Project Review Comments
- Project Name
- Winsome Commercial Lot Rezone to Residential
- Description
- Rezone of one lot from CC to RR-2.5. Property is approx. 7.2 acres.
- Location
- Parcels
- 4119007001 4119007001
- Applicant
-
ProTerra Properties
Mr. Joe Desjardin ( jdesjardin@proterraco.com )
(719) 476-0800 Mr. Joe Desjardin ( jdesjardin@proterraco.com )
(719) 476-0800 - File Number
- P2410
- Project Manager
- Lisa Elgin
- Status
- Active
- Created
- 8/2/2024 1:33:06 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
10/23/2024 12:58:56 PM |
Engineering Review 2: All engineering comments have been addressed. The Traffic memo has been routed for acceptance by the ECM administrator and then will be uploaded into EDARP. Reviewed by: Joe Sandstrom josephsandstrom@elpasoco.com (719) 520 6314 |
10/23/2024 12:58:56 PM | |
View |
EPC Health Department
10/20/2024 8:19:20 PM |
10/20/2024 8:19:20 PM | |
PCD Project Manager
10/17/2024 11:44:02 AM |
No further comments. | 10/17/2024 11:44:02 AM | |
View |
PCD Project Manager
10/8/2024 8:20:30 AM |
10/8/2024 8:20:30 AM | |
View |
PCD Project Manager
10/8/2024 8:14:41 AM |
See comments on Zoning Map | 10/8/2024 8:14:41 AM |
View |
PCD Project Manager
10/8/2024 8:13:37 AM |
See comments of Mineral Rights Certification | 10/8/2024 8:13:37 AM |
View |
PCD Project Manager
10/8/2024 8:11:49 AM |
See comments on Letter of Intent | 10/8/2024 8:11:49 AM |
EPC Stormwater Review
10/3/2024 7:37:50 AM |
Review 1: EPC DPW Stormwater has no further comments. No soil disturbance is proposed with this rezone application. Planner: no re-review necessary. Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
10/3/2024 7:37:50 AM | |
View |
Falcon Fire Protection District
10/1/2024 7:48:00 AM |
10/1/2024 7:48:00 AM | |
PCD Engineering Division
9/30/2024 5:07:59 PM |
Engineering Review 1: Engineering comments have been made in blue on the following documents (to be uploaded by planning): - Traffic Memo Note to planning: Engineering comments are minor and a shorter review period for the 2nd review would be acceptable for engineering. Reviewed by: Joe Sandstrom Email: josephsandstrom@elpasoco.com Office: (719) 520-6314 |
9/30/2024 5:07:59 PM | |
Parks Advisory Board
9/26/2024 10:06:29 AM |
El Paso County Parks and Community Services Department. The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space, and therefore has no objections to the rezoning application. Upon review of the forthcoming preliminary plans and final plats, regional park fees will be calculated and collected upon recording of the final plat(s). Previously reviewed and approved McCune Ranch / Winsome preliminary plans and final plats have only required regional park fees in lieu of land dedication, and the situation remains the same for this/these proposed residential lot(s). Park Advisory Board endorsement is not necessary for rezoning applications. Thank you! | 9/26/2024 10:06:29 AM | |
Pikes Peak Regional Building Department
9/26/2024 7:33:28 AM |
Enumerations has no comment regarding the rezone aspect of this project. Becky Allen PPRBD - Enumerations 719-799-2707 |
9/26/2024 7:33:28 AM | |
View |
Colorado State Forest Service
9/25/2024 8:10:47 AM |
The Colorado State Forest Service recommends that all forested acres be mitigated to reduce the risk of wildfire and that defensible space be created for each dwelling using the standards in the CSFS "Home Ignition Zone Guide" (formerly known as "Quick Guide FIRE 2012-1: Protecting Your Home From Wildfire") located on the Colorado State Forest Service website. https://csfs.colostate.edu/media/sites/22/2021/04/2021_CSFS_HIZGuide_Web.pdf In addition, we recommend that all wildfire mitigation be completed before or during dwelling construction. |
9/25/2024 8:10:47 AM |
Falcon School District 49
9/24/2024 12:01:55 PM |
District 49 has reviewed File P2410 - Rezone one lot from CC to RR-2.5. District 49 has no concerns with the proposed rezoning of this property, we trust the fees in lieu of land will be adhered to. | 9/24/2024 12:01:55 PM | |
EPC Parks Department
9/18/2024 3:17:08 PM |
El Paso County Parks and Community Services Department. The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space, and therefore has no objections to the rezoning application. Upon review of the forthcoming preliminary plans and final plats, regional park fees will be calculated and collected upon recording of the final plat(s). Previously reviewed and approved McCune Ranch / Winsome preliminary plans and final plats have only required regional park fees in lieu of land dedication, and the situation remains the same for this/these proposed residential lot(s). Thank you! | 9/18/2024 3:17:08 PM | |
911 Authority - El Paso/Teller County
9/17/2024 1:15:15 PM |
No action for E911 on this submittal. Thank you. Justin |
9/17/2024 1:15:15 PM | |
View |
EPC Environmental Services
9/17/2024 12:11:01 PM |
9/17/2024 12:11:01 PM | |
Colorado Department of Transportation - Pueblo Office
9/16/2024 8:54:03 AM |
CDOT has no comments regarding this development. | 9/16/2024 8:54:03 AM | |
Mountain View Electric Association, Inc.
9/16/2024 7:50:49 AM |
MVEA has no objection to the proposed rezone | 9/16/2024 7:50:49 AM |