Project Review Comments
- Project Name
- Offsite Water Line Trails at Aspen Ridge
- Description
- Location
- Parcels
- 5500000015 5500000015
- Applicant
-
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609 Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609 - File Number
- CDR252
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 4/10/2025 11:14:14 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC DPW Development Services - Engineering
5/6/2025 6:31:21 PM |
EPC Engineering Review 2 had comments on the following documents: - FAE (Include quantity of aggregate used to replace work done in Lonewood Drive) - CDs (Please provide County signature block on cover sheet, due to work within County ROW) Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
5/6/2025 6:31:21 PM |
EPC DPW Stormwater
5/6/2025 1:20:40 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s): - GEC Plan - GEC Checklist - SWMP - SWMP Checklist EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
5/6/2025 1:20:40 PM | |
View |
EPC DPW Stormwater
4/23/2025 10:45:30 AM |
FAE_v1 | 4/23/2025 10:45:30 AM |
View |
EPC DPW Stormwater
4/23/2025 10:45:15 AM |
SWMP Checklist_v1 | 4/23/2025 10:45:15 AM |
View |
EPC DPW Stormwater
4/23/2025 10:44:56 AM |
SWMP_v1 | 4/23/2025 10:44:56 AM |
View |
EPC DPW Stormwater
4/23/2025 10:44:35 AM |
GEC Checklist_v1 | 4/23/2025 10:44:35 AM |
View |
EPC DPW Stormwater
4/23/2025 10:44:13 AM |
GEC_v1 | 4/23/2025 10:44:13 AM |
EPC DPW Stormwater
4/23/2025 8:23:23 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - GEC Plan...............(uploaded with Development Services comments) - GEC Checklist - SWMP - SWMP Checklist Please submit the following documents for review: - PCM Applicability Form Reviewed by: Christina Prete, P.E. Stormwater Manager 719.520.6877 ChristinaPrete@elpasoco.com |
4/23/2025 8:23:23 AM | |
EPC DPW Development Services - Engineering
4/22/2025 1:17:24 PM |
EPC Engineering Review 1 had comments on the following documents: - GEC Plans (See Comments to be uploaded by Stormwater) - FAE (See Comments to be uploaded by Stormwater) - CDs (See Comments below) 1. Please provide standard County signature block on CD's. 2. Please verify vertical clearance is minimum of 1.5' with all storm facilities. (See Page 8). 3. A work in the ROW Permit will be required for work within Fontaine, Rolling View and Lonewood. Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
4/22/2025 1:17:24 PM |