Description
720 square foot detached ALQ.
Parcels
5407111011 5407111011
Applicant
Kristi Shuton
Kristi Shuton ( kshuton21@gmail.com )
(626) 278-8706
Kristi Shuton ( kshuton21@gmail.com )
(626) 278-8706
File Number
AL2526
Project Manager
Lisa Elgin
Status
Active
Created
10/21/2025 9:14:40 AM

View: Project Documents



Review Comments (18)

Link Agency Review # Comment
View PCD Project Manager
12/4/2025 2:46:13 PM
2 See comments on RIF Acknowledgement. 12/4/2025 2:46:13 PM
View PCD Project Manager
12/4/2025 2:45:51 PM
2 See comments on Letter of Intent. 12/4/2025 2:45:51 PM
EPC DPW Development Services - Engineering
12/4/2025 8:36:45 AM
2 Review 2.

Engineering comments on the following documents (to be uploaded by the project manager):
- Road Impact Fee Acknowledgment Form

Driveway Access Permit has been approved under AP251098.

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
12/4/2025 8:36:45 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/21/2025 12:17:41 PM
2 Action Item: Gas and electric meter locations on plan view and building elevations must be shown and labeled.

Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls."

Action Item: Add note “CSU Field Engineer to determine final gas/electric meter, transformer, and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.”
11/21/2025 12:17:41 PM
Pikes Peak Regional Building Department
11/20/2025 11:12:43 AM
1 There was a typo on my part. The ALQ should be 1099-B. My apologies. 11/20/2025 11:12:43 AM
View EPC Health Department
11/18/2025 9:19:43 AM
1 11/18/2025 9:19:43 AM
View PCD Project Manager
11/17/2025 4:22:38 PM
1 See comments on Site Plan Drawing. 11/17/2025 4:22:38 PM
View PCD Project Manager
11/17/2025 4:22:18 PM
1 See comment on Road Impact Fee Acknowledgement. 11/17/2025 4:22:18 PM
View PCD Project Manager
11/17/2025 4:21:53 PM
1 See comment on Application. 11/17/2025 4:21:53 PM
View PCD Project Manager
11/17/2025 4:21:30 PM
1 See comments on Letter of Intent. 11/17/2025 4:21:30 PM
EPC DPW Stormwater
11/17/2025 12:13:16 PM
1 Review 1: EPC DPW Stormwater comments has no comments, this project will not disturb more than an acre. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
11/17/2025 12:13:16 PM
Pikes Peak Regional Building Department
11/17/2025 10:22:54 AM
1 Enumerations has the following comments:

1. Enumerations has assigned the address of 1009-B for use with this garage conversion. All building plans submitted for this project need to show this address.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
11/17/2025 10:22:54 AM
View EPC DPW Development Services - Engineering
11/17/2025 8:21:39 AM
1 Blank Form - Road Impact Fee Acknowledgement Form 11/17/2025 8:21:39 AM
View EPC DPW Development Services - Engineering
11/17/2025 8:09:22 AM
1 Driveway access permit instructions 11/17/2025 8:09:22 AM
EPC DPW Development Services - Engineering
11/17/2025 8:20:42 AM
1 Review 1.

Engineering comments provided in blue on the following documents (to be uploaded by the project manager at a later date):
- Letter of Intent
- Site Plan Drawing
- Road Impact Fee Acknowledgement Form

Please note that a driveway access permit is not on file for the existing driveway. The home was constructed prior to this permit process and therefore the fee will be waived. A permit must be obtained prior to receiving a building permit. Please see the application instructions uploaded as a separate file. Feel free to contact me if you have any questions

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
11/17/2025 8:20:42 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/10/2025 2:04:09 PM
1 Action Item: Gas and electric meter locations on plan view and building elevations must be shown and labeled. If service lines from main dwelling, then show proposed connection.

Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls.", if applicable.

Action Item: Add note “CSU Field Engineer to determine final gas/electric meter and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.”
11/10/2025 2:04:09 PM
Cherokee Metro Dist
11/5/2025 3:27:36 PM
1 Service lines for water and wastewater for the new dwelling unit must be tied into your main house's existing service lines. The water service line becomes the residence owner's property after the curb box. The wastewater or sanitary sewer service line is the residence owner's property from the house until it reaches the sewer main or trunk in the middle of the culdesac 11/5/2025 3:27:36 PM
PCD Administrative Notice
10/28/2025 9:34:58 AM
1 On 10/28/2025, PCD mailed "Notice of Administrative Determination" letters for AL2526 to surrounding property owners within a 500-foot range (94 addresses). The potential date an administrative decision can be made is 11/11/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $69.56. JM 10/28/2025 9:34:58 AM