Project Review Comments

Back to List


File Number
ASB2520
Project Name
Falcon Meadows at Bent Grass Fil. No. 1
Description
71 Single-family lots and public right-of-way. FOR PLAT RECORDING Needs SIA with 3 FAES (sub, Woodmen Frontage, and channel), offsite easement agreements, pond agreement, escrow agreement for Woodmen and Golden Sage PCD needs acknowledge on two emails regrading coordination related to the conditions of approval.
Parcels
5301000021 5301000021 5301000023 5301000023 5301000036 5301000036 5301000037 5301000037 5301204005 5301204005 5301204006 5301204006 5301204007 5301204007 5301301028 5301301028
Applicant
Galloway & Company, Inc. Colorado Springs Office
Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220
Shared Galloway Email ( galloway-citycs@gallowayus.com )
(719) 900-7220
File Number
ASB2520
Project Manager
Stormwater Glenn Reese
Status
Active
Created
2/24/2025 8:18:03 AM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
EPC DPW Asset Management
4/13/2026 2:06:58 PM
2 We have reviewed your case and given your circumstances, we are prepared to accept your files as is.

Please note that El Paso County is working to update and clarify the language in the Engineering Criteria Manual (ECM) to require CAD files and drawings to be submitted in the county’s defined coordinate system of Colorado State Plane Central Zone and with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of the ECM below.

5.10.5.C: Monument Caps and Data
All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law.

As we prepare for this update, we are asking that you begin to deliver to us CAD files and drawings that meet these standards. This will help ensure a smooth transition as we work to incorporate these changes into our standard language in the ECM.

Good day,
Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
4/13/2026 2:06:58 PM
View PCD Engineering Division
4/9/2026 11:14:56 PM
2 Review 2 comments on the following documents will be uploaded:
-Engineering record drawings.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
4/9/2026 11:14:56 PM
View EPC Stormwater Review
4/7/2026 12:45:48 PM
2 PCM Certification Letter and Revised MHFD Calcs 4/7/2026 12:45:48 PM
PCD Engineering Inspections
4/2/2026 8:08:27 AM
2 No comments for Inspections. 4/2/2026 8:08:27 AM
EPC Stormwater Review
4/7/2026 12:12:40 PM
2 Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- PCM Certification Letter and Revised MHFD Calcs

EPC DPW Stormwater comments have been resolved on the following document(s):
- Engineering Record Drawings (As-Builts)
- Public Improvement Certification Letter

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
4/7/2026 12:12:40 PM
View EPC Stormwater Review
12/8/2025 5:20:08 PM
1 Public Improvement Certification Letter 12/8/2025 5:20:08 PM
View EPC Stormwater Review
12/8/2025 5:19:55 PM
1 PCM Certification Letter and Revised MHFD Calcs 12/8/2025 5:19:55 PM
View EPC Stormwater Review
12/8/2025 5:19:42 PM
1 Engineering Record Drawings (As-Builts) 12/8/2025 5:19:42 PM
PCD Engineering Inspections
12/8/2025 3:02:22 PM
1 Please see my comments in red text with a yellow box.
Brad Walters
Inspections Supervisor
12/8/2025 3:02:22 PM
PCD Engineering Division
12/2/2025 4:59:16 PM
1 Review 1 comments on the following documents will be uploaded:
-Engineer Record Drawings (as-Built)
-Road Certification letter

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
12/2/2025 4:59:16 PM
EPC Stormwater Review
12/8/2025 5:19:26 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Engineering Record Drawings (As-Builts)
- PCM Certification Letter and Revised MHFD Calcs
- Public Improvement Certification Letter.

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
12/8/2025 5:19:26 PM
EPC DPW Asset Management
11/25/2025 7:54:48 AM
1 Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
11/25/2025 7:54:48 AM