Project Review Comments
- File Number
- ASB233
- Project Name
- Falcon Marketplace
- Description
- Final Plat for 11 commercial lots , two detention tracts, and the Eastonville connection through the site.
- Location
- Northwest corner of Woodmen Road and Meridian Road
- Parcels
- 5300000589 5300000589 5301401052 5301401052 5301401324 5301401324 5301401326 5301401326 5301401327 5301401327 5301401329 5301401329 5301402001 5301402001 5301402002 5301402002 5301403001 5301403001 5301403003 5301403003 5301403004 5301403004 5301403005 5301403005 5301403006 5301403006
- Applicant
-
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 - File Number
- ASB233
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 8/29/2023 8:33:19 AM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
EPC Stormwater Review
12/16/2025 4:55:59 PM |
3 | As Built Drawings_v3 | 12/16/2025 4:55:59 PM |
|
PCD Engineering Division
12/15/2025 4:34:46 PM |
3 |
Review 1 comment: -Public Improvements Cert. Letter shall state the following per ECM 5.10.6.B: The site and adjacent properties (as affected by work performed under the County permit) are stable with respect to settlement and subsidence, sloughing of cut and fill slopes, revegetation or other ground cover, and that the improvements (public improvements, common development improvements, site grading and paving) meet or exceed the minimum design requirements. -As-Built Drawings: Each sheet of the record drawings shall be designated as "Engineering Record Drawings" and signed and dated by the engineer of record per ECM 5.10.6.C -Please add notes to the storm facilities regarding the state of construction/outstanding issues. Reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/15/2025 4:34:46 PM | |
|
EPC Stormwater Review
12/16/2025 4:56:50 PM |
3 |
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) along with Development Services comments (in blue text boxes) on the following uploaded documents: - As-Built Construction Drawings Reviewed by: Christina Prete, P.E. Stormwater Manager 719.520.6877 ChristinaPrete@elpasoco.com |
12/16/2025 4:56:50 PM | |
|
PCD Engineering Inspections
12/10/2025 8:40:24 AM |
3 | No comments from Inspections | 12/10/2025 8:40:24 AM | |
|
EPC DPW Asset Management
12/1/2025 10:45:48 AM |
3 |
Please update the CAD so that it’s in Colorado State Plane Central zone and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
12/1/2025 10:45:48 AM | |
| View |
EPC Stormwater Review
2/15/2024 2:34:56 PM |
2 | As-Built Construction Drawings | 2/15/2024 2:34:56 PM |
|
EPC Stormwater Review
2/15/2024 2:33:02 PM |
2 |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Construction Drawings Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
2/15/2024 2:33:02 PM | |
|
PCD Engineering Division
2/8/2024 2:51:15 PM |
2 |
Development engineering has no comments. Any approved documents will be uploaded by the project manager. Reviewed by: Carlos Hernandez carloshernandez@elpasoco.com |
2/8/2024 2:51:15 PM | |
| View |
EPC Stormwater Review
12/20/2023 9:24:23 AM |
1 | As-Built Construction Drawings | 12/20/2023 9:24:23 AM |
|
EPC Stormwater Review
12/19/2023 12:31:01 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Construction Drawings Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
12/19/2023 12:31:01 PM | |
|
PCD Engineering Division
12/12/2023 5:19:49 PM |
1 |
Engineering has no comments. Any approved documents will be uploaded by the project manager. Reviewed by: Carlos Hernandez carloshernandez@elpasoco.com |
12/12/2023 5:19:49 PM |
EDARP