Project Review Comments

Back to List


File Number
ASB233
Project Name
Falcon Marketplace
Description
Final Plat for 11 commercial lots , two detention tracts, and the Eastonville connection through the site.
Location
Northwest corner of Woodmen Road and Meridian Road
Parcels
5300000589 5300000589 5301401052 5301401052 5301401324 5301401324 5301401326 5301401326 5301401327 5301401327 5301401329 5301401329 5301402001 5301402001 5301402002 5301402002 5301403001 5301403001 5301403003 5301403003 5301403004 5301403004 5301403005 5301403005 5301403006 5301403006
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
File Number
ASB233
Project Manager
Stormwater Glenn Reese
Status
Active
Created
8/29/2023 8:33:19 AM

View: Project Documents



Review Comments (11)

Link Agency Review # Comment
View EPC Stormwater Review
12/16/2025 4:55:59 PM
3 As Built Drawings_v3 12/16/2025 4:55:59 PM
PCD Engineering Division
12/15/2025 4:34:46 PM
3 Review 1 comment:
-Public Improvements Cert. Letter shall state the following per ECM 5.10.6.B:
The site and adjacent properties (as affected by work performed under the County permit) are stable with respect to settlement and subsidence, sloughing of cut and fill slopes, revegetation or other ground cover, and that the improvements (public improvements, common development improvements, site grading and paving) meet or exceed the minimum design requirements.

-As-Built Drawings: Each sheet of the record drawings shall be designated as "Engineering Record Drawings" and signed and dated by the engineer of record per ECM 5.10.6.C

-Please add notes to the storm facilities regarding the state of construction/outstanding issues.


Reviewed by:
Daniel Torres
danieltorres@elpasoco.com
12/15/2025 4:34:46 PM
EPC Stormwater Review
12/16/2025 4:56:50 PM
3 Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) along with Development Services comments (in blue text boxes) on the following uploaded documents:
- As-Built Construction Drawings

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
719.520.6877
ChristinaPrete@elpasoco.com
12/16/2025 4:56:50 PM
PCD Engineering Inspections
12/10/2025 8:40:24 AM
3 No comments from Inspections 12/10/2025 8:40:24 AM
EPC DPW Asset Management
12/1/2025 10:45:48 AM
3 Please update the CAD so that it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
12/1/2025 10:45:48 AM
View EPC Stormwater Review
2/15/2024 2:34:56 PM
2 As-Built Construction Drawings 2/15/2024 2:34:56 PM
EPC Stormwater Review
2/15/2024 2:33:02 PM
2 Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Construction Drawings

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
2/15/2024 2:33:02 PM
PCD Engineering Division
2/8/2024 2:51:15 PM
2 Development engineering has no comments. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com
2/8/2024 2:51:15 PM
View EPC Stormwater Review
12/20/2023 9:24:23 AM
1 As-Built Construction Drawings 12/20/2023 9:24:23 AM
EPC Stormwater Review
12/19/2023 12:31:01 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Construction Drawings

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
12/19/2023 12:31:01 PM
PCD Engineering Division
12/12/2023 5:19:49 PM
1 Engineering has no comments. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com
12/12/2023 5:19:49 PM