Description
TOWER WORK Install: (3) sector mount(s), (9) antenna(s), (3) RRH(s), (2) OVP(s), and (2) 1 1/4" 6X12 hybrid cable(s) GROUND WORK Install: (1) concrete pad, (1) 3 bay plinth, (1) equipment cabinet, (1) battery cabinet, (1) ice bridge, (1) equipment canopy, (1) 30KW generator, (1) 6672 BBU, (1) disconnect, (1) GPS antenna, (1) utility meter, (1) ATS/ILC, (2) led work Lamps, (1) GE NE-M PDF, (2) -48V strings of deka HT200'S (or equivalent), (1) BDFB, (1) Nokia IXRE2 router, (1) fiber provider NID, (1) fiber provider FDP, (1) RMX& RMB, (2) 4520 OVP, (1) DC upconverter, (2) fiber slack tray, and underground power and telco in joint trench
Parcels
5132000002 5132000002
Applicant
Fullerton Engineering
Authorized Agent Nora Geci ( ngeci@fullerton-us.com )
(217) 636-4468
Authorized Agent Nora Geci ( ngeci@fullerton-us.com )
(217) 636-4468
File Number
TWR261
Project Manager
Lisa Elgin
Status
Active
Created
2/9/2026 2:44:10 PM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
PCD Project Manager
3/4/2026 10:13:38 AM
1 The tolling period is paused until a resubmittal is received. 3/4/2026 10:13:38 AM
View PCD Project Manager
3/4/2026 10:12:35 AM
1 See comments on Site Plan Drawing. 3/4/2026 10:12:35 AM
View PCD Project Manager
3/4/2026 10:12:13 AM
1 See comments on Letter of Intent. 3/4/2026 10:12:13 AM
View PCD Project Manager
3/4/2026 10:11:48 AM
1 See comments on Lease Agreement. 3/4/2026 10:11:48 AM
View PCD Project Manager
3/4/2026 10:11:29 AM
1 See comments on Elevation Plan. 3/4/2026 10:11:29 AM
View PCD Project Manager
3/4/2026 10:11:04 AM
1 See comments on Application 3/4/2026 10:11:04 AM
EPC DPW Stormwater
3/2/2026 2:46:16 PM
1 Review 1: EPC DPW Stormwater has no comments on this tower modification.

Note: The proposed area of soil disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
3/2/2026 2:46:16 PM
Pikes Peak Regional Building Department
2/27/2026 1:28:50 PM
1 All carriers receive separate addresses. 7113 Marshbern Court is the address for AT&T. We have assigned 7117 Marshbern Court as the address for Verizon. When submitting plans, be sure to show 7117 Marshbern Court as the address or plans will be disapproved by Enumerations. No further comment.

Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
2/27/2026 1:28:50 PM
Black Forest Fire Protection District
2/26/2026 2:42:17 PM
1 Black Forest Fire & Rescue has reviewed the associated documents submittal and offer no comments. 2/26/2026 2:42:17 PM
View Mountain View Electric Association, Inc.
2/25/2026 2:41:21 PM
1 See attached comment letter 2/25/2026 2:41:21 PM
911 Authority - El Paso/Teller County
2/18/2026 1:21:51 PM
1 No action for E911 on this submittal.
Thank you.
Justin
2/18/2026 1:21:51 PM
EPC DPW Development Services - Engineering
2/17/2026 1:05:48 PM
1 Review 1.

On page 4 of the Site Plan Drawing document, the approximate location of proposed telco handholes are shown within the Marshbern Court right of way (El Paso County owned and maintained). If the final location of these handholes will be within the right of way, a work in the right of way permit must be completed prior to the commencement of any work within the right of way. The application may be completed online at the following link: https://www.epc-rowpermit.com/. Feel free to contact me if you have any questions.

Project Manager:
No other engineering comments on the submitted documents. No re-review needed.

Reviewed by:
Joe Sandstrom, EIT, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
2/17/2026 1:05:48 PM