Project Review Comments

Back to List


Project Name
305 Pine Oaks Rd
Description
Permanent Occupancy of ALQ
Location
Parcels
7525000014 7525000014
Applicant
T-Bone Construction
Marcos Cazaras ( marcos.cazares@tboneconstruction.com )
(720) 236-4628
Marcos Cazaras ( marcos.cazares@tboneconstruction.com )
(720) 236-4628
File Number
AL2516
Project Manager
Lacey Dean
Status
Active
Created
5/13/2025 1:03:24 PM

View: Project Documents



Review Comments (10)

Link Agency Comment
Colorado Springs Public Works
8/8/2025 9:00:50 AM
EDRD has no comments on this item.
Reviewed by Hao Vo, P.E.
hao.vo@coloradosprings.gov
8/8/2025 9:00:50 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/6/2025 1:55:29 PM
Action Item: Show and label "Existing 12.5kV Primary OH Conductor: 12JL-1. Include horizontal dimension to confirm separation.

Use the following web link to access the Mapping Public Portal
https://www.csu.org/building-development/gis-mapping-services
8/6/2025 1:55:29 PM
View EPC DPW Development Services - Engineering
8/5/2025 1:41:08 PM
Access Permit Instructions 8/5/2025 1:41:08 PM
View EPC DPW Development Services - Engineering
8/5/2025 1:40:44 PM
Road Impact Fee Acknowledgement Form 8/5/2025 1:40:44 PM
EPC DPW Stormwater
8/5/2025 1:10:38 PM
Review 1: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
8/5/2025 1:10:38 PM
EPC DPW Development Services - Engineering
8/5/2025 1:39:58 PM
Review 1.

Engineering comments in blue boxes on the following documents, which will be uploaded by the project manager:
- Letter of Intent
- Site Plan

Please fill out and submit the Road Impact Fee Acknowledgement Form. A copy of the form has been uploaded into EDARP. Fees for a multi-family land use is $2,585.

Access Permit instructions have been uploaded as a separate file.

Feel free to reach out to me if you have any questions about the comments.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
(719) 520-7951
8/5/2025 1:39:58 PM
Colorado Springs Planning & Community Development
7/30/2025 5:18:30 PM
City Planning has no comments. 7/30/2025 5:18:30 PM
PCD Administrative Notice
7/25/2025 9:37:47 AM
On 07/24/2025, PCD mailed "Notice of Administrative Determination" letters for AL2516 to surrounding property owners within a 500-foot range (17 addresses). The potential date an administrative decision can be made is 08/07/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $12.58 JM 7/25/2025 9:37:47 AM
Southwestern Hwy 115 Fire Protection District
7/24/2025 12:12:45 PM
The Sw Hwy 115 FPD requires the home site to be mitigated to Colorado State Forest service specs, out to 100' All roads and driveways should meet NFPA standards. 14' width min and space to turn a fire truck around at end of drives. Chief Wright 7/24/2025 12:12:45 PM
Colorado Springs Public Works
7/23/2025 12:28:25 PM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
7/23/2025 12:28:25 PM