Project Review Comments

Back to List


File Number
AASI261
Project Name
Williams Creek Generating Station CSU 1041
Description
400MW CSU Gas Power Plant; Includes Water storage and raw water from Williams Creek for operations. Ties into Williams Creek Substation. Identified as optional location in Horizon Gas Plant outreach
Parcels
5600000123 5600000123
Applicant
Vertex Consulting Services, LLC
Craig Dossey ( craig.dossey@vertexcos.com ) Craig Dossey ( craig.dossey@vertexcos.com )
EA Number
EA2680
File Number
AASI261
Project Manager
Kari Parsons
Status
Active
Created
6/17/2026 1:16:18 PM

View: Project Documents | Submit/View Public Comment



Review Comments (41)

Link Agency Review # Comment
PCD Administrative Notice
11/12/2026 1:35:28 PM
1 On 11/12/2026, PCD mailed "Notice of Administrative Determination" letters for AASI261 to surrounding property owners within a 500-foot range (6 addresses). The potential date an administrative decision can be made is 11/26/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $4.68. JM 11/12/2026 1:35:28 PM
Black Hills Energy-Aquila
11/10/2026 2:52:16 PM
1 No comment at this time. 11/10/2026 2:52:16 PM
View PCD Project Manager
11/9/2026 10:44:10 AM
1 Zoning Map Comment 11/9/2026 10:44:10 AM
View PCD Project Manager
11/9/2026 10:43:27 AM
1 CDOT TIS comments October 29, 2026 11/9/2026 10:43:27 AM
View PCD Project Manager
11/9/2026 10:42:35 AM
1 Traffic Impact Study Review 1 Comments 11/9/2026 10:42:35 AM
View PCD Project Manager
11/9/2026 10:41:32 AM
1 PPACG State Health Correspondence/ Application comments 11/9/2026 10:41:32 AM
View PCD Project Manager
11/9/2026 10:38:59 AM
1 Haul Route Plan Comments 11/9/2026 10:38:59 AM
PCD Project Manager
11/9/2026 10:36:33 AM
1 The Emergency Response Plan does not appear to be completed. Please work with Fire District, the Sheriff's wildland fire team and the Office of Emergency Management to complete the Plan. 11/9/2026 10:36:33 AM
View PCD Project Manager
11/9/2026 10:35:10 AM
1 Elevation Plan Set comments 11/9/2026 10:35:10 AM
View PCD Project Manager
11/9/2026 10:32:05 AM
1 Air Quality Management Plan- A draft was uploaded; please see comment. 11/9/2026 10:32:05 AM
View PCD Project Manager
11/9/2026 10:31:02 AM
1 Existing Transmission and Piping and Alternative Maps review 1 comments 11/9/2026 10:31:02 AM
View PCD Project Manager
11/9/2026 10:30:16 AM
1 Vicinity Map comments 11/9/2026 10:30:16 AM
View PCD Project Manager
11/9/2026 10:29:53 AM
1 Map Drawing Comments 11/9/2026 10:29:53 AM
View PCD Project Manager
11/9/2026 10:27:49 AM
1 1041 Documents Related to 5.202 Review Criteria- review 1 comments 11/9/2026 10:27:49 AM
View PCD Project Manager
11/9/2026 10:22:14 AM
1 1041 Documents Related to 5.201 (Items 1-11) - review 1 comments 11/9/2026 10:22:14 AM
View PCD Project Manager
11/9/2026 9:48:20 AM
1 1041 Documents Related to 3.201 (Items 1-4) -No staff comments

1041 Documents Related to 3.202 Review Criteria - review 1 comments attached
11/9/2026 9:48:20 AM
View PCD Project Manager
11/9/2026 9:40:35 AM
1 1041 Documents Related to 2.405 Review Criteria for All
Applications- review 1 comments
11/9/2026 9:40:35 AM
View PCD Project Manager
11/9/2026 9:19:44 AM
1 1041 Documents Related to 2.303 (Items 1-23) Review comments 11/9/2026 9:19:44 AM
View PCD Project Manager
11/9/2026 7:19:49 AM
1 Please be prepared to submit a more detailed soils and Geology, drainage report at the time of the site development plan that addresses CGS comments. Preliminary Drainage Report comments will need to be addressed with the 1041.
Preliminary Drainage Report comments attached.
11/9/2026 7:19:49 AM
EPC Parks Department
11/6/2026 2:12:58 PM
1 Thank you for the opportunity to review this project.

The 2022 El Paso County Parks Master Plan confirms this project does not impact any existing or proposed parks, trails, or open space. While the Kane Ranch Primary Regional Trail is proposed along the Southern area of the property, the current project scope and area does not impact the trail. As such, no park land or trail easement dedications will be necessary as this project moves forward.

Regional fees will be assessed upon review of the associated platting that actions that come before the Parks Department for review.

Thank you!

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
11/6/2026 2:12:58 PM
Pikes Peak Regional Building Department
11/6/2026 11:02:47 AM
1 1. We assigned an address for a Battery Energy Storage System for Pike Solar in 2021 in the location of the Control Building and E-House. Is this not happening now?
2. What are the three meter stations located near Williams Creek south west location of the project? They may need individual addresses for each meter or each location may receive a separate address for utilities.
3. Once the Development Plan has been approved, please send us a clear plan showing street names and locations of any structure that may need an address so we can address the project.

Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
11/6/2026 11:02:47 AM
County Attorney - Development Review
11/6/2026 9:18:52 AM
1 I need to confer with staff and engineering regarding the Development Agreement and proposed Haul Route. County Attorney will submit edits at the next review cycle.

Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
11/6/2026 9:18:52 AM
View Colorado Geological Survey
11/5/2026 4:54:40 PM
1 11/5/2026 4:54:40 PM
EPC DPW Development Services - Engineering
11/6/2026 1:17:09 PM
1 Review 1: Development Services Engineering has provided comments on the following documents (to be uploaded by project manager):

- Existing Transmission and Piping and Alternative Maps
- Preliminary Drainage Report
- Traffic Impact Study
- Haul Route
- Construction Drawings
- Map Drawings

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
11/6/2026 1:17:09 PM
PCD Project Manager
11/9/2026 10:26:34 AM
1 Please modify the duration from 4 years to the perpetuity of the generation plant's lifecycle (99 years) in the 1041 application Exhibit B.

Please provide a detailed list of the primary including MW produced and ancillary components (substation expansion, towers, generators, transmission lines KV, SDS water connection, gas lines to Tallgrass FERC gas line, etc) of the facility for answer 2 in the application.
11/9/2026 10:26:34 AM
PCD Project Manager
11/9/2026 9:48:55 AM
1 Please provide correspondence or a commitment from Hanover Fire Protection District that they can respond to a fire / hazard spill at the site. 11/9/2026 9:48:55 AM
PCD Project Manager
11/5/2026 2:50:13 PM
1 Electromagnetic Interference Report needed. 11/5/2026 2:50:13 PM
View Mountain View Electric Association, Inc.
11/3/2026 9:48:52 AM
1 See attached Comment Letter 11/3/2026 9:48:52 AM
EPC DPW Stormwater
11/3/2026 9:50:38 AM
1 Review 1: EPC DPW Stormwater has no comments on this 1041 application.

Note: Pond calculations will be reviewed further at time of site development plan when final construction drawings and GEC plans are provided. An ESQCP and PCM will be required at site development plan.

Project Manager: no re-review necessary.

Reviewed by:
Mikayla Hartford, P.E.
Senior Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
11/3/2026 9:50:38 AM
EPC Sheriff's Office
10/30/2026 5:36:40 PM
1 As the site is within Hanover Fire Protection District, EPSO defers all fire review and comments to Hanover Fire. 10/30/2026 5:36:40 PM
View Colorado Parks and Wildlife
10/30/2026 1:36:31 PM
1 10/30/2026 1:36:31 PM
View Colorado Department of Transportation - Pueblo Office
10/30/2026 8:35:31 AM
1 Please refer to the attached letter for CDOT's comments regarding this development. 10/30/2026 8:35:31 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/29/2026 9:23:47 AM
1 CSU UDS has reviewed this proposal and the project is outside of CSU water, wastewater, gas, and electric service areas. 10/29/2026 9:23:47 AM
E911 Authority - El Paso/Teller County
10/28/2026 8:57:46 AM
1 Comments for E911 as follows:

There are existing named roadways throughout this development.
These names should be depicted on the plan drawings.

Thank you.
Justin
10/28/2026 8:57:46 AM
View Xcel Energy
10/27/2026 9:20:24 AM
1 10/27/2026 9:20:24 AM
US Army Corps of Engineers
10/13/2026 10:21:59 AM
1 Our office reviewed the site over 5 years ago. However, that review is out-of-date. If the applicant proposes to impact aquatic resources, it is recommended they contact our office. Additionally, they should contact CDPHE, Dredge and Fill Program. 10/13/2026 10:21:59 AM
View EPC Environmental Services
10/9/2026 2:11:55 PM
1 10/9/2026 2:11:55 PM
Schriever Space Force Base
10/9/2026 10:21:27 AM
1 Through contract support, Headquarters Combat Forces Command is now conducting Space Operations Installations Compatible Use Zones studies for both Schriever and Peterson Space Force Bases. The SOICUZ studies evaluate land areas surrounding our installations for operational impacts associated with sources of electromagnetic interference, among other aspects. Specific recommendations to promote land use compatibility from both studies are forthcoming and will be shared once complete. We look forward to reviewing the full EMI report document when made available to assess for any specific SOICUZ program impacts. 10/9/2026 10:21:27 AM
Colorado Springs Airport Advisory Commission
10/8/2026 9:52:53 AM
1 Airport has no comments, development is outside airport overlay. 10/8/2026 9:52:53 AM
Meadow Lake Airport Association
10/7/2026 5:35:02 PM
1 Based on the information provided, the proposed site is well outside the Airport Influence Area of Meadow Lake Airport and should pose no hazards or concerns to our traffic pattern. Thank you. 10/7/2026 5:35:02 PM
RBD Floodplain
10/7/2026 4:11:32 PM
1 project location not in SFHA per CDs 10/7/2026 4:11:32 PM