Project Review Comments

Back to List


Project Name
1185 N CURTIS RD - RV/Mixed Storage Park SDP
Description
RV/ Mixed Storage SDP. VA235 approved
Location
Parcels
4410000052 4410000052
Applicant
ANDRII VARKO
ANDRII VARKO ( andriivarko@gmail.com )
(786) 394-0094
ANDRII VARKO ( andriivarko@gmail.com )
(786) 394-0094
EA Number
2319
File Number
PPR2527
Project Manager
Maria Lancto
Status
Active
Created
7/25/2024 11:57:22 AM

View: Project Documents



Review Comments (24)

Link Agency Comment
View PCD Engineering Division
10/15/2025 4:21:00 PM
Landscape DRW_V1 10/15/2025 4:21:00 PM
View PCD Engineering Division
10/15/2025 4:19:17 PM
FDR_V1 10/15/2025 4:19:17 PM
View PCD Engineering Division
10/15/2025 4:18:31 PM
SDP_V1 10/15/2025 4:18:31 PM
View PCD Engineering Division
10/15/2025 4:17:41 PM
LOI_V1 10/15/2025 4:17:41 PM
View EPC Stormwater Review
10/15/2025 2:13:15 PM
SWMP Checklist 10/15/2025 2:13:15 PM
View EPC Stormwater Review
10/15/2025 2:12:58 PM
SWMP 10/15/2025 2:12:58 PM
View EPC Stormwater Review
10/15/2025 2:12:38 PM
SDI Form or MHFD Detention Calculations 10/15/2025 2:12:38 PM
View EPC Stormwater Review
10/15/2025 2:12:15 PM
PCM O&M Manual 10/15/2025 2:12:15 PM
View EPC Stormwater Review
10/15/2025 2:11:57 PM
PCM Applicability Form 10/15/2025 2:11:57 PM
View EPC Stormwater Review
10/15/2025 2:11:30 PM
Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure 10/15/2025 2:11:30 PM
View EPC Stormwater Review
10/15/2025 2:10:55 PM
GEC Plan 10/15/2025 2:10:55 PM
View EPC Stormwater Review
10/15/2025 2:10:34 PM
GEC Checklist 10/15/2025 2:10:34 PM
View EPC Stormwater Review
10/15/2025 2:10:12 PM
Geotech Report 10/15/2025 2:10:12 PM
View EPC Stormwater Review
10/15/2025 2:09:51 PM
ESQCP 10/15/2025 2:09:51 PM
View EPC Stormwater Review
10/15/2025 2:09:34 PM
Detention Maintenance Agreement 10/15/2025 2:09:34 PM
Pikes Peak Regional Building Department
10/15/2025 1:35:43 PM
1. Conexes do not require a building permit unless they are used for something other than unheated storage/stacked storage.
2. Fence is at 7’ and will not require a separate address or permit.
3. No further comment.

Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
10/15/2025 1:35:43 PM
View PCD Engineering Division
10/15/2025 9:55:53 AM
TIS_V1 10/15/2025 9:55:53 AM
View PCD Engineering Division
10/15/2025 9:49:37 AM
Driveway access permit 10/15/2025 9:49:37 AM
View PCD Engineering Division
10/14/2025 10:51:29 AM
Road Impact Fee Acknowledgement Form 10/14/2025 10:51:29 AM
PCD Engineering Division
10/15/2025 10:00:06 AM
Engineering Review Ver.1

Please see engineering review comments on the following documents.

LOI_V1
SDP_V1
FAE_V1
GEC Plan_V1
FDR_V1
ESQCP_V1
TIS_V1 Update Road Impact Fees per comments on SDP
SWMP/FAE_V1 See comments on the FAE. FAE to be submitted as a separate document on next submittal.
BESQCP is not submitted with a commercial SDP. Can remove
Complete Road Impact Fee Acknowledgement Form (attached)
As no building permits will be obtained from RBD Road Impact Fees must be paid at time of SDP approval.
Estimation of EPC RIF is $34,011.33 for 76,088sqft of outdoor storage at $447/1000sqft See SDP.
A commercial driveway access permit is required. Apply on EDARP. Instructions attached.
A work in the ROW permit will be required.

Due to the nature and volume of comments the next submittal will be treated as a first review and additional comments may be provided.

J. Saleh, PE, MBA
Senior Engineer
Department of Public Works
O: 719-520-7550
https://publicworks.elpasoco.com

and

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
10/15/2025 10:00:06 AM
EPC Stormwater Review
10/15/2025 2:22:43 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Detention Maintenance Agreement
- Drainage Report ...................................(to be uploaded by DS engineer)
- GEC Plan
- GEC Checklist
- Geotechnical Report
- Landscaping Plan..................................(to be uploaded by Project Manager)
- PCM Applicability Form
- PCM - MHFD Detention Calcs or SDI Form
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal)
- PCM O&M Manual
- SWMP
- SWMP Checklist

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Financial Assurance Estimate form (FAE)

Due to the volume or complexity of the comments provided, these comments are preliminary in nature and EPC DPW Stormwater reserves the right to make additional comments. Additional detailed comments will be provided upon receipt of complete information/plans and resolution of the major issues. A meeting with El Paso County planners and engineers is recommended before next submittal.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
10/15/2025 2:22:43 PM
Upper Black Squirrel Creek GWMD
10/8/2025 2:17:07 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. 10/8/2025 2:17:07 PM
View Mountain View Electric Association, Inc.
10/8/2025 1:04:22 PM
See attached comment letter 10/8/2025 1:04:22 PM
View EPC Environmental Services
10/7/2025 3:18:20 PM
10/7/2025 3:18:20 PM