7955 W Hwy 24 Side Yard Setback Relief
Description
Administrative Relief to allow a 4' side yard setback where 5' is required in R-T (Residential Topographic) zoning district. Table 5-4, Footnote 12: "The side yard setback is 25 feet when the lot is 5 acres or larger, or 5 feet if the lot is less than 5 acres." Land Development Code 1971 R-T lot size minimum was 10,000 sq. ft. Lot creation date: 2-16-1968.
Location
Parcels
8326200049 8326200049
Applicant
McCracken Professional Group LLC
Matt McCracken ( office@mccrackenpros.com )
(719) 491-6198
Matt McCracken ( office@mccrackenpros.com )
(719) 491-6198
File Number
ADR258
Project Manager
Miranda Benson
Status
Active
Created
8/15/2025 11:20:16 AM

View: Project Documents



Review Comments (4)

Link Agency Comment
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/4/2025 12:22:07 PM
Please address the following comments:

Label height of new retaining wall.

Show and label existing underground electric service line "Secondary UG Conductor:12HY-2" to ensure no conflict. Call 811 locates to confirm exact location.
9/4/2025 12:22:07 PM
EPC DPW Stormwater
9/2/2025 4:05:03 PM
Review 1: EPC DPW Stormwater has no comments. The proposed project will not disturb greater than 1 ac of soil.

EPC Project Manager: no re-review necessary.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
9/2/2025 4:05:03 PM
EPC DPW Development Services - Engineering
9/2/2025 2:49:54 PM
Review 1.

Engineering comments in blue on the following document (to be uploaded by the project manager at a later date):
- Letter of Intent
- Site Plan Drawing

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
9/2/2025 2:49:54 PM
PCD Administrative Notice
8/27/2025 11:26:25 AM
On 08/27/2025, PCD mailed "Notice of Administrative Determination" letters for ADR258 to surrounding property owners within a 500-foot range (19 addresses). The potential date an administrative decision can be made is 09/10/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $14.06 JM 8/27/2025 11:26:25 AM