Project Review Comments
- File Number
- ASB2410
- Project Name
- Crossroads Mixed Use Filing No. 1
- Description
- 300 unit multi-family single lot, detention tract, private road tract, sign tract, and future development tract
- Parcels
- 5408007005 5408007005 5408007006 5408007006
- Applicant
-
Kimley-Horn
Virgil Sanchez ( virgils@mscivil.com ) Virgil Sanchez ( virgils@mscivil.com ) - File Number
- ASB2410
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 3/19/2024 4:09:02 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
EPC Stormwater Review
2/19/2026 2:53:02 PM |
2 | Pond Certification Letter | 2/19/2026 2:53:02 PM |
| View |
EPC Stormwater Review
2/19/2026 2:52:42 PM |
2 | As-Built Drawings | 2/19/2026 2:52:42 PM |
|
PCD Engineering Division
2/19/2026 11:06:50 AM |
2 |
Engineering Review Ver.2 No engineering comments Cherokee Metro final acceptance of utilities should be completed once PA has been completed. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ |
2/19/2026 11:06:50 AM | |
|
EPC Stormwater Review
2/10/2026 5:24:32 PM |
2 |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Drawings - Pond Certification Letter Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
2/10/2026 5:24:32 PM | |
|
EPC DPW Asset Management
2/9/2026 8:02:54 AM |
2 |
Please update the CAD so that it’s in Colorado State Plane Central zone coordinates and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
2/9/2026 8:02:54 AM | |
|
EPC DPW Asset Management
9/8/2025 9:43:04 AM |
1 |
Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
9/8/2025 9:43:04 AM | |
| View |
PCD Engineering Division
8/27/2024 9:23:10 AM |
1 | Cert Letter Redlines | 8/27/2024 9:23:10 AM |
| View |
PCD Engineering Division
8/27/2024 9:17:56 AM |
1 | As-Builts Redlines | 8/27/2024 9:17:56 AM |
|
PCD Engineering Division
8/27/2024 9:14:35 AM |
1 |
Review 1 comments from the Stormwater Team are attached. There are no comments relating to drainage or transportation. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
8/27/2024 9:14:35 AM | |
|
EPC Stormwater Review
8/19/2024 4:42:40 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Drawings..............(to be uploaded by Lupe when she has completed her review) - Pond Certification Letter...(to be uploaded by Lupe when she has completed her review) Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
8/19/2024 4:42:40 PM |
EDARP