Project Name
Security Water District COM
Description
Security Water District is proposing a new building at their site. Same use, smaller building compared to previously approved building, see aasi192
Location
Parcels
6502000138 6502000138
Applicant
Security Water and Sanitation Districts
Roy E Heald ( r.heald@securitywsd.com )
(719) 392-3475
Roy E Heald ( r.heald@securitywsd.com )
(719) 392-3475
File Number
COM2516
Project Manager
Kylie Bagley
Status
Active
Created
6/13/2023 10:05:57 AM

View: Project Documents



Review Comments (6)

Link Agency Comment
EPC DPW Stormwater
7/30/2025 5:14:53 PM
After reviewing the submitted documents it appears there will be over an acre of disturbance with this project. This means that a stormwater permit (ESQCP) is required. If it can be proven that the project will remain under an acre of disturbance, then an ESQCP will no longer be required.

It also appears that the development proposed with this site also puts the property at over 1 acre of added imperviousness/disturbance (Asphalt, buildings, compacted gravel, etc.) since 2008, which means a Permanent Control Measure (i.e. extended detention basin, sand filter basin, etc.) may be required. Document disturbed area and any applicable exclusions in the PCM Applicability form to see if a PCM is required.

Given the lack of documentation, the decision to ask for an ESQCP was made with some uncertainty. Once a Drainage Letter and Site Development Plan are submitted I will have a more accurate idea of what will be required. I would recommend we call before next submittal.

See El Paso County's stormwater site for more details: https://publicworks.elpasoco.com/stormwater/

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Drainage Letter (Required regardless of an ESQCP)
- ESQCP Form
- FAE Form
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist

PCM Docs (Required if a PCM is needed)
- PCM O&M Manual
- PCM Maintenance Agreement
- PCM - MHFD Detention Calcs or SDI Form


Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
7/30/2025 5:14:53 PM
View PCD Project Manager
7/30/2025 8:16:06 AM
Letter of Intent Redlines 7/30/2025 8:16:06 AM
View PCD Project Manager
7/30/2025 8:15:48 AM
Site Development Plan Redlines 7/30/2025 8:15:48 AM
PCD Project Manager
7/30/2025 8:15:15 AM
Project type will change from a COM to a PPR due to the fact that there is no previous PPR on file. The project will still be an administrative review.

The planning department has comments on the following documents:
V1 Site Development Plan
V1 Letter of Intent

Comments in green are from planner, comments in blue are from engineering.
7/30/2025 8:15:15 AM
View PCD Engineering Division
7/29/2025 5:33:02 PM
Engineering Review Ver. 1

Please see engineering review comments on the following documents

Note PCD may change this to a Site Development Plan (PPR) versus a COM.
Please update all the documents with the new PPR # prefix as assigned from Planning Dept
There is no approved site development plan completed after the 1041 under PCD file AASI192 was approved.
A driveway access permit is required. None on file
EPC Road Impact fees are applicable for the new addition. See comments on LOI
A drainage letter is required. The drainage report provided with AASI192 was not a completed drainage report or letter.

LOI_V1 Uploaded by PCD
SDP_V1 Uploaded by PCD
Drainage Letter- required


Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://planningdevelopment.elpasoco.com/
7/29/2025 5:33:02 PM
Security Fire Protection District
7/16/2025 11:36:51 AM
The Security Fire Department has no objections to this plan as described. Please, during the PPRBD plan review, please indicate what the building is to be used for. MAS for SFD 7/16/2025 11:36:51 AM