Project Review Comments

Back to List


Project Name
Urban Landing PUDSP
Description
PUD/Preliminary Plan for Urban Edge by Classic Homes; a single-family residential development of approximately 49 lots at a density of 8 du/ac. Requires hearings before Planning Commission and Board of County Commissioners.
Location
Parcels
7136001045 7136001045
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA23104
File Number
PUDSP243
Project Manager
Ryan Howser
Status
Active
Created
11/6/2023 7:53:24 AM

View: Project Documents



Review Comments (43)

Link Agency Comment
PCD Administrative Notice
10/24/2024 3:06:01 PM
On 10/24/2024, PCD mailed "Notice of Application" letters to the surrounding property owners within a 500-foot range (34 addresses, all other owners are part of the application). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $23.46 PR 10/24/2024 3:06:01 PM
View PCD Engineering Division
10/14/2024 5:37:58 PM
Deviation Request comments 10/14/2024 5:37:58 PM
View PCD Engineering Division
10/14/2024 5:37:10 PM
Landscape Plan Comments 10/14/2024 5:37:10 PM
View PCD Engineering Division
10/14/2024 5:36:23 PM
PUD plan comments 10/14/2024 5:36:23 PM
View PCD Engineering Division
10/14/2024 5:35:32 PM
-Drainage Report comments 10/14/2024 5:35:32 PM
View PCD Engineering Division
10/14/2024 5:34:57 PM
TIS comments 10/14/2024 5:34:57 PM
PCD Engineering Division
10/14/2024 5:37:25 PM
Review 2 comments on the following documents will be uploaded:
-TIS
-Drainage Report
-PUD Plan
-Landscape Plans (see comments from Planning)
-Deviation Request

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
719-520-6305
10/14/2024 5:37:25 PM
PCD Project Manager
10/11/2024 2:57:02 PM
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Landscape Plan (to be uploaded by Engineering)
- PUDSP (to be uploaded by Engineering)
10/11/2024 2:57:02 PM
View EPC Stormwater Review
10/10/2024 10:27:24 AM
PBMP_v2 10/10/2024 10:27:24 AM
View Colorado Department of Transportation - Pueblo Office
10/8/2024 11:30:22 AM
10/8/2024 11:30:22 AM
View County Attorney - Water
10/7/2024 3:41:25 PM
See Water Supply Review and Recommendations. 10/7/2024 3:41:25 PM
EPC Stormwater Review
10/10/2024 10:25:28 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- PBMP Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
ChristinaPrete@elpasoco.com
10/10/2024 10:25:28 AM
View USAFA Base Planner
10/21/2024 12:17:33 PM
See attached file for USAFA's comments. Please keep us in the loop if anything changes with this project. Thank you. 10/21/2024 12:17:33 PM
Mountain View Electric Association, Inc.
10/3/2024 4:13:12 PM
See comment letter dated 8/5/2024 - no additional comments at this time. 10/3/2024 4:13:12 PM
Donald Wescott Fire Protection District
10/2/2024 11:48:42 AM
The fire department has no comment on rezoning.
The answers received to our questions dated July 31, 2024 are acceptable.
10/2/2024 11:48:42 AM
View EPC Parks Department
9/26/2024 2:21:52 PM
El Paso County Parks and Community Services Department, Final Comments, 2nd Submittal - Please See Attached Documentation (Originally administratively approved on August 14, 2024) 9/26/2024 2:21:52 PM
View USAFA Base Planner
9/13/2024 1:04:19 PM
9/13/2024 1:04:19 PM
View Parks Advisory Board
8/20/2024 1:59:25 PM
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Documents (Administratively approved on 08/14/2024) 8/20/2024 1:59:25 PM
View PCD Engineering Division
8/12/2024 3:57:42 PM
Deviation Request comments 8/12/2024 3:57:42 PM
View PCD Engineering Division
8/12/2024 3:57:06 PM
Landscape Plan comments 8/12/2024 3:57:06 PM
View PCD Engineering Division
8/12/2024 3:56:37 PM
Letter of Intent comments 8/12/2024 3:56:37 PM
View PCD Engineering Division
8/12/2024 3:56:04 PM
TIS comments 8/12/2024 3:56:04 PM
View PCD Engineering Division
8/12/2024 3:55:34 PM
PUDSP comments 8/12/2024 3:55:34 PM
View PCD Engineering Division
8/12/2024 3:54:58 PM
-Preliminary Drainage Report comments 8/12/2024 3:54:58 PM
PCD Engineering Division
8/12/2024 3:53:39 PM
review 1 comment on the following documents will be uploaded:
-Preliminary Drainage Report
-PUDSP
-TIS
-Letter of intent
-Landscape Plan (see comments from planning)
-Deviation Request

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
719-520-6305
8/12/2024 3:53:39 PM
View PCD Project Manager
8/7/2024 4:34:35 PM
V1: Zoning Map Comments 8/7/2024 4:34:35 PM
PCD Project Manager
8/7/2024 3:58:49 PM
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Landscape Plan (to be uploaded by Engineering)
- Letter of Intent (to be uploaded by Engineering)
- PUDSP (to be uploaded by Engineering)
- Zoning Map
8/7/2024 3:58:49 PM
Pikes Peak Regional Building Department
8/7/2024 9:50:43 AM
1. All lots shall be addressed off the named street at the rear of the home. Addresses shall be placed on both the front and rear of the home.
2. Street names have been approved.
3. Enumerations will have further comments when the final plat is submitted for review.

