Project Review Comments
- Project Name
- Judge Orr Fabric Building PPR
- Description
- Location
- Parcels
- 4305006003 4305006003
- Applicant
-
Hammers Construction
Anthony Mezzetta ( anthony.mezzetta@metronet.com )
000-0000 Anthony Mezzetta ( anthony.mezzetta@metronet.com )
000-0000 - EA Number
- EA23101
- File Number
- PPR2529
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 11/8/2023 7:10:27 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| View |
EPC Health Department
11/3/2025 9:24:53 AM |
11/3/2025 9:24:53 AM | |
|
El Paso County Conservation Dist
10/30/2025 4:56:28 PM |
No comments at this time. | 10/30/2025 4:56:28 PM | |
| View |
County Attorney - Development Review
10/30/2025 1:13:22 PM |
See edits to DMA. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com. |
10/30/2025 1:13:22 PM |
|
Mountain View Electric Association, Inc.
10/29/2025 2:52:18 PM |
MVEA has no objection. | 10/29/2025 2:52:18 PM | |
| View |
EPC Stormwater Review
10/28/2025 7:20:39 AM |
SWMP Checklist | 10/28/2025 7:20:39 AM |
| View |
EPC Stormwater Review
10/28/2025 7:20:18 AM |
SWMP comments | 10/28/2025 7:20:18 AM |
| View |
EPC Stormwater Review
10/28/2025 7:20:00 AM |
PCM Applicability Form | 10/28/2025 7:20:00 AM |
| View |
EPC Stormwater Review
10/28/2025 7:19:35 AM |
O&M comments | 10/28/2025 7:19:35 AM |
| View |
EPC Stormwater Review
10/28/2025 7:19:15 AM |
GEC Checklist | 10/28/2025 7:19:15 AM |
| View |
EPC Stormwater Review
10/28/2025 7:18:33 AM |
GEC comments | 10/28/2025 7:18:33 AM |
| View |
EPC Stormwater Review
10/28/2025 7:18:03 AM |
FAE comments | 10/28/2025 7:18:03 AM |
| View |
EPC Stormwater Review
10/28/2025 7:17:44 AM |
ESQCP comments | 10/28/2025 7:17:44 AM |
| View |
EPC Stormwater Review
10/28/2025 7:17:20 AM |
Drainage Report comments | 10/28/2025 7:17:20 AM |
| View |
PCD Project Manager
10/27/2025 4:15:01 PM |
-V1 Letter of Intent | 10/27/2025 4:15:01 PM |
| View |
PCD Project Manager
10/27/2025 4:13:20 PM |
-V1 Site Development Plan | 10/27/2025 4:13:20 PM |
|
PCD Engineering Division
10/27/2025 3:58:19 PM |
EPC Engineering Review 1: Comments have been provided on the following documents: - Drainage Report (to be uploaded by SW Engineer) - GEC Plans (to be uploaded by SW Engineer) - Letter of Intent (to be uploaded by PM) - Site Development Plan (to be uploaded by PM) Reviewed by: Jalal Saleh, PE jalalsaleh@elpasoco.com Charlene Durham, PE charlenedurham@elpasoco.com |
10/27/2025 3:58:19 PM | |
|
EPC Fire and Wildfire Program Manager
10/27/2025 3:20:03 PM |
Provide the fire flow at 20psi for the two hydrants shown on site. Do the existing hydrants have collision protection or will it be added? What method is used for calculating the required fire flow for the purposed structure and what is the required fire flow? Roland Peterson Fire Safety and Wildfire Mitigation Program Manager Planning & Community Development 719.520.6075 rolandpeterson@elpasoco.com |
10/27/2025 3:20:03 PM | |
| View |
PCD Project Manager
10/27/2025 2:30:37 PM |
-V1 Landscape Plan | 10/27/2025 2:30:37 PM |
| View |
PCD Project Manager
10/27/2025 2:30:02 PM |
-V1 Lighting Plan | 10/27/2025 2:30:02 PM |
|
EPC Stormwater Review
10/27/2025 4:10:22 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - ESQCP - FAE - GEC Plan - GEC Checklist - PCM O&M Manual - PCM Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal) - PCM - MHFD Detention Calcs or SDI Form Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com |
10/27/2025 4:10:22 PM | |
|
Upper Black Squirrel Creek GWMD
10/24/2025 3:29:31 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 10/24/2025 3:29:31 PM | |
|
Pikes Peak Regional Building Department
10/24/2025 9:15:24 AM |
1. Plans for the conversion of the existing fabric building can be submitted under the existing address 12827 Judge Orr Rd. 2. No further comment. Thank you, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
10/24/2025 9:15:24 AM | |
|
PCD Project Manager
10/27/2025 4:16:31 PM |
Planning has comments on the following version one documents: -Letter of Intent -Site Development Plan -Landscape Drawings -Lighting Plan DPW Stormwater will upload additional review comments. Joe Letke Planner JoeLetke@elpasoco.com |
10/27/2025 4:16:31 PM | |
| View |
Falcon Fire Protection District
10/20/2025 8:39:54 AM |
10/20/2025 8:39:54 AM | |
|
RBD Floodplain
10/14/2025 7:45:05 AM |
parcel 4305006003 is not in the floodplain, no further comment | 10/14/2025 7:45:05 AM |
EDARP