Project Review Comments
- Project Name
- CDR Fishers Canyon Channel
- Description
- Fischers Canon Creek and across from Walmart-Sams Club, north of Pikes Peak State College. Potential for trails and open space along creek
- Location
- Parcels
- 6504300049 6504300049
- Applicant
-
Kimley-Horn Associates
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280 Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280 - EA Number
- EA2343
- File Number
- CDR246
- Project Manager
- Scott Weeks
- Status
- Active
- Created
- 5/15/2024 1:31:18 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
7/2/2024 10:52:37 PM |
Channel Design Report comments | 7/2/2024 10:52:37 PM |
View |
PCD Engineering Division
7/3/2024 9:59:09 AM |
Construction Drawing Comments | 7/3/2024 9:59:09 AM |
PCD Engineering Division
7/2/2024 9:52:28 PM |
Review 1 comments on the following documents will be uploaded: -Construction Drawings -Channel Design Report Comments have been provided based on the information provided in the submitted documents. Additional comments should be expected as more information/analysis is provided in the design report, construction drawings, and other project documents. reviewed by: Daniel Torres danieltorres@elpasoco.com & Jeff Rice |
7/2/2024 9:52:28 PM | |
Colorado Department of Transportation - Pueblo Office
7/2/2024 4:31:41 PM |
• As the design progresses, suggest including additional notes or detail to identify how channel runoff is treated before discharging from the site. • The check dams are shown in the initial condition, but there is not a note indicating when they are removed. Verify they are removed after the grouted boulder structure is installed. |
7/2/2024 4:31:41 PM | |
EPC Stormwater Review
7/2/2024 9:00:28 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs.....(to be uploaded with Development Services comments) Per the information that the applicant uploaded with Submittal #1, all ESQCP related documents were not uploaded with Submittal #1 but will be uploaded with Submittal #2. So I'm just documenting that I will review those documents when they are submitted with Submittal #2. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
7/2/2024 9:00:28 AM | |
Stratmoor HIlls Fire Department
6/18/2024 2:12:14 PM |
The Stratmoor Hills Fire Department has no objections to this plan as described. Mark Stanwood for SHVFD |
6/18/2024 2:12:14 PM | |
PCD Project Manager
6/14/2024 11:48:48 AM |
Construction documents for review - no comment. | 6/14/2024 11:48:48 AM | |
Mountain View Electric Association, Inc.
6/11/2024 2:28:15 PM |
This property is not within MVEA territory | 6/11/2024 2:28:15 PM | |
RBD Floodplain
6/11/2024 12:37:22 PM |