM Submission request sent to Applicant
8/18/2020 10:41:06 AM Submission Triaged
8/17/2020 8:15:45 PM Submission received from Applicant
8/13/2020 7:26:58 PM Request for Review Comments returned by Colorado Parks and Wildlife
8/6/2020 8:56:49 AM Request for Review Comments returned by PCD Project Manager
8/6/2020 8:55:57 AM Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
8/6/2020 8:54:30 AM Submission request sent to Applicant
8/6/2020 8:53:00 AM Request for Review Comments returned by PCD Project Manager
8/5/2020 9:37:35 PM Request for Review Comments returned by PCD Engineering Division
8/5/2020 8:07:26 AM Request for Review Comments returned by Traffic Review Consultant
8/3/2020 11:34:58 AM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
7/23/2020 12:08:43 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant
7/20/2020 4:30:44 PM Request for Review Comments returned by RBD Floodplain
7/17/2020 2:15:54 PM Request for Review Comments returned by EPC Environmental Services
7/17/2020 10:58:54 AM Request for Review Comments returned by El Paso County Conservation Dist
7/14/2020 11:02:19 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
7/14/2020 11:02:18 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
7/14/2020 11:02:16 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist.
7/14/2020 11:02:15 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Melissa Andrews on behalf of Falcon School District 49
7/14/2020 11:02:14 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
7/14/2020 11:02:12 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
7/14/2020 11:02:11 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/14/2020 11:02:10 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
7/14/2020 11:02:09 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
7/14/2020 11:02:08 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Justin Osborne on behalf of Colorado State Land Board
7/14/2020 10:57:03 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23
7/14/2020 10:57:02 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
7/14/2020 10:57:01 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro
7/14/2020 10:57:00 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
7/14/2020 10:56:59 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
7/14/2020 10:56:57 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
7/14/2020 10:56:56 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/14/2020 10:56:55 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
7/14/2020 10:56:54 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
7/14/2020 10:56:52 AM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/14/2020 10:54:09 AM Submission Triaged
7/14/2020 8:52:15 AM Submission received from Applicant
6/30/2020 4:40:34 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
6/12/2020 11:42:26 AM Request for Review Comments returned by Parks Advisory Board
6/9/2020 3:02:18 PM Request for Review Comments returned by Traffic Review Consultant
6/9/2020 1:31:54 PM Request for Review Comments returned by PCD Engineering Division
6/9/2020 12:48:40 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
6/5/2020 4:19:07 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/5/2020 3:52:27 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant
6/3/2020 4:22:08 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
6/3/2020 4:20:44 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/2/2020 4:44:21 PM Submission request sent to Applicant
6/2/2020 4:33:23 PM Request for Review Comments returned by PCD Engineering Division
6/2/2020 4:32:17 PM Request for Review Comments returned by PCD Project Manager
6/2/2020 2:09:33 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro
5/29/2020 2:10:18 PM Request for Review Comments returned by EPC Parks Department
5/19/2020 10:54:18 PM Request for Review Comments returned by EPC Health Department
5/14/2020 11:25:34 AM Request for Review Comments returned by Peyton 23
5/13/2020 4:46:52 PM Request for Review Comments returned by Colorado Geological Survey
5/13/2020 3:52:55 PM Request for Review Comments returned by Woodmen Hills Metro
5/13/2020 3:30:14 PM Request for Review Comments returned by Pikes Peak Regional Building Department
5/13/2020 2:34:43 PM Request for Review Comments returned by Falcon Fire Protection District
5/13/2020 12:37:37 PM Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro
5/11/2020 10:10:03 AM Request for Review Comments returned by Woodmen Hills Metro
5/9/2020 4:18:54 PM Request for Review Comments returned by County Attorney - Development Review
4/29/2020 4:15:58 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/28/2020 4:20:46 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/27/2020 3:39:00 PM Request for Review Comments returned by EPC Environmental Services
4/23/2020 4:07:03 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro
4/23/2020 4:07:02 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Contact on behalf of Springs East Airport
4/23/2020 4:07:01 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
4/23/2020 4:07:00 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23
4/23/2020 4:06:59 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/23/2020 4:06:57 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
4/23/2020 4:06:56 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
4/23/2020 4:06:55 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist.
4/23/2020 4:06:54 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Barbara Vander Wall on behalf of Four Way Ranch Metro
4/23/2020 4:06:54 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Melissa Andrews on behalf of Falcon School District 49
4/23/2020 4:06:53 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
4/23/2020 4:06:52 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
4/23/2020 4:06:51 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
4/23/2020 4:06:50 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
4/23/2020 4:06:48 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
4/23/2020 4:06:48 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
4/23/2020 4:06:47 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
4/23/2020 4:06:46 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
4/23/2020 4:06:45 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Justin Osborne on behalf of Colorado State Land Board
4/23/2020 4:06:44 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
4/23/2020 4:06:43 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
4/23/2020 4:06:42 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
4/23/2020 4:06:41 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of Parks Advisory Board
4/23/2020 4:06:40 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
4/23/2020 4:06:39 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
4/23/2020 4:06:38 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of EPC Parks Department
4/23/2020 4:06:37 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by on behalf of EPC Health Department
4/23/2020 4:06:35 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
4/23/2020 4:06:34 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review
4/23/2020 4:06:33 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
4/23/2020 4:06:32 PM Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/23/2020 3:17:09 PM Fees paid: 4/23/2020 (Receipt: 1002669)
4/23/2020 2:25:30 PM Payment Request sent: 4/23/2020
4/23/2020 2:25:27 PM Submission Triaged
4/23/2020 2:24:51 PM Submission received from Applicant
4/23/2020 2:17:15 PM File # Assigned: SKP201
4/23/2020 2:15:36 PM Submission request sent to Applicant
4/23/2020 2:15:13 PM Submission Triaged
4/23/2020 2:12:39 PM Submission received from Applicant
4/22/2020 7:46:07 AM Submission request sent to Applicant
4/22/2020 7:45:45 AM Submission Triaged
4/22/2020 6:10:34 AM Submission received from Applicant
2/12/2020 4:09:31 PM Submission request sent to Applicant
2/12/2020 3:32:42 PM Project Manager Assigned: Kari Parsons
2/12/2020 3:32:42 PM EA Assigned: EA2020
2/12/2020 3:32:42 PM Project Created