Project Review Comments
- Project Name
- Citizen on Constitution Final Plat
- Description
- Plat for a multi-family development includes Public ROW Akers and Detention Tracts. $543,982 Credits used for Traffic Fee Program at Final plat - none due at Site Development Plan
- Location
- Parcels
- 5405000035 5405000035 5405000051 5405000051 5405104074 5405104074 5405104075 5405104075
- Applicant
-
Kimley-Horn
Mitchell Hess ( Mitchell.Hess@kimley-horn.com ) Mitchell Hess ( Mitchell.Hess@kimley-horn.com ) - File Number
- ASB2443
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 11/6/2024 8:30:25 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
8/12/2025 1:38:06 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s): - Engineer Record Drawings - Pond Certification Letter EPC DPW Stormwater has no further comments. Once other reviewer’s comments have also been resolved, this ASB review process will be deemed complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Please finalize all other PA Punchlist items (SW punchlist is now complete, but check on the DS punchlist). Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
8/12/2025 1:38:06 PM | |
EPC DPW Asset Management
8/11/2025 7:43:04 AM |
Please let us know what coordinate system PT-GROUND points are in. If this is a site-specific coordinate system, please convert dwg into Colorado State Plane Central coordinates. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
8/11/2025 7:43:04 AM | |
View |
EPC Stormwater Review
1/27/2025 12:22:43 PM |
- Pond Certification Letter (and included as-built sheet) | 1/27/2025 12:22:43 PM |
EPC Stormwater Review
1/27/2025 12:22:23 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Pond Certification Letter (and included as-built sheet) Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
1/27/2025 12:22:23 PM | |
PCD Engineering Division
1/13/2025 9:10:06 AM |
Please resubmit the entire construction drawing set with all changes redlined. It should include the crosspan on Akers and Constitution. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
1/13/2025 9:10:06 AM | |
PCD Engineering Inspections
1/13/2025 9:07:23 AM |
Please provide a full set of as builts including the public improvements to Akers Dr. and a road certification letter. Brad Walters Inspections Supervisor Department of Public Works 719.520.6819 |
1/13/2025 9:07:23 AM |