Project Review Comments

Back to List


File Number
ASB2410
Project Name
Crossroads Mixed Use Filing No. 1
Description
300 unit multi-family single lot, detention tract, private road tract, sign tract, and future development tract
Parcels
5408007005 5408007005 5408007006 5408007006
Applicant
Kimley-Horn
Virgil Sanchez ( virgils@mscivil.com ) Virgil Sanchez ( virgils@mscivil.com )
File Number
ASB2410
Project Manager
Stormwater Glenn Reese
Status
Active
Created
3/19/2024 4:09:02 PM

View: Project Documents



Review Comments (10)

Link Agency Review # Comment
View EPC Stormwater Review
2/19/2026 2:53:02 PM
2 Pond Certification Letter 2/19/2026 2:53:02 PM
View EPC Stormwater Review
2/19/2026 2:52:42 PM
2 As-Built Drawings 2/19/2026 2:52:42 PM
PCD Engineering Division
2/19/2026 11:06:50 AM
2 Engineering Review Ver.2

No engineering comments
Cherokee Metro final acceptance of utilities should be completed once PA has been completed.

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
2/19/2026 11:06:50 AM
EPC Stormwater Review
2/10/2026 5:24:32 PM
2 Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Drawings
- Pond Certification Letter

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
2/10/2026 5:24:32 PM
EPC DPW Asset Management
2/9/2026 8:02:54 AM
2 Please update the CAD so that it’s in Colorado State Plane Central zone coordinates and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
2/9/2026 8:02:54 AM
EPC DPW Asset Management
9/8/2025 9:43:04 AM
1 Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
9/8/2025 9:43:04 AM
View PCD Engineering Division
8/27/2024 9:23:10 AM
1 Cert Letter Redlines 8/27/2024 9:23:10 AM
View PCD Engineering Division
8/27/2024 9:17:56 AM
1 As-Builts Redlines 8/27/2024 9:17:56 AM
PCD Engineering Division
8/27/2024 9:14:35 AM
1 Review 1 comments from the Stormwater Team are attached.

There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
8/27/2024 9:14:35 AM
EPC Stormwater Review
8/19/2024 4:42:40 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Drawings..............(to be uploaded by Lupe when she has completed her review)
- Pond Certification Letter...(to be uploaded by Lupe when she has completed her review)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
8/19/2024 4:42:40 PM