Project Review Comments
- Project Name
- CDR Vollmer Road (Marksheffel to Poco)
- Description
- interim plan approved phase 1 New segment review 7/32/2023 2cd phase in review final plans segmented
- Location
- Applicant
-
JR Engineering
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241 Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241 - File Number
- ASB2511
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 2/11/2025 9:25:55 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Inspections
7/29/2025 2:38:12 PM |
Inspections has no other comments than what Engineering has. | 7/29/2025 2:38:12 PM | |
View |
PCD Engineering Division
7/28/2025 7:02:48 AM |
Road Certification Letter comments | 7/28/2025 7:02:48 AM |
View |
PCD Engineering Division
7/28/2025 7:02:32 AM |
As-Built Drawing comments | 7/28/2025 7:02:32 AM |
PCD Engineering Division
7/24/2025 5:07:14 PM |
Review 1. Engineering comments on the following documents: - As-Built Drawings - Road Certification Letter Note: Please markup the approved drawings and resubmit those for the next review. The drawings that were marked up and submitted for the current review were not the approved drawings. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
7/24/2025 5:07:14 PM | |
EPC DPW Asset Management
7/21/2025 9:56:20 AM |
CAD is empty framework for XREF's, which are all missing. | 7/21/2025 9:56:20 AM | |
EPC Stormwater Review
7/14/2025 7:41:55 AM |
Review 1: EPC DPW Stormwater has no comments. Please address any/all comments from other EPC teams (due 7/23). Thanks. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
7/14/2025 7:41:55 AM |