Project Review Comments

Back to List


File Number
ASB2425
Project Name
Kinch Subdivision
Description
Minor subdivision for 4 lots
Parcels
6224000011 6224000011
Applicant
Kinch
Paul and Amy Kinch ( panakinch@msn.com )
(719) 244-5846
Paul and Amy Kinch ( panakinch@msn.com )
(719) 244-5846
File Number
ASB2425
Project Manager
Stormwater Glenn Reese
Status
Active
Created
6/3/2024 3:33:23 PM

View: Project Documents



Review Comments (8)

Link Agency Review # Comment
EPC Stormwater Review
9/3/2026 2:56:58 PM
2 Review 2: EPC DPW Stormwater comments have been resolved on the following document(s):
- As-Built Drawings
- Pond Certification Letter

EPC DPW Stormwater has no further comments. Once other reviewer’s comments have also been resolved, this ASB review process will be deemed complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Please finalize all other PA/FA Punchlist items.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
9/3/2026 2:56:58 PM
EPC DPW Asset Management
8/31/2026 8:19:47 AM
2 We have reviewed your case and given your circumstances, we are prepared to accept your CAD files as is.

Please note that El Paso County is working to update and clarify the language in the Engineering Criteria Manual (ECM) to require CAD files and drawings to be submitted in the county’s defined coordinate system of Colorado State Plane Central Zone and with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of the ECM below.

5.10.5.C: Monument Caps and Data
All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law.

As we prepare for this update, we are asking that you begin to deliver to us CAD files and drawings that meet these standards. This will help ensure a smooth transition as we work to incorporate these changes into our standard language in the ECM.

Good day,

Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
8/31/2026 8:19:47 AM
EPC DPW Asset Management
9/8/2025 10:01:26 AM
1 Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
9/8/2025 10:01:26 AM
View EPC Stormwater Review
11/18/2024 10:07:35 AM
1 Pond Certification Letter 11/18/2024 10:07:35 AM
View EPC Stormwater Review
11/18/2024 10:07:23 AM
1 As-Built Drawings 11/18/2024 10:07:23 AM
EPC Stormwater Review
11/18/2024 10:06:50 AM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Drawings
- Pond Certification Letter

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
11/18/2024 10:06:50 AM
PCD Engineering Inspections
10/30/2024 2:38:52 PM
1 No comments from Inspections. 10/30/2024 2:38:52 PM
PCD Engineering Division
10/30/2024 9:26:00 AM
1 There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
10/30/2024 9:26:00 AM