Project Review Comments

Back to List


Project Name
Gleneagle View - Northgate Auto Dealership SDP
Description
replatting multiple tracts into lots
Location
Parcels
6206306003 6206306003 6206306005 6206306005 7201402022 7201402022
Applicant
N.E.S. Inc.
Kim Johnson ( kjohnson@nescolorado.com )
(719) 471-0073
Kim Johnson ( kjohnson@nescolorado.com )
(719) 471-0073
EA Number
EA2496
File Number
PPR2514
Project Manager
Ashlyn Mathy
Status
Active
Created
9/3/2024 8:56:53 AM

View: Project Documents



Review Comments (32)

Link Agency Comment
USAFA Base Planner
4/25/2025 3:31:37 PM
Thank you for sending the United States Air Force Academy (USAFA) the review for Gleneagle View – Northgate Auto Dealership (File #: PPR2514). USAFA has questions about the adequacy of the drainage solution for this development. We would like to see calculation that the area set aside for the Extended Detention Basin (EDB) will be able to hold the amount of stormwater that will be generated from that area PLUS cumulative runoff from the existing developments until the EDB can connect to the County’s North Gate Detention Pond. Also, if that is the intent, the drainage report should also state that the outflow from the pond will ultimately be conveyed to the County’s Pond. Finally, we cannot clearly discern which creek the stormwater in the existing extended detention pond will transport to, and if the discharge will run along North Gate Boulevard. This has been an issue in the past since the runoff on North Gate runs westerly toward our gate and often carries a sediment load that then places a mitigation burden on us. 4/25/2025 3:31:37 PM
Donala Water and San Dist
4/23/2025 11:27:48 AM
Location and details for a backflow preventer to prevent cross-contamination between the private
water system and the District water system.
4/23/2025 11:27:48 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/18/2025 3:57:43 PM
Please address comments on elevation sheet and comments for utility plan:
Action Item: Call out horizontal separation of gas service line and building to ensure compliance.
Action Item: Call out horizontal 6' separation of gas service line and water main to ensure compliance.
Action Item: Add note “CSU Field Engineer to determine final gas meter and service line locations. Contact Field Engineering at 719-668-4985 (Gas) with any questions.”
4/18/2025 3:57:43 PM
County Attorney - Development Review
4/17/2025 5:30:48 PM
The Detention Maintenance Agreement will be reviewed in connection with the final plat.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
4/17/2025 5:30:48 PM
View EPC Stormwater Review
4/15/2025 2:37:50 PM
SWMP Checklist 4/15/2025 2:37:50 PM
View EPC Stormwater Review
4/15/2025 2:37:25 PM
SWMP 4/15/2025 2:37:25 PM
View EPC Stormwater Review
4/15/2025 2:37:00 PM
PCM Applicability Form 4/15/2025 2:37:00 PM
View EPC Stormwater Review
4/15/2025 2:36:38 PM
GEC Checklist 4/15/2025 2:36:38 PM
View EPC Stormwater Review
4/15/2025 2:35:57 PM
FAE 4/15/2025 2:35:57 PM
View EPC Stormwater Review
4/15/2025 2:35:27 PM
ESQCP 4/15/2025 2:35:27 PM
View EPC Stormwater Review
4/15/2025 2:34:28 PM
Drainage Report 4/15/2025 2:34:28 PM
View EPC Stormwater Review
4/15/2025 2:34:09 PM
CDs 4/15/2025 2:34:09 PM
View Colorado Department of Transportation - Pueblo Office
4/15/2025 1:38:16 PM
Please see the attached letter for CDOT's comments. Hydraulics & environmental comments need to be addressed. 4/15/2025 1:38:16 PM
View EPC Stormwater Review
4/15/2025 11:18:34 AM
Utility Plans (uploaded for DS Engineering) 4/15/2025 11:18:34 AM
View PCD Project Manager
4/15/2025 9:42:31 AM
v1_Sign Plan comments 4/15/2025 9:42:31 AM
View PCD Project Manager
4/15/2025 9:25:09 AM
v1_Site Development Plan comments 4/15/2025 9:25:09 AM
View PCD Project Manager
4/15/2025 9:24:41 AM
v1_Lighting Plan comments 4/15/2025 9:24:41 AM
View PCD Project Manager
4/15/2025 9:17:42 AM
v1_Letter of Intent minor comments 4/15/2025 9:17:42 AM
View PCD Project Manager
4/15/2025 9:14:36 AM
v1_Landscape Plan drawings comments 4/15/2025 9:14:36 AM
View PCD Project Manager
4/15/2025 9:14:12 AM
v1_Floor Plans comments 4/15/2025 9:14:12 AM
View PCD Project Manager
4/15/2025 9:13:40 AM
v1_Elevation Plans comments 4/15/2025 9:13:40 AM
PCD Project Manager
4/15/2025 9:12:56 AM
Due to volume and complexity of comments, a subsequent reviews may have additional comments and requested revisions.

