Project Review Comments
- File Number
- ASB2425
- Project Name
- Kinch Subdivision
- Description
- Minor subdivision for 4 lots
- Parcels
- 6224000011 6224000011
- Applicant
-
Kinch
Paul and Amy Kinch ( panakinch@msn.com )
(719) 244-5846 Paul and Amy Kinch ( panakinch@msn.com )
(719) 244-5846 - File Number
- ASB2425
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 6/3/2024 3:33:23 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
EPC Stormwater Review
9/3/2026 2:56:58 PM |
2 |
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s): - As-Built Drawings - Pond Certification Letter EPC DPW Stormwater has no further comments. Once other reviewer’s comments have also been resolved, this ASB review process will be deemed complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Please finalize all other PA/FA Punchlist items. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
9/3/2026 2:56:58 PM | |
|
EPC DPW Asset Management
8/31/2026 8:19:47 AM |
2 |
We have reviewed your case and given your circumstances, we are prepared to accept your CAD files as is. Please note that El Paso County is working to update and clarify the language in the Engineering Criteria Manual (ECM) to require CAD files and drawings to be submitted in the county’s defined coordinate system of Colorado State Plane Central Zone and with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of the ECM below. 5.10.5.C: Monument Caps and Data All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law. As we prepare for this update, we are asking that you begin to deliver to us CAD files and drawings that meet these standards. This will help ensure a smooth transition as we work to incorporate these changes into our standard language in the ECM. Good day, Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
8/31/2026 8:19:47 AM | |
|
EPC DPW Asset Management
9/8/2025 10:01:26 AM |
1 |
Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
9/8/2025 10:01:26 AM | |
| View |
EPC Stormwater Review
11/18/2024 10:07:35 AM |
1 | Pond Certification Letter | 11/18/2024 10:07:35 AM |
| View |
EPC Stormwater Review
11/18/2024 10:07:23 AM |
1 | As-Built Drawings | 11/18/2024 10:07:23 AM |
|
EPC Stormwater Review
11/18/2024 10:06:50 AM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Drawings - Pond Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
11/18/2024 10:06:50 AM | |
|
PCD Engineering Inspections
10/30/2024 2:38:52 PM |
1 | No comments from Inspections. | 10/30/2024 2:38:52 PM | |
|
PCD Engineering Division
10/30/2024 9:26:00 AM |
1 |
There are no comments relating to drainage or transportation. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
10/30/2024 9:26:00 AM |
EDARP