Project Review Comments
- File Number
- CDR234
- Project Name
- Rolling Meadows Channel
- Description
- 60 % design first review- Meets City/County criteria
- Parcels
- 5500000324 5500000324
- Applicant
-
Core Engineering Group
Richard Schindler ( rich@ceg1.com )
(719) 659-7800 Richard Schindler ( rich@ceg1.com )
(719) 659-7800 - File Number
- CDR234
- Project Manager
- Kari Parsons
- Status
- Active
- Created
- 2/6/2023 10:28:20 AM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
PCD Engineering Division
3/4/2026 6:15:04 PM |
4 | Channel CD Redlines | 3/4/2026 6:15:04 PM |
| View |
PCD Engineering Division
3/4/2026 6:09:44 PM |
4 | HEC-RAS Redlines | 3/4/2026 6:09:44 PM |
| View |
PCD Engineering Division
3/4/2026 6:09:21 PM |
4 | GEC Plan Redlines | 3/4/2026 6:09:21 PM |
| View |
PCD Engineering Division
3/4/2026 6:07:30 PM |
4 | Channel Design Report Redlines | 3/4/2026 6:07:30 PM |
| View |
PCD Engineering Division
3/4/2026 6:06:52 PM |
4 | Deviation Request Redlines | 3/4/2026 6:06:52 PM |
|
PCD Engineering Division
3/4/2026 6:03:04 PM |
4 |
The following items need to be revised and resubmitted for 90% review: - Deviation Request - Channel Design Report - Channel CDs - GEC Plan - HEC-RAS information if not in report Note: Full detailed review cannot be completed without Deviation Request being set. Based on comments provided on deviation request, additional comments may be generated on next review. -- Charlene Durham - 719-520-7951 -- Jeff Rice - 719-520-7877 |
3/4/2026 6:03:04 PM | |
|
Black Hills Energy-Aquila
2/26/2026 4:05:01 PM |
4 | No comment | 2/26/2026 4:05:01 PM | |
|
EPC Stormwater Review
2/27/2026 11:03:07 AM |
4 |
Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - CDs.......................(to be uploaded with Development Services comments) - GEC Plan...............(to be uploaded with Development Services comments) Please provide the following document(s) upon resubmittal - ESQCP (the ESQCP Application will need to be included with project approval. The contractor information can be left blank and filled in at the pre-construction meeting) - FAE - PCM Applicability Form Reviewed by: Christina Prete, P.E. Stormwater Manager 719.520.6877 ChristinaPrete@elpasoco.com |
2/27/2026 11:03:07 AM | |
| View |
Xcel Energy
2/17/2026 9:27:31 AM |
4 | 2/17/2026 9:27:31 AM | |
|
RBD Floodplain
2/5/2026 7:55:32 AM |
4 | This project is follows approved FEMA CLOMR 24-08-0597R-080060, no further comment . | 2/5/2026 7:55:32 AM | |
| View |
EPC Stormwater Review
6/1/2023 12:53:06 PM |
3 |
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - GEC Plans............(uploaded with PCD comments) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
6/1/2023 12:53:06 PM |
| View |
PCD Engineering Division
5/26/2023 1:53:02 PM |
3 | (HEC-RAS output redlines) | 5/26/2023 1:53:02 PM |
| View |
PCD Engineering Division
5/26/2023 1:52:23 PM |
3 | (60% design plans redlines) | 5/26/2023 1:52:23 PM |
| View |
PCD Engineering Division
5/26/2023 1:51:25 PM |
3 | (Design report redlines) | 5/26/2023 1:51:25 PM |
| View |
PCD Engineering Division
5/26/2023 1:54:21 PM |
3 |
The following items need to be revised and resubmitted for 90% review: - Channel Design Report - Channel CDs - GEC Plan (see previous redlines) - HEC-RAS information if not in report Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width. Regarding the CSWMP, if this is for the whole project the title should be revised to reflect that. There are no comments on the cost estimates or CSWMP at this time. A final submittal checklist is attached. -- Jeff Rice - 719-520-7877 |
5/26/2023 1:54:21 PM |
| View |
PCD Engineering Division
4/19/2023 11:42:21 AM |
2 | (GEC Plan redlines) | 4/19/2023 11:42:21 AM |
| View |
PCD Engineering Division
4/19/2023 11:39:24 AM |
2 | (CD redlines) | 4/19/2023 11:39:24 AM |
| View |
PCD Engineering Division
4/19/2023 11:37:37 AM |
2 | (Design report redlines) | 4/19/2023 11:37:37 AM |
| View |
PCD Engineering Division
4/19/2023 11:34:44 AM |
2 |
The following items need to be revised and resubmitted (see redlines): - Channel Design Report - Channel CDs - GEC Plan Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width. A final submittal checklist will be provided with the next review or can be provided sooner if needed to complete the next submittal. Comment log is attached (link at left). -- Jeff Rice - 719-520-7877 |
4/19/2023 11:34:44 AM |
|
EPC Stormwater Review
4/12/2023 1:08:56 PM |
2 |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - GEC Plans...... .......(to be uploaded with PCD comments) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
4/12/2023 1:08:56 PM | |
|
RBD Floodplain
3/22/2023 3:10:28 PM |
2 | As acknowledged in the Channel Design Report , Section "Previous Reports and Jurisdictional Requirements" Subsection "B FEMA Regulations & Floodplain Development"; an approved CLOMR issued by FEMA as well as a local floodplain permit through the regional floodplain office is required prior to commencement of site work. | 3/22/2023 3:10:28 PM | |
| View |
PCD Engineering Division
3/2/2023 2:57:52 PM |
1 | (GEC Plan redlines) | 3/2/2023 2:57:52 PM |
| View |
PCD Engineering Division
3/2/2023 2:50:51 PM |
1 | (Channel CDs redlines) | 3/2/2023 2:50:51 PM |
| View |
PCD Engineering Division
3/2/2023 2:48:12 PM |
1 | (Channel design report redlines) | 3/2/2023 2:48:12 PM |
|
PCD Engineering Division
3/2/2023 2:46:58 PM |
1 |
The following items need to be revised and resubmitted: - Channel Design Report - Channel CDs - GEC Plan Provide deviation request(s) as needed for channel design attributes including low-flow channel bottom width. Regarding the CSWMP, if this is for the whole project the title should be revised to reflect that. There are no comments on the cost estimates or CSWMP at this time. A final submittal checklist will be provided with the next review or can be provided sooner if needed to complete the next submittal. -- Jeff Rice - 719-520-7877 |
3/2/2023 2:46:58 PM | |
|