Project Review Comments

Back to List


File Number
SF2628
Project Name
Welsch at Howells Final Plat
Description
taking 1 parcel into 2 lots. Rezone to RR2.5 must be approved first.
Parcels
6214000071 6214000071
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
EA257
File Number
SF2628
Project Manager
Jen Uhler
Status
Active
Created
1/30/2025 8:43:30 AM

View: Project Documents | Submit/View Public Comment



Review Comments (29)

Link Agency Review # Comment
Black Forest Fire Protection District
11/10/2026 8:01:17 PM
1 Black Forest Fire Rescue reviewed the submitted materials for Welsch at Howells Final Plat, SF2628, proposing two residential lots with one additional single-family residence. The following comments address fire apparatus access and Colorado Wildfire Resiliency Code compliance.

1. Fire apparatus access — IFC Section 503

The Fire Protection Report identifies an existing 12-foot-wide asphalt driveway within a 30-foot access easement. The easement width does not establish the usable width of the roadway.

Provide a dimensioned access plan showing the complete route from Howells Road to the proposed residence, including the shared driveway, any extension, apparatus operating area, and turnaround.

Demonstrate compliance with the adopted IFC and BFFR access requirements, including:

- A minimum unobstructed apparatus access width of 20 feet and vertical clearance of 13 feet 6 inches, unless a specific alternative is approved by BFFR.
- An all-weather driving surface capable of supporting responding fire apparatus. Identify the pavement or compacted aggregate section and any load-bearing shoulders included in the usable width.
- Roadway grades, turning radii, and approach and departure angles suitable for BFFR apparatus.
- An approved turnaround for dead-end fire apparatus access exceeding 150 feet, in accordance with IFC 503.2.5. Show its dimensions and any necessary easement.
- Access to the proposed structure consistent with IFC 503.1.1.

The reported 5.5-percent grade describes part of the existing access. Provide sufficient information to verify the entire proposed route. Identify any requested alternative separately for BFFR review and written approval.

2. CWRC classification and construction materials

The submitted wildfire assessment provides useful vegetation and hazard information but does not establish compliance with the Colorado Wildfire Resiliency Code.

Identify the applicable official CWRC fire-intensity classification or provide an approved site-specific determination under CWRC Section 304. The CSFS risk classifications used in the report shall not be substituted for the applicable CWRC classification.

For the proposed new residence, submit construction details and product documentation demonstrating compliance with the applicable provisions of CWRC Chapter 4, including:

- Class A roof assembly and required roof-edge, valley, and roof-to-wall details.
- Compliant gutters, downspouts, and protection against debris accumulation.
- Approved ember-resistant vent assemblies.
- Compliant exterior wall coverings, eaves, soffits, and projections.
- Compliant exterior windows, glazing, and doors.
- Compliant decks, walking surfaces, supports, and under-deck protection where proposed.

Identify the actual proposed materials and assemblies during building-permit review. Where fire-retardant-treated wood, coatings, or alternative materials are proposed, provide applicable testing, listing or evaluation documentation, installation instructions, and exterior-exposure limitations for BFFR review before installation.

3. Defensible space and building location

Supplement the wildfire plan with a site-specific exhibit showing the proposed building area, required defensible-space treatments, and vegetation clearance along the apparatus access route.

Coordinate these requirements with the no-build area already shown on LS1.0 and the site’s slope and environmental constraints. Demonstrate that the residence, compliant access, turnaround, and required mitigation can be accommodated within the proposed lot.

The new residence requires applicable BFFR CWRC documentation, an initial education and planning inspection, and a final inspection before Certificate of Occupancy processing.

4. Scope and coordinated resubmittal**

The current proposal adds one residence. BFFR is not requiring an additional firefighting water supply for this application. Any later proposal adding two more residences shall be referred to BFFR for review of the resulting water-supply requirements.

Correct the parcel identification in the Fire Protection Report and wildfire-related reports to match parcel 6214000071. Show the existing address, 11525 Howells Road, and the assigned Lot 2 address, 11505 Howells Road, consistently.
11/10/2026 8:01:17 PM
View PCD Engineering Division
11/10/2026 7:18:13 AM
1 Soils and Geology Report comments (Full comments from Planning and Development Service Engineering) 11/10/2026 7:18:13 AM
View PCD Engineering Division
11/10/2026 7:20:59 AM
1 Final Plat comments (Full comments from Planning, Stormwater Engineering and Development Service Engineering) 11/10/2026 7:20:59 AM
View PCD Engineering Division
11/10/2026 7:10:13 AM
1 Final Drainage Report comments (Full comments from Stormwater Engineering and Development Service Engineering) 11/10/2026 7:10:13 AM
View PCD Engineering Division
11/10/2026 7:15:43 AM
1 Closures Sheet comments 11/10/2026 7:15:43 AM
View PCD Project Manager
11/6/2026 1:07:31 PM
1 Letter of intent comments 11/6/2026 1:07:31 PM
View PCD Project Manager
11/6/2026 8:57:37 AM
1 Wildland Fire & Hazard Mitigation Plan_plus Summary 11/6/2026 8:57:37 AM
View PCD Project Manager
11/6/2026 8:57:12 AM
1 Letter of intent summary 11/6/2026 8:57:12 AM
View PCD Project Manager
11/6/2026 8:56:48 AM
1 Soils & Geology Report_plus Summary 11/6/2026 8:56:48 AM
View PCD Project Manager
11/6/2026 8:56:06 AM
1 PBMP Applicability Form comments 11/6/2026 8:56:06 AM
View PCD Project Manager
11/6/2026 8:42:19 AM
1 OWTS Report_plus Summary 11/6/2026 8:42:19 AM
View PCD Project Manager
11/6/2026 8:41:59 AM
1 Fire Protection Report_plus Summary 11/6/2026 8:41:59 AM
View PCD Project Manager
11/6/2026 8:41:02 AM
1 Final Plat Drawings_plus summary 11/6/2026 8:41:02 AM
View PCD Project Manager
11/6/2026 8:40:42 AM
1 Drainage Report comments 11/6/2026 8:40:42 AM
PCD Project Manager
11/6/2026 8:42:36 AM
1 Planning has reviewed the proposal and has comments on the following documents, which are uploaded as PDSs. These PDFs include a markup summary of all comments, at the end of each document.
- Letter of intent
- Final Plat drawings
- OWTS report
- Fire protection report
- Soils and geology report
- Wildland Fire Hazard Mitigation Plan (please note this is not a required document from Planning, but may be requested by the Fire District)

