Project Review Comments
- Project Name
- 18370 Hwy 94 - Fiber Optic Storage Building
- Description
- SDP to add a 864 sq ft structure for storage of materials for fiber optics
- Location
- Parcels
- 3407000001 3407000001
- Applicant
-
Five Nine Design Group
rex@five9dg.com ( rex@five9dg.com ) rex@five9dg.com ( rex@five9dg.com ) - File Number
- PPR2534
- Project Manager
- Maria Lancto
- Status
- Active
- Created
- 5/30/2025 8:33:49 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View |
PCD Project Manager
11/5/2025 3:12:27 PM |
V1_Site Development Plan | 11/5/2025 3:12:27 PM |
| View |
PCD Project Manager
11/5/2025 3:12:11 PM |
V1_Sign Plan | 11/5/2025 3:12:11 PM |
| View |
PCD Project Manager
11/5/2025 3:11:55 PM |
V1_PCM Applicability Form | 11/5/2025 3:11:55 PM |
| View |
PCD Project Manager
11/5/2025 3:11:32 PM |
V1_Lighting Plan | 11/5/2025 3:11:32 PM |
| View |
PCD Project Manager
11/5/2025 3:11:11 PM |
V1_Letter of Intent | 11/5/2025 3:11:11 PM |
| View |
PCD Project Manager
11/5/2025 3:10:58 PM |
V1_Landscape Plan drawings | 11/5/2025 3:10:58 PM |
| View |
PCD Project Manager
11/5/2025 3:10:37 PM |
V1_Application-Petition Form | 11/5/2025 3:10:37 PM |
|
PCD Project Manager
11/5/2025 3:10:07 PM |
EPC Planning Review 1: Please see the following documents for Planning comments. - V1_Application-Petition Form - V1_Landscape Plan drawings - V1_Letter of Intent - V1_Lighting Plan - V1_PCM Applicability Form - V1_Sign Plan - V1_Site Development Plan If owner's signature is not obtained on the resubmitted application, please provide a letter of authorization stating that the designated representative may submit on their behalf. Future submittals should split out review items. Such as only landscaping pages submitted under landscaping plan. Thanks, Maria Lancto, AICP Senior Planner marialancto@elpasoco.com 719-520-6447 |
11/5/2025 3:10:07 PM | |
| View |
EPC DPW Development Services - Engineering
11/5/2025 2:34:20 PM |
Road Impact Fee Acknowledgement Form - To be resubmitted | 11/5/2025 2:34:20 PM |
|
EPC DPW Development Services - Engineering
11/5/2025 1:37:27 PM |
Review 1. Engineering comments on the following documents (to be uploaded by the project manager): - Letter of Intent - Site Development Plan Road Impact Fee Acknowledgement Form has been uploaded. Please insert building square footage and sign and resubmit form with the next submittal. Fees will be due prior to approval of this application. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
11/5/2025 1:37:27 PM | |
|
EPC DPW Stormwater
11/4/2025 7:39:05 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - PCM Applicability Form Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
11/4/2025 7:39:05 AM | |
|
Pikes Peak Regional Building Department
10/28/2025 12:02:12 PM |
The address for the new building is 18308 Hwy 94. Please submit plans for the new building under this address. No further comment. Thank you, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
10/28/2025 12:02:12 PM | |
|
Ellicott Fire Protection District
10/27/2025 3:08:42 PM |
Entrance/ access must follow the following code. D103.5 Fire apparatus access road gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: 1.Where a single gate is provided, the gate width shall be not less than 20 feet (6096 mm). Where a fire apparatus road consists of a divided roadway, the gate width shall be not less than 12 feet (3658 mm). 2.Gates shall be of the swinging or sliding type. 3.Construction of gates shall be of materials that allow manual operation by one person. 4.Gate components shall be maintained in an operative condition at all times and replaced or repaired when defective. 5.Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. 6. Methods of locking shall be submitted for approval by the fire code official. 7.Electric gate operators, where provided, shall be listed in accordance with UL 325. 8.Gates intended for automatic operation shall be designed, constructed and installed to comply with the requirements of ASTM F 2200. |
10/27/2025 3:08:42 PM | |
|
Colorado Department of Transportation - Pueblo Office
10/27/2025 2:20:15 PM |
Access to the state highway is already permitted through permit #220028. A new CDOT access permit is not required at this time. | 10/27/2025 2:20:15 PM | |
|
Upper Black Squirrel Creek GWMD
10/24/2025 3:30:26 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 10/24/2025 3:30:26 PM | |
|
RBD Floodplain
10/23/2025 2:47:03 PM |
side is not in the floodplain , no comment | 10/23/2025 2:47:03 PM | |
|
Colorado Springs Airport Advisory Commission
10/23/2025 10:58:00 AM |
The Airport has no comments, this property falls outside the Airport Overlay. | 10/23/2025 10:58:00 AM |
EDARP