Project Review Comments
- Project Name
- RV Storage Project on Tamlin Road
- Description
- Expansion of the Tamlin Road RV Storage Project (PCD File No.: PPR1945) on the west side of the site. Adding additonal parking spaces for RV's and addional full-spectrum EDB to treat developed flows.
- Location
- Parcels
- 5321002001 5321002001
- Applicant
-
JR Engineering
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241 Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241 - EA Number
- EA2454
- File Number
- PPR2437
- Project Manager
- Scott Weeks
- Status
- Active
- Created
- 5/6/2024 9:02:33 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
County Attorney - Development Review
10/31/2024 9:25:24 AM |
See edits to DMA. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013. |
10/31/2024 9:25:24 AM |
View |
Mountain View Electric Association, Inc.
10/24/2024 12:53:17 PM |
See attached comments | 10/24/2024 12:53:17 PM |
View |
EPC Stormwater Review
10/23/2024 1:54:30 PM |
SWMP Checklist | 10/23/2024 1:54:30 PM |
View |
EPC Stormwater Review
10/23/2024 1:54:12 PM |
SWMP | 10/23/2024 1:54:12 PM |
View |
EPC Stormwater Review
10/23/2024 1:52:58 PM |
PBMP Applicability Form | 10/23/2024 1:52:58 PM |
View |
EPC Stormwater Review
10/23/2024 1:52:36 PM |
O&M Manual | 10/23/2024 1:52:36 PM |
View |
EPC Stormwater Review
10/23/2024 1:52:12 PM |
GEC Checklist | 10/23/2024 1:52:12 PM |
View |
EPC Stormwater Review
10/23/2024 1:51:56 PM |
GEC Plan | 10/23/2024 1:51:56 PM |
View |
EPC Stormwater Review
10/23/2024 1:51:19 PM |
Drainage Report | 10/23/2024 1:51:19 PM |
View |
PCD Engineering Division
10/23/2024 11:30:50 AM |
TIS_V1 | 10/23/2024 11:30:50 AM |
View |
PCD Engineering Division
10/23/2024 11:18:38 AM |
Soils Report_V1 | 10/23/2024 11:18:38 AM |
View |
PCD Engineering Division
10/23/2024 11:16:30 AM |
SDP_V1 | 10/23/2024 11:16:30 AM |
View |
PCD Engineering Division
10/23/2024 11:13:21 AM |
LOI_V1 | 10/23/2024 11:13:21 AM |
View |
PCD Engineering Division
10/23/2024 11:12:29 AM |
FAE_V1 | 10/23/2024 11:12:29 AM |
View |
PCD Engineering Division
10/23/2024 11:10:41 AM |
ESQCP_V1 | 10/23/2024 11:10:41 AM |
View |
Cherokee Metro Dist
10/23/2024 9:51:43 AM |
Cherokee Metropolitan District has a 10-foot-wide easement for a 20" Ductile Iron pipe that runs on the south side of your development. Attached is a GIS image of the 20" DIP along with said easement respective to it. On page 3 of your "Site Plan", on the South side of the development, the proposed Austrian Black Pines will eventually infringe on this easement via their root structures and potentially will endanger our main northern line into our District. Suggest those trees either do not go in or are moved more inward of your development. |
10/23/2024 9:51:43 AM |
View |
PCD Project Manager
10/23/2024 8:40:22 AM |
10/23/2024 8:40:22 AM | |
PCD Engineering Division
10/23/2024 11:50:03 AM |
Engineering Review Ver.1 Please see engineering review comments on the following documents ESQCP_V1 PDR_V1 This should be a Final Drainage Report. To be uploaded by SW FAE_V1 GEC Plan_V1 Full Pond designs are required. To be uploaded by SW LOI_V1 SDP_V1 Soils Report_V1 Update to reflect current project area TIS_V1 Note: Road Impact fees will not be applicable with this submittal. Thank you Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/23/2024 11:50:03 AM | |
EPC Stormwater Review
10/23/2024 1:22:02 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - ESQCP.......................(uploaded by development services engineer) - GEC Plan - GEC Checklist - O&M Manual - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only) Note: Stormwater does not have comments on the Detention Maintenance Agreement, but the County Attorney may and those comments will need to be addressed. Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
10/23/2024 1:22:02 PM | |
View |
PCD Project Manager
10/22/2024 11:26:30 AM |
Planning has comments to the following documents: - Site Development Plan - Letter of Intent - Landscape drawings - Lighting Plan - Grading and Erosion Control Plan |
10/22/2024 11:26:30 AM |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/21/2024 9:52:44 AM |
Good morning Scott, Please see the attached CSU 1st review for PPR2437. Five (5) comments have been requested. Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
10/21/2024 9:52:44 AM |
Falcon School District 49
10/17/2024 9:01:40 AM |
District 49 has no comment at this time. | 10/17/2024 9:01:40 AM | |
Colorado Springs Planning & Community Development
10/16/2024 4:14:59 PM |
Are there public improvements along Tamlin through this section? | 10/16/2024 4:14:59 PM | |
View |
Falcon Fire Protection District
10/11/2024 9:44:11 AM |
10/11/2024 9:44:11 AM | |
Pikes Peak Regional Building Department
10/10/2024 1:20:28 PM |
Enumerations has no comment. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
10/10/2024 1:20:28 PM |