In addition, Stormwater Engineering comments are uploaded here on the following documents:
- Drainage Report
- Final Plat Drawings
- PCM Applicability Form

Lastly, please note that the Engineering Department has not completed their review, and will submit additional comments on Monday 11/9.


Jen Uhler
PCD Planner
719-520-7952
jenuhler@elpasoco.com
11/6/2026 8:42:36 AM
Pikes Peak Regional Building Department
11/5/2026 1:29:47 PM
1 1. The address for lot 2 is 11505 Howells Rd. Please add this address to the plat as well as the existing address.
2. General Final plat comments apply. Plat fee will be $10.00 for the new address
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.
c. Pre-plat reviews need to be performed in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. For an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org


Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
11/5/2026 1:29:47 PM
PCD Engineering Division
11/10/2026 7:20:14 AM
1 Review 1.

Engineering comments on the following documents:
- Letter of intent (Full comments uploaded by PCD previously)
- Closure Sheets (Full comments)
- Final Plat Drawing (Full comments)
- Final Drainage Report (Full comments)
- Soils and Geology Report (Full comments)

*** Applicant Note - Please see comments uploaded on today's date with full comments from Planning, Stormwater Engineering and Development Services Engineering. All other documents previously uploaded contain all V1 comments ***

Joe Sandstrom, EIT, CFM
Associate Engineer
Department of Public Works
O: 719-520-6314
M: 719-505-0516
josephsandstrom@elpasoco.com
11/10/2026 7:20:14 AM
View Colorado Geological Survey
11/4/2026 8:32:53 PM
1 11/4/2026 8:32:53 PM
Black Hills Energy-Aquila
11/4/2026 10:54:45 AM
1 BHE will serve. Second parcel may require a main extension for gas service. Please call in locates before any excavation. 11/4/2026 10:54:45 AM
View Colorado Parks and Wildlife
11/3/2026 2:10:54 PM
1 11/3/2026 2:10:54 PM
County Attorney - Development Review
11/3/2026 11:33:01 AM
1 No comments from County Attorney - Development Review at this time.

Reviewed by: Erika Keech, Sr. County Attorney.
11/3/2026 11:33:01 AM
County Attorney - Water
11/3/2026 10:27:45 AM
1 County Attorney’s Office can begin review once 26CW3022 has been uploaded and a letter showing sufficient water has been received by the Colorado Division of Water (SEO). Please note, if no other uses are listed on the Water Supply Information Summary or within the Water Resources report (ex. Irrigation, stock watering..) those uses will be strictly prohibited. 11/3/2026 10:27:45 AM
View Mountain View Electric Association, Inc.
11/3/2026 8:47:31 AM
1 See attached Comment Letter 11/3/2026 8:47:31 AM
EPC Stormwater Review
11/2/2026 5:28:19 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- Final Plat Drawings
- PCM Applicability Form

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/2/2026 5:28:19 PM
Black Forest Land Use Committee
11/2/2026 1:24:32 PM
1 The Black Forest Land Use Committee has already provided input opposing this proposal because we feel it is not right to replat a parcel that has already been platted. The purpose in our opposition is to protect the rights of adjoining residents who bought into the development with the understanding that the 5-acre lots were to be permanent. This approach to further subdividing has been used before, once approved and once denied, so I believe that some form of permanent policy needs to be set for future proposals like this. We already know if two such proposals that are in the planning stages. 11/2/2026 1:24:32 PM
EPC Sheriff's Department
10/30/2026 5:32:46 PM
1 As the agency having jurisdiction is Black Forest Fire Rescue Protection District, EPSO defers all fire comments to BFFR 10/30/2026 5:32:46 PM
View EPC Parks Department
11/13/2026 3:28:45 PM
1 El Paso County Parks staff has reviewed the final plat application and has attached the comments packet.

Thank you.

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
11/13/2026 3:28:45 PM
911 Authority - El Paso/Teller County
10/20/2026 7:21:21 AM
1 No action for E911 on this submittal.
Thank you.
Justin.
10/20/2026 7:21:21 AM
View EPC Environmental Services
10/16/2026 12:20:26 PM
1 10/16/2026 12:20:26 PM