Project Review Comments
- Project Name
- Terra Ridge North Final Plat (Minor)
- Description
- Proposed 11 lot subdivision with ROW extension from the south. Subdivision will need to include Lots 5 & 6 Terra Ridge Subdivision due to ROW dedication. No prelim plan final plat will need to go to public hearing. BoCC approved rezone to RR-2.5 9/6/22 (P-22-7)
- Location
- 15630 Fox Creek Lane
- Parcels
- 5129300002 5129300002 5129302011 5129302011 5129302012 5129302012
- Applicant
-
Miles Subdivision 1
Shay Miles ( shay@milestoneeng.org )
(719) 352-8886 Shay Miles ( shay@milestoneeng.org )
(719) 352-8886 - File Number
- ASB2550
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 7/1/2025 2:06:51 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC DPW Stormwater
9/22/2025 5:18:33 PM |
Public Improvement Letter | 9/22/2025 5:18:33 PM |
View |
EPC DPW Stormwater
9/22/2025 5:18:22 PM |
PCM Certification Letter | 9/22/2025 5:18:22 PM |
View |
EPC DPW Stormwater
9/22/2025 5:18:05 PM |
Engineering Record Drawings (As-Builts) | 9/22/2025 5:18:05 PM |
EPC DPW Development Services - Inspections
9/22/2025 5:08:11 PM |
Please upload the third party concrete testing results for all the concrete poured in the pond structures. Brad Walters Inspection Supervisor |
9/22/2025 5:08:11 PM | |
EPC DPW Development Services - Engineering
9/22/2025 4:28:15 PM |
Engineering Review 1 No engineering comments. Review by Bret Dilts, PE bretdilts@elpasoco.com |
9/22/2025 4:28:15 PM | |
EPC DPW Asset Management
9/18/2025 10:29:02 AM |
Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
9/18/2025 10:29:02 AM | |
EPC DPW Stormwater
9/16/2025 12:21:53 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter - Public Improvement Letter Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
9/16/2025 12:21:53 PM |