Project Review Comments

Back to List


File Number
CDR234
Project Name
Rolling Meadows Channel
Description
60 % design first review- Meets City/County criteria
Parcels
5500000324 5500000324
Applicant
Core Engineering Group
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
File Number
CDR234
Project Manager
Kari Parsons
Status
Active
Created
2/6/2023 10:28:20 AM

View: Project Documents



Review Comments (27)

Link Agency Review # Comment
View PCD Engineering Division
3/4/2026 6:15:04 PM
4 Channel CD Redlines 3/4/2026 6:15:04 PM
View PCD Engineering Division
3/4/2026 6:09:44 PM
4 HEC-RAS Redlines 3/4/2026 6:09:44 PM
View PCD Engineering Division
3/4/2026 6:09:21 PM
4 GEC Plan Redlines 3/4/2026 6:09:21 PM
View PCD Engineering Division
3/4/2026 6:07:30 PM
4 Channel Design Report Redlines 3/4/2026 6:07:30 PM
View PCD Engineering Division
3/4/2026 6:06:52 PM
4 Deviation Request Redlines 3/4/2026 6:06:52 PM
PCD Engineering Division
3/4/2026 6:03:04 PM
4 The following items need to be revised and resubmitted for 90% review:
- Deviation Request
- Channel Design Report
- Channel CDs
- GEC Plan
- HEC-RAS information if not in report


Note: Full detailed review cannot be completed without Deviation Request being set. Based on comments provided on deviation request, additional comments may be generated on next review.

-- Charlene Durham - 719-520-7951
-- Jeff Rice - 719-520-7877
3/4/2026 6:03:04 PM
Black Hills Energy-Aquila
2/26/2026 4:05:01 PM
4 No comment 2/26/2026 4:05:01 PM
EPC Stormwater Review
2/27/2026 11:03:07 AM
4 Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs.......................(to be uploaded with Development Services comments)
- GEC Plan...............(to be uploaded with Development Services comments)

Please provide the following document(s) upon resubmittal
- ESQCP (the ESQCP Application will need to be included with project approval. The contractor information can be left blank and filled in at the pre-construction meeting)
- FAE
- PCM Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
719.520.6877
ChristinaPrete@elpasoco.com
2/27/2026 11:03:07 AM
View Xcel Energy
2/17/2026 9:27:31 AM
4 2/17/2026 9:27:31 AM
RBD Floodplain
2/5/2026 7:55:32 AM
4 This project is follows approved FEMA CLOMR 24-08-0597R-080060, no further comment . 2/5/2026 7:55:32 AM
View EPC Stormwater Review
6/1/2023 12:53:06 PM
3 Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plans............(uploaded with PCD comments)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
6/1/2023 12:53:06 PM
View PCD Engineering Division
5/26/2023 1:53:02 PM
3 (HEC-RAS output redlines) 5/26/2023 1:53:02 PM
View PCD Engineering Division
5/26/2023 1:52:23 PM
3 (60% design plans redlines) 5/26/2023 1:52:23 PM
View PCD Engineering Division
5/26/2023 1:51:25 PM
3 (Design report redlines) 5/26/2023 1:51:25 PM
View PCD Engineering Division
5/26/2023 1:54:21 PM
3 The following items need to be revised and resubmitted for 90% review:
- Channel Design Report
- Channel CDs
- GEC Plan (see previous redlines)
- HEC-RAS information if not in report

Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width.

Regarding the CSWMP, if this is for the whole project the title should be revised to reflect that.

There are no comments on the cost estimates or CSWMP at this time.

A final submittal checklist is attached.


-- Jeff Rice - 719-520-7877
5/26/2023 1:54:21 PM
View PCD Engineering Division
4/19/2023 11:42:21 AM
2 (GEC Plan redlines) 4/19/2023 11:42:21 AM
View PCD Engineering Division
4/19/2023 11:39:24 AM
2 (CD redlines) 4/19/2023 11:39:24 AM
View PCD Engineering Division
4/19/2023 11:37:37 AM
2 (Design report redlines) 4/19/2023 11:37:37 AM
View PCD Engineering Division
4/19/2023 11:34:44 AM
2 The following items need to be revised and resubmitted (see redlines):
- Channel Design Report
- Channel CDs
- GEC Plan

Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width.

A final submittal checklist will be provided with the next review or can be provided sooner if needed to complete the next submittal.

Comment log is attached (link at left).

-- Jeff Rice - 719-520-7877
4/19/2023 11:34:44 AM
EPC Stormwater Review
4/12/2023 1:08:56 PM
2 Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plans...... .......(to be uploaded with PCD comments)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
4/12/2023 1:08:56 PM
RBD Floodplain
3/22/2023 3:10:28 PM
2 As acknowledged in the Channel Design Report , Section "Previous Reports and Jurisdictional Requirements" Subsection "B FEMA Regulations & Floodplain Development"; an approved CLOMR issued by FEMA as well as a local floodplain permit through the regional floodplain office is required prior to commencement of site work. 3/22/2023 3:10:28 PM
View PCD Engineering Division
3/2/2023 2:57:52 PM
1 (GEC Plan redlines) 3/2/2023 2:57:52 PM
View PCD Engineering Division
3/2/2023 2:50:51 PM
1 (Channel CDs redlines) 3/2/2023 2:50:51 PM
View PCD Engineering Division
3/2/2023 2:48:12 PM
1 (Channel design report redlines) 3/2/2023 2:48:12 PM
PCD Engineering Division
3/2/2023 2:46:58 PM
1 The following items need to be revised and resubmitted:
- Channel Design Report
- Channel CDs
- GEC Plan

Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width.

Regarding the CSWMP, if this is for the whole project the title should be revised to reflect that.

There are no comments on the cost estimates or CSWMP at this time.

A final submittal checklist will be provided with the next review or can be provided sooner if needed to complete the next submittal.


-- Jeff Rice - 719-520-7877
3/2/2023 2:46:58 PM
EPC Stormwater Review
3/1/2023 5:57:10 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- 60% Design Plans..........(to be uploaded with PCD comments)
- 60% GEC Plans...... .......(to be uploaded with PCD comments)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
3/1/2023 5:57:10 PM
RBD Floodplain
2/8/2023 8:34:18 AM
1 As acknowledged in the Channel Design Report , Section "Previous Reports and Jurisdictional Requirements" Subsection "B FEMA Regulations & Floodplain Development"; an approved CLOMR issued by FEMA as well as a local floodplain permit through the regional floodplain office is required prior to commencement of site work. 2/8/2023 8:34:18 AM