The Site Development Plan project cannot be approved until the final plat, SF2510 must be approved first. Due to similar documents across the SDP and plat, the subsequent reviews for the plat and SDP will be on the same timelines to ensure staff can review projects concurrently.

-Ashlyn Mathy
4/15/2025 9:12:56 AM
View PCD Engineering Division
4/14/2025 5:13:45 PM
Deviation_V1 4/14/2025 5:13:45 PM
View PCD Engineering Division
4/14/2025 5:13:18 PM
TIS_V1 4/14/2025 5:13:18 PM
View Mountain View Electric Association, Inc.
4/14/2025 1:26:50 PM
See attached comment 4/14/2025 1:26:50 PM
Pikes Peak Regional Building Department
4/14/2025 12:36:54 PM
Final Plat comments included.

DP
1. Each separate group of hail net/canopies will be assigned the address of the lot along with a letter to designate a separate address. When submitting plans for the new auto dealership, please submit under 208 Gleneagle Gate View. The hail canopies should use 309 Gleneagle Gate Vw with letter designations.
2. The carwash building will be 204 Gleneagle Gate Vw.
3. Please contact Enumerations prior to plan submittal to receive addressing layout. This will be required when submitting plans for permit.
4. Will the equipment shed at 13502 Struthers Road be removed?
5. Irrigation address 122 North Gate Blvd is active

FP

Lot 1 to use existing tract address 309 Gleneage Gate Vw, Lot 2 to use existing tract address 208 Gleneagle Gate View. Lot 3 to use existing tract address 249 Gleneagle Gate Vw. Please add the address numbers (XXX) to the plat on the correct lot as close to the named street as possible.

Standard Final Plat comments apply:
1. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
2. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). All addresses are existing, no plat fee required.
3. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
4. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org




Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
4/14/2025 12:36:54 PM
EPC Stormwater Review
4/15/2025 2:33:49 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs
- Drainage Report
- ESQCP
- FAE
- GEC Checklist
- PCM Applicability Form
- Site Development Plan............(to be uploaded by the planner)
- SWMP
- SWMP Checklist

Note: The GEC Plan is contained in the CDs so all comments have been made there. You don't need to resubmit the GEC Plan in its own slot since it is contained within the CDs.

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
4/15/2025 2:33:49 PM
PCD Engineering Division
4/14/2025 2:55:06 PM
Engineering Review Ver.1

Please see engineering review comments on the following documents

SDP_V1
FAE_V1
CDs_V1
FDR_V1
TIS_V1
ESQCP_V1
Utility Plans_V1
GEC Plans_V1 Note these are included in the CDs plan set so all comments made on the CD set.
Deviation_V1 See comments

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
4/14/2025 2:55:06 PM
View Tri-Lakes-Monument Fire Protection District
4/4/2025 11:36:54 AM
FD Site Plan Review 4/4/2025 11:36:54 AM
Colorado Springs Public Works
4/4/2025 9:14:50 AM
Engineering Development Review has no comments on this item.

Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
4/4/2025 9:14:50 AM
Colorado Springs Public Works
4/1/2025 9:50:28 AM
Include in the TIS the westbound left turn & northbound movements at North Gate Boulevard and Struthers Road intersection.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
4/1/2025 9:50:28 AM
Academy SD 20 Building Fund
4/1/2025 7:06:43 AM
Academy District 20 is in receipt of File #PPR2514 for approval of the Gleneagle View - Northgate Auto Dealership SDP.

The District has no comment regarding this request.

If you need additional information, please contact me.

Don Smith
Planning Consultant
4/1/2025 7:06:43 AM