Project Review Comments
- File Number
- SF2532
- Project Name
- Flying Horse North Filing No. 7
- Parcels
- 5100000291 5100000291 5100000437 5100000437 5131000002 5131000002 6136000011 6136000011
- Applicant
-
HR Green Inc.
Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430 Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430 - File Number
- SF2532
- Project Manager
- Ryan Howser
- Status
- Active
- Created
- 2/7/2025 3:12:10 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
911 Authority - El Paso/Teller County
12/3/2025 8:58:38 AM |
1 |
Streetnames previously approved. No action for E911 on this submittal. Thank you. Justin |
12/3/2025 8:58:38 AM | |
| View |
Colorado Department of Transportation - Pueblo Office
12/1/2025 12:39:11 PM |
1 | Please refer to the attached letter. | 12/1/2025 12:39:11 PM |
|
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/1/2025 8:49:00 AM |
1 | No comment. Outside of Colorado Springs Utilities service area. | 12/1/2025 8:49:00 AM | |
|
RBD Floodplain
12/1/2025 8:13:27 AM |
1 |
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less; All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; The parcel is located within the current effective Zone A floodplain with no BFEs(no supporting model available). Draft model backed BFEs for this area have been developed as part of Phase 1 for the ongoing El Paso County, CO, Risk MAP Project”. The data has been reviewed and approved through FEMA’s QA/QC process (May 11, 2022) and is currently in the MIP (Case No. 19-08-0037s). The Phase 1/Base Level Engineering outputs and Zone A ready deliverables are, under the following folder: K:/FY2019/19-08-0037S/Discovery - BLE - El Paso and Teller Counties, CO - FY18 - 04/Discovery Data Capture - Discovery Data Capture - El Paso and Teller Counties, CO - 01/El Paso_Discovery_1 BFEs from the aforementioned study should be shown on the final plat to comply with RBC 313.18.5 |
12/1/2025 8:13:27 AM | |
|
Academy SD 20 Building Fund
12/1/2025 7:27:54 AM |
1 |
Academy District 20 is in receipt of File #SF2532 for approval of the Flying Horse North Filing No. 7. It appears that the majority, if not all, of Flying Horse Number 7 is located in District 38. For any or all lots located in District 20, the District is requesting fees in lieu of land dedication per the existing County Code. The District is experiencing ongoing residential development. The District gained approximately 13,650 new residential units between 2018 and 2025 which included 5,650 Single Family, 1,225 Single Family Attached, and 6,800 Apartments as reported to the District by local developers. During that same timeframe, the District only experienced a total membership increase of 23 students. This information is updated annually in October. A drop in the birth rate plus the significant increase in the cost of housing has slowed student growth in the District. The District is able to serve each student who is a resident of District 20. If you need additional information, please contact me. Don Smith Planning Consultant |
12/1/2025 7:27:54 AM | |
|
Pikes Peak Regional Building Department
11/26/2025 12:37:15 PM |
1 |
1. Addresses were assigned and received, please add them to the plat. 2. Standard final plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department. c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |