Project Review Comments

Back to List


File Number
MP245
Project Name
South Powers Extension: Corridor Preservation Study MP
Applicant
El Paso County Public Works
Victoria Chavez ( victoriachavez@elpasoco.com ) Victoria Chavez ( victoriachavez@elpasoco.com )
File Number
MP245
Project Manager
Justin Kilgore
Status
Active
Created
10/5/2024 9:27:57 AM

View: Project Documents | Submit/View Public Comment



Review Comments (17)

Link Agency Review # Comment
Mountain View Electric Association, Inc.
7/20/2026 3:02:37 PM
1 MVEA has existing facilities in this area and will work with you on the design. 7/20/2026 3:02:37 PM
EPC Parks Department
7/15/2026 11:59:57 AM
1 El Paso County Parks Department. EPC Parks staff has reviewed the SPECPSMP and is pleased with the inclusion of multi-modal transportation options in the two selected alignments' cross-sections, as well as the well-planned alignments that allow for critical trail connections in the future. The eventual construction of the South Powers Primary Regional Trail on either side of the extension will fulfill the 2022 El Paso County Parks Master Plan & Trail Master Plan goal of connecting the Fountain Creek Regional Trail and Clear Spring Ranch Open Space to those communities located in the Fountain Valley or southeast Colorado Springs. With the eventual connection of the Kane Ranch Regional Trail to the South Powers Regional Trail, trail users will be able to access Kane Ranch Open Space via multi-modal transportation options. Thank you for the opportunity to not only take part in the planning of this critical transportation corridor, but also in the review of the most-worth outcomes. 7/15/2026 11:59:57 AM
Upper Black Squirrel Creek GWMD
7/1/2026 3:13:57 PM
1 The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. 7/1/2026 3:13:57 PM
PCD Administrative Notice
6/30/2026 10:10:22 AM
1 No neighbor notices required. 6/30/2026 10:10:22 AM
Colorado Springs Planning & Community Development
6/30/2026 9:46:55 AM
1 The City of Colorado Springs Planning Department does not have any comments or concerns related to this project.

Thank you,
6/30/2026 9:46:55 AM
USAFA Base Planner
6/26/2026 12:55:30 PM
1 The United States Air Force Academy (USAFA) has received the South Powers Extension Corridor Preservation Study (MP245) review request. As the study area lies a sufficient distance from Academy property, USAFA has no further comments at this time. 6/26/2026 12:55:30 PM
Colorado Springs Public Works
6/25/2026 1:09:53 PM
1 Please submit all future concept plans and development plans of the Powers Blvd. extension for City review. Thank you.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
6/25/2026 1:09:53 PM
Peterson AFB
6/24/2026 3:52:52 PM
1 Thank you for notifying Peterson Space Force Base (SFB) of the proposed South Powers Extension: Corridor Preservation Study MP and providing the opportunity to review the project. Peterson SFB has no comments at this time. 6/24/2026 3:52:52 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/24/2026 9:59:36 AM
1 Colorado Springs Utilities - Utility Development Services has no comments to provide on this application. Additional comments form other CSU departments may be provided. PSD 6/24/2026 9:59:36 AM
Colorado Springs Fire Department
6/18/2026 7:09:01 AM
1 No comments. 6/18/2026 7:09:01 AM
Hanover Fire Protection District
6/16/2026 1:56:24 PM
1 Addition:

Hanover Fire Protection District appreciates the opportunity to review this project and recognizes the potential transportation, mobility, and regional connectivity benefits the South Powers Extension may provide. As the project moves forward, the District would welcome continued participation in discussions regarding access control features, roadway modifications, interchange locations, utility corridor coordination, and traffic management measures that may affect emergency response operations within the Hanover area.

The District requests that future planning and design efforts consider:

• Emergency vehicle access and response routes to existing residences, businesses, critical infrastructure, and future development areas within the corridor.

• The cumulative effects of transportation improvements and associated utility infrastructure on emergency response capabilities, responder safety, and access to incidents throughout the Hanover response area.

• Potential impacts to local roadways utilized by emergency responders, including Hanover Road, Old Pueblo Road, Birdsall Road, Squirrel Creek Road, and other transportation routes that may serve as primary or secondary response corridors.

• Stormwater, drainage, and erosion impacts that could affect roadway resiliency and emergency access during significant weather events. The District has observed flooding, roadway damage, and erosion within portions of this area and encourages consideration of measures that maintain reliable emergency access during and after major storm events.

• Coordination regarding future crossings, interchanges, utility corridors, and access modifications to ensure emergency response agencies maintain effective access throughout all phases of project development and construction.

Hanover Fire Protection District supports continued interagency coordination and believes early consideration of emergency response needs will help ensure the long-term safety, resiliency, and functionality of the transportation network serving this area.

The District looks forward to continued collaboration as the project advances.
6/16/2026 1:56:24 PM
County Attorney - Development Review
6/15/2026 2:34:04 PM
1 No Comments from County Attorney – Development Review at this time.

Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
6/15/2026 2:34:04 PM
Hanover Fire Protection District
6/9/2026 10:58:25 AM
1 Hanover Fire Protection District appreciates the opportunity to review this project and recognizes the potential benefits the proposed roadway improvements may provide to our community. As the project moves forward, the District would welcome the opportunity to participate in discussions regarding any access control features, roadway modifications, or traffic management measures located near District facilities. Because these elements can influence emergency vehicle access and response routes, coordination during planning and design may help identify opportunities to support both transportation objectives and effective emergency response operations.

The District looks forward to continued collaboration as the project advances.
6/9/2026 10:58:25 AM
Colorado Springs Public Works
6/9/2026 8:02:29 AM
1 Why is there not a proposed interchange at Marksheffel Road/C&S Road? Although the intersection is spaced one mile from both Squirrel Creek Road and Mesa Ridge Parkway.


Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
6/9/2026 8:02:29 AM
Schriever AFB
6/8/2026 2:57:51 PM
1 No comments. 6/8/2026 2:57:51 PM
911 Authority - El Paso/Teller County
6/8/2026 1:53:15 PM
1 No action for E911 on this submittal.
Thank you
Justin
6/8/2026 1:53:15 PM
RBD Floodplain
6/8/2026 7:54:01 AM
1 According to the Planning and Environmental Linkages Study,
"The floodplain evaluation would be completed during the conceptual design of any proposed project. "

Please coordinate local permitting with Keith Curtis Floodplain Administrator ;
Keith Curtis, PE, CFM, LEED AP
Floodplain Administrator
Pikes Peak Regional Building Department
2880 International Circle
Colorado Springs CO, 80910
O: 719-327-2898 E: keith@pprbd.org W: pprbd.org
6/8/2026 7:54:01 AM