General Development Plan Comments apply:
1. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door, and should be placed as close to the edge of the lot as possible, running parallel to the street it is being addressed from.
2. Rear Loaded homes will have unique address assignment and placement. A plat note will be required showing address placement.
3. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing.

Thanks,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
8/7/2024 9:50:43 AM
View Colorado Division of Water Resources
8/6/2024 6:15:24 PM
8/6/2024 6:15:24 PM
Colorado Geological Survey
8/6/2024 3:48:16 PM
The proposed Urban Landing site (39.0463, -104.8424) does not contain any geologic hazards or unusual geotechnical constraints that would preclude the proposed residential use and density of 49 SF lots on approximately 6.6 acres. The available referral documents include a Soils and Geology Study, Urban Landing, Struthers Road and Spanish Bit Drive, El Paso County, Colorado (Entech Engineering, Inc. Job No. 241188, July 12, 2024)

Entech states (Potentially Collapsible/Expansive Soils section, page 6), "Potentially Collapsible/Expansive soils were encountered in some of the test borings drilled on site. Consolidations ranged from low to moderately high, and swells ranged from low to moderately high in the soils tested... Collapsible or expansive soils encountered beneath foundations will require mitigation. Mitigation of expansive soils may require special foundation design. Overexcavation and
replacement with non-expansive soils at a minimum of 95 percent of its maximum Modified Proctor Dry Density, ASTM D-1557 is a suitable mitigation, which is common in the area. Floor slabs on expansive soils should be expected to experience movement. Overexcavation and replacement has been successful in minimizing slab movements. Overexcavation depths of 4 feet are anticipated for the site."

Four feet may be a sufficient depth of overexcavation if proposed units will not have a below-grade (basement or crawl space) level, but overexcavation, where necessary, should extend to a depth of at least 2 to 3 feet *beneath foundation bearing elevations*. Entech should check, and if necessary, revise this section.

Jill Carlson, Colorado Geological Survey
carlson@mines.edu
8/6/2024 3:48:16 PM
EPC Stormwater Review
8/6/2024 11:39:04 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded with Development Services comments)
- Prelim Plan...........(to be uploaded with Development Services comments)

Please provide the following document upon resubmittal (the planner will send an upload request):
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
8/6/2024 11:39:04 AM
View Mountain View Electric Association, Inc.
8/5/2024 1:13:52 PM
See attached comments 8/5/2024 1:13:52 PM
County Attorney - Water
8/2/2024 12:08:01 PM
The County Attorney's Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. In addition, pursuant to sections 8.4.7 (B)(3)(c)(v) and (e) of the Land Development Code, please add information to the Water Resources Report regarding Donala's total water supply and its current commitments to serve. Please include a summary of Donala's existing water commitments to existing and pending development. 8/2/2024 12:08:01 PM
View Donald Wescott Fire Protection District
7/31/2024 2:29:19 PM
FD apparatus dimensions 7/31/2024 2:29:19 PM
View Donald Wescott Fire Protection District
7/31/2024 2:28:51 PM
FD apparatus turning radius 7/31/2024 2:28:51 PM
View Donald Wescott Fire Protection District
7/31/2024 2:27:37 PM
FD comments 7/31/2024 2:27:37 PM
View Donald Wescott Fire Protection District
7/31/2024 2:27:11 PM
FD commitment letter 7/31/2024 2:27:11 PM
View EPC Parks Department
7/31/2024 9:56:17 AM
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documentation (To be presented to and endorsed by the EPC Park Advisory Board on 08/14/2024) 7/31/2024 9:56:17 AM
View Colorado Department of Transportation - Pueblo Office
7/26/2024 11:07:32 AM
7/26/2024 11:07:32 AM
View El Paso County Conservation Dist
7/23/2024 10:39:34 AM
Please see attached .PDF for brief comments. Thanks! 7/23/2024 10:39:34 AM
View EPC Environmental Services
7/19/2024 1:52:19 PM
7/19/2024 1:52:19 PM
Academy SD 20 Building Fund
7/19/2024 10:00:52 AM
Academy District 20 is in receipt of File #PUDSP243 for approval of the Urban Landing PUDSP.

The District is requesting fees in lieu of land dedication per the existing County Code for all residential units within this development.

The District is able to serve each student who is a resident of District 20.

If you need additional information, please contact me.

Don Smith
Planning Consultant
7/19/2024 10:00:52 AM
911 Authority - El Paso/Teller County
7/18/2024 10:22:50 AM
Comments for E911 as follows:

Urban Landing Vw – Available and reserved
Trendsetter Pt – Available and reserved
Innovative Hts – Available and reserved

Thank you
Justin
7/18/2024 10:22:50 AM