Project Review Comments

Back to List


Project Name
Grandwood Ranch Final
Description
Location
Parcels
6119000003 6119000003
Applicant
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
File Number
ASB251
Project Manager
Stormwater Glenn Reese
Status
Active
Created
1/13/2025 3:05:00 PM

View: Project Documents



Review Comments (14)

Link Agency Comment
EPC DPW Asset Management
7/14/2025 9:57:43 AM
CAD files in correct Colorado state plane coordinates. 7/14/2025 9:57:43 AM
PCD Engineering Inspections
7/9/2025 1:12:45 PM
No Comments form Inspections 7/9/2025 1:12:45 PM
View PCD Engineering Division
7/8/2025 11:53:39 AM
As-Built Drawings comments (signing sheets) 7/8/2025 11:53:39 AM
PCD Engineering Division
7/8/2025 11:50:57 AM
Development Services Engineering has comments on the signing sheets of the As-Built Drawings (see uploaded file). Feel free to contact me if you have any questions.

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
7/8/2025 11:50:57 AM
View EPC Stormwater Review
6/25/2025 4:51:46 PM
PCM Certification Letter 6/25/2025 4:51:46 PM
View EPC Stormwater Review
6/25/2025 4:51:31 PM
Engineering Record Drawings (As-Builts) 6/25/2025 4:51:31 PM
EPC Stormwater Review
6/25/2025 4:51:18 PM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Engineering Record Drawings (As-Builts)
- PCM Certification Letter

Just a couple remaining minor comments, almost there!

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
6/25/2025 4:51:18 PM
View EPC Stormwater Review
6/4/2025 11:36:27 AM
PCM Certification Letter 6/4/2025 11:36:27 AM
View EPC Stormwater Review
6/4/2025 11:36:13 AM
Engineering Record Drawings (As-Builts) 6/4/2025 11:36:13 AM
EPC Stormwater Review
6/4/2025 11:35:53 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Engineering Record Drawings (As-Builts)
- PCM Certification Letter

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
6/4/2025 11:35:53 AM
View EPC Stormwater Review
4/3/2025 1:46:42 PM
PCM Certification Letter 4/3/2025 1:46:42 PM
View EPC Stormwater Review
4/3/2025 1:46:27 PM
Engineering Record Drawings (As-Builts) 4/3/2025 1:46:27 PM
PCD Engineering Inspections
3/13/2025 2:27:55 PM
No comments form Inspections.
Brad Walters
Inspections Supervisor
3/13/2025 2:27:55 PM
EPC Stormwater Review
4/3/2025 1:46:06 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Engineering Record Drawings (As-Builts)
- PCM Certification Letter

Note that CAD files must show all public improvements and final plat linework with at least wo survey reference points to allow the County to move, fit, and rotate the project file to the survey coordinate system used by El Paso County.

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
4/3/2025 1:46:06 PM