Project Review Comments

Back to List


File Number
ASB2551
Project Name
Retreat at Timberridge Fil 4 Plat (AKA TimberRidge Estates)
Description
A new year 2024 final plat for 10 single-family lots portion of the Retreat at TimberRidge PUD; Previously known TimberRidge Estates Included in original Retreat at TimberRidge PUD
Location
North of Arroya and east of Vollmer
Parcels
5222000023 5222000023 5222000025 5222000025
Applicant
Classic Homes Construction
PE Marc Whorton ( MWhorton@classicconsulting.net )
(719) 492-1220
PE Marc Whorton ( MWhorton@classicconsulting.net )
(719) 492-1220
File Number
ASB2551
Project Manager
Stormwater Mikayla Hartford
Status
Active
Created
7/28/2025 1:17:52 PM

View: Project Documents



Review Comments (7)

Link Agency Review # Comment
EPC DPW Asset Management
4/27/2026 8:14:03 AM
2 We have reviewed your case and given your circumstances, we are prepared to accept your CAD files as is.

Please note that El Paso County is working to update and clarify the language in the Engineering Criteria Manual (ECM) to require CAD files and drawings to be submitted in the county’s defined coordinate system of Colorado State Plane Central Zone and with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of the ECM below.

5.10.5.C: Monument Caps and Data
All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law.

As we prepare for this update, we are asking that you begin to deliver to us CAD files and drawings that meet these standards. This will help ensure a smooth transition as we work to incorporate these changes into our standard language in the ECM.

Good day,

Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
4/27/2026 8:14:03 AM
View EPC DPW Stormwater
4/13/2026 4:37:28 PM
1 PCM Cert Letter Comments 4/13/2026 4:37:28 PM
View EPC DPW Stormwater
4/13/2026 4:36:39 PM
1 As-built Comments 4/13/2026 4:36:39 PM
EPC DPW Development Services - Inspections
4/13/2026 10:39:19 AM
1 No Comments from Inspections 4/13/2026 10:39:19 AM
EPC DPW Development Services - Engineering
4/13/2026 10:30:27 AM
1 DPW Engineering Review 1.

CAD file did not contain cad information, only appeared to be cover sheet with notes. Please provide appropriate CAD file with base and design information.

Redlines comment provided on Record drawings.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
4/13/2026 10:30:27 AM
EPC DPW Stormwater
4/13/2026 8:06:20 AM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-builts
- PCM Certification Letter

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
4/13/2026 8:06:20 AM
EPC DPW Asset Management
3/30/2026 9:30:33 AM
1 CAD was submitted without map/model attached. Please resubmit.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
3/30/2026 9:30:33 AM