Fischers Canon Creek and across from Walmart-Sams Club, north of Pikes Peak State College. Potential for trails and open space along creek
Location
Parcels
6504300049 6504300049
Applicant
Kimley-Horn Associates
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280
EA Number
EA2343
File Number
CDR246
Project Manager
Scott Weeks
Status
Active
Created
5/15/2024 1:31:18 PM

View: Project Documents



Review Comments (9)

Link Agency Comment
View PCD Engineering Division
7/2/2024 10:52:37 PM
Channel Design Report comments 7/2/2024 10:52:37 PM
View PCD Engineering Division
7/3/2024 9:59:09 AM
Construction Drawing Comments 7/3/2024 9:59:09 AM
PCD Engineering Division
7/2/2024 9:52:28 PM
Review 1 comments on the following documents will be uploaded:
-Construction Drawings
-Channel Design Report

Comments have been provided based on the information provided in the submitted documents. Additional comments should be expected as more information/analysis is provided in the design report, construction drawings, and other project documents.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
&
Jeff Rice
7/2/2024 9:52:28 PM
Colorado Department of Transportation - Pueblo Office
7/2/2024 4:31:41 PM
• As the design progresses, suggest including additional notes or detail to identify how channel runoff is treated before discharging from the site.
• The check dams are shown in the initial condition, but there is not a note indicating when they are removed. Verify they are removed after the grouted boulder structure is installed.
7/2/2024 4:31:41 PM
EPC Stormwater Review
7/2/2024 9:00:28 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs.....(to be uploaded with Development Services comments)

Per the information that the applicant uploaded with Submittal #1, all ESQCP related documents were not uploaded with Submittal #1 but will be uploaded with Submittal #2. So I'm just documenting that I will review those documents when they are submitted with Submittal #2.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
7/2/2024 9:00:28 AM
Stratmoor HIlls Fire Department
6/18/2024 2:12:14 PM
The Stratmoor Hills Fire Department has no objections to this plan as described.
Mark Stanwood for SHVFD
6/18/2024 2:12:14 PM
PCD Project Manager
6/14/2024 11:48:48 AM
Construction documents for review - no comment. 6/14/2024 11:48:48 AM
Mountain View Electric Association, Inc.
6/11/2024 2:28:15 PM
This property is not within MVEA territory 6/11/2024 2:28:15 PM
RBD Floodplain
6/11/2024 12:37:22 PM
Floodplain documentation to be provided in the 3rd submittal 6/11/2024 12:37:22 PM