Project Review Comments
- Project Name
- McDonald's Villages at Lorson Ranch Site Development Plan
- Description
- Location
- Parcels
- 5515413054 5515413054
- Applicant
-
Kimley-Horn and Associates, Inc.
Grant Petik ( Grant.Petik@kimley-horn.com )
(719) 284-7276 Grant Petik ( Grant.Petik@kimley-horn.com )
(719) 284-7276 - EA Number
- EA2467
- File Number
- PPR2427
- Project Manager
- Scott Weeks
- Status
- Active
- Created
- 7/25/2024 3:59:14 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Health Department
10/13/2024 12:25:00 PM |
10/13/2024 12:25:00 PM | |
PCD Engineering Division
9/25/2024 5:09:31 PM |
EPC Engineering We have comments on the following submittal documents: - Drainage Report - Financial Assurance Estimate - Utility Plan - Grading Erosion Control Plan Please reach out if you need any clarification. Ethan Jacobs ethanjacobs@elpasoco.com 719.520.6876 Charlene Durham CharleneDurham@elpasoco.com 719.520.7951 |
9/25/2024 5:09:31 PM | |
View |
PCD Project Manager
9/23/2024 3:59:37 PM |
9/23/2024 3:59:37 PM | |
View |
PCD Project Manager
9/23/2024 3:59:20 PM |
Please see planning comments to the following documents: - Site Development Plan - Sign Plan |
9/23/2024 3:59:20 PM |
County Attorney - Development Review
9/23/2024 3:57:41 PM |
No comments from County Attorney – Development Review at this time. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013. |
9/23/2024 3:57:41 PM | |
View |
Mountain View Electric Association, Inc.
9/23/2024 11:57:02 AM |
See attached comments | 9/23/2024 11:57:02 AM |
View |
EPC Stormwater Review
9/23/2024 11:43:39 AM |
SWMP | 9/23/2024 11:43:39 AM |
View |
EPC Stormwater Review
9/23/2024 11:42:45 AM |
PBMP Applicability Form | 9/23/2024 11:42:45 AM |
View |
EPC Stormwater Review
9/23/2024 11:40:58 AM |
GEC Checklist | 9/23/2024 11:40:58 AM |
View |
EPC Stormwater Review
9/23/2024 11:38:54 AM |
ESQCP | 9/23/2024 11:38:54 AM |
EPC Stormwater Review
9/23/2024 11:32:31 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP - GEC Plan...........(to be uploaded with Development Services comments) - GEC Checklist - PBMP Applicability Form - SWMP Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
9/23/2024 11:32:31 AM | |
Colorado Geological Survey
9/23/2024 9:45:54 AM |
This Site Development Plan includes the development of Lot 2 of the Village at Lorson Ranch Filing 1 development to include a McDonald’s building. With this referral, CGS received a Site Development Plan (Kimley Horn and Associates, Inc., July 30, 2024); Construction Documents (Kimley Horn, July 30, 2024); Final Drainage Study (Kimley Horn, July 30, 2024); Letter of Intent (Kimley Horn, Undated); and Geotechnical Engineering Report (Universal Engineering Sciences (UES), August 18, 2023). The site is outside the mapped floodplain of Jimmy Camp Creek and is not exposed to any geologic hazards that preclude the proposed development. CGS agrees with UES (page 4) that “The upper 4 to 5 feet of the encountered soils were very soft and were not considered suitable for direct support of typical shallow foundations in their present condition,” and with their recommendation, “This soil would need to be removed and replaced with properly placed and compacted structural fill or be subjected to some ground stabilization or modification.” Provided that UES’s recommendations are adhered to, CGS has no objection to the approval of the Site Development Plan. Submitted 9/23/2024 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu) … |
9/23/2024 9:45:54 AM | |
View |
Widefield SD 3
9/18/2024 3:58:16 PM |
9/18/2024 3:58:16 PM | |
EPC Parks Department
9/18/2024 10:48:24 AM |
El Paso County Parks and Community Services. The 2022 El Paso County Parks Master Plan shows this project impacting the proposed Crews Gulch Primary Regional Trail, which runs west-east along the north side of Fontaine Boulevard, commencing far to the southeast at its intersection with the Fountain Creek Regional Trail and terminating at its intersection with the Jimmy Camp Creek Regional Trail in the nearby Lorson Ranch development. A review of aerial photography, as well as a site inspection, and review of the Construction Documents and Landscape Plans showed a 6'-wide detached and meandering concrete sidewalk along the north side of Fontaine Boulevard at this location. This sidewalk will suffice for the location of the Crews Gulch Regional Trail and therefore, no trail easement is necessary for this section of trail which already allows for public multi-modal pedestrian access. As this is a commercial application, no regional park fees will be assessed, however an update to the EPC Land Development Code over the next year and half may or may not change this fee requirement. Thank you! | 9/18/2024 10:48:24 AM | |
Pikes Peak Regional Building Department
9/10/2024 10:55:20 AM |
1. Contact Enumerations for the layout prior to plan submittal with RBD. 2. In the title block of the first page of the developments plan the title block & below legal description of the parcel should read; The northeast quarter of the NORTHEAST quarter, not northwest. 3. On the El Paso County Assessor’s website there are still 3 buildings listed that you are not showing on site. Add these to the site plan or contact the Assessor’s get these structures removed (STORAGE WAREHOUSE, UTILITY BLDG & EQUIPMENT BLDG). Clarify which will be done. 4. How tall is the 2 proposed gates and fencing? If the fencing and gates exceeds 7’ , a separate address will need to be assigned along with a separate permit. Please clarify. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
9/10/2024 10:55:20 AM | |
911 Authority - El Paso/Teller County
9/10/2024 9:20:44 AM |
Comments for E911 as follows: The private dr indicated on the submitted Site Development Plan is a named roadway (Center Village Hts). This name needs to be depicted on the drawings for the final submitted plat. Thank you. Justin |
9/10/2024 9:20:44 AM | |
View |
El Paso County Conservation Dist
9/9/2024 2:30:00 PM |
Please see attached .PDF for brief comments. Thanks! | 9/9/2024 2:30:00 PM |