Project Review Comments
- Project Name
- Grandview Reserve Lift Station Forcemain Interceptor at Saddlehorn
- Description
- LiftStation; no ponds at Lots 35 and 36, Saddlehorn Ranch Filing No. 3; Forcemain-Curtis Road/Judge Orr to Stapleton/Meridian Ranch Blvd, all within EPC ROW; Interceptor-Highway 24/Future Rex Road to Curtis Road/Judge Orr, all within EPC ROW or private easements (Curtis Road)
- Location
- Southeast corner of Judge Orr and Curtis Road
- Applicant
-
HR Green Inc.
Gregory Panza ( gpanza@hrgreen.com ) Gregory Panza ( gpanza@hrgreen.com ) - File Number
- PPR2421
- Project Manager
- Ashlyn Mathy
- Status
- Active
- Created
- 3/7/2024 3:40:41 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Health Department
8/30/2024 8:08:57 PM |
8/30/2024 8:08:57 PM | |
EPC Parks Department
8/12/2024 8:42:33 AM |
The El Paso County Parks Master Plan identifies two bicycle routes, the Curtis Road Route and Judge Orr Road Route, immediately adjacent to this project. These two bicycle routes will be within county right-of-way, so no county easements are necessary for this application. | 8/12/2024 8:42:33 AM | |
Upper Black Squirrel Creek GWMD
8/8/2024 4:17:59 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 8/8/2024 4:17:59 PM | |
Cherokee Metro Dist
8/2/2024 8:48:37 AM |
The site of this development is not within Cherokee Metropolitan District's legal boundaries. There is no water infrastructure of Cherokee's in the area to approve tie in with this development. | 8/2/2024 8:48:37 AM | |
PCD Project Manager
7/30/2024 12:05:50 PM |
Planning comments can be found on: -Letter of Intent -Lighting Plan -Landscape Plan -Site Development Plan *there was no sign plan submitted, if there is no sign associated with the site, please include in the Letter of Intent. Note: any future signs will need to go through the sign permit process with EPC (minor application).* -Ashlyn Mathy |
7/30/2024 12:05:50 PM | |
View |
PCD Project Manager
7/30/2024 12:03:35 PM |
Landscape Plan comments | 7/30/2024 12:03:35 PM |
View |
PCD Project Manager
7/30/2024 12:03:16 PM |
Lighting Plan comments | 7/30/2024 12:03:16 PM |
View |
PCD Project Manager
7/30/2024 12:02:59 PM |
Site Development Plan comments | 7/30/2024 12:02:59 PM |
View |
PCD Project Manager
7/30/2024 12:02:40 PM |
Letter of Intent comments | 7/30/2024 12:02:40 PM |
View |
PCD Engineering Division
7/29/2024 5:51:32 PM |
Gravity Interceptor On-site CDs | 7/29/2024 5:51:32 PM |
View |
PCD Engineering Division
7/29/2024 5:51:04 PM |
Gravity Interceptor Off-site CDs | 7/29/2024 5:51:04 PM |
View |
PCD Engineering Division
7/29/2024 5:50:27 PM |
FAE Redlines | 7/29/2024 5:50:27 PM |
View |
PCD Engineering Division
7/29/2024 5:50:01 PM |
Forcemain CD Redlines | 7/29/2024 5:50:01 PM |
View |
EPC Stormwater Review
7/29/2024 5:38:09 PM |
SWMP Checklist | 7/29/2024 5:38:09 PM |
View |
EPC Stormwater Review
7/29/2024 5:37:44 PM |
SWMP | 7/29/2024 5:37:44 PM |
View |
EPC Stormwater Review
7/29/2024 5:36:22 PM |
PBMP Applicability Form | 7/29/2024 5:36:22 PM |
View |
EPC Stormwater Review
7/29/2024 5:35:56 PM |
GEC Checklist | 7/29/2024 5:35:56 PM |
View |
EPC Stormwater Review
7/29/2024 5:35:25 PM |
GEC Plan | 7/29/2024 5:35:25 PM |
View |
EPC Stormwater Review
7/29/2024 5:34:49 PM |
ESQCP | 7/29/2024 5:34:49 PM |
EPC Stormwater Review
7/29/2024 5:31:54 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs (3 separate PDFs).........(to be uploaded with Development Services comments) - ESQCP - FAE..............(to be uploaded with Development Services comments) - GEC Plan - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
7/29/2024 5:31:54 PM | |
Mountain View Electric Association, Inc.
7/29/2024 9:55:29 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. | 7/29/2024 9:55:29 AM | |
Mountain View Electric Association, Inc.
7/29/2024 9:54:59 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. | 7/29/2024 9:54:59 AM | |
PCD Engineering Division
7/29/2024 5:51:59 PM |
Engineering review 1 has comments on the following documents: - Letter of Intent (to be uploaded by Project Manager) - Site Development Plan (to be uploaded by Project Manager) - Forcemain CDs - Financial Assurance Forms - Gravity Interceptor Off-site CDs - Gravity Interceptor On-site CDs Note that road impact fees will be due for the lift station. Fees for public/institution will be used. Review completed by Bret Dilts, PE bretdilts@elpasoco.com 719-339-5062 Charlene Durham, PE charlenedurham@elpasoco.com 719-520-7951 |
7/29/2024 5:51:59 PM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/26/2024 10:18:33 AM |
7/26/2024 10:18:33 AM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/26/2024 10:17:25 AM |
Good morning Ashlyn, Please see the attached CSU 1st review of PPR2421. Two (2) comments have been added: 1. Show and label all existing utility service lines with diameter, material, and either Public and/or private. 2. Label as "Gas Distribution Main: AE19M7" Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
7/26/2024 10:17:25 AM |
911 Authority - El Paso/Teller County
7/22/2024 7:34:05 AM |
No new streetnames requested on this submittal. The development plan drawing does not indicate the access road name for this development. The name intended for this road is “Rocoso Trl”. This name should be notated on the plans. Thank you Justin |
7/22/2024 7:34:05 AM | |
Colorado Division of Water Resources
7/18/2024 10:05:19 AM |
No information was provided regarding proposed water uses or estimated water demands on the property, therefore this office has no comments on the water supply for this referral. | 7/18/2024 10:05:19 AM | |
Pikes Peak Regional Building Department
7/11/2024 7:02:23 AM |
1. Address assigned to lot 35 is 14831 & lot 36-14830 Rocoso Trail, Saddlehorn Ranch Fil. No. 3. Only one address should be used. 2. It looks as though, that the lift station will be built across the lot line. This cannot happen. What is the distance from the north lot line of lot 36 to the south wall of the lift station? It may be best to combine this lots as one lot. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
7/11/2024 7:02:23 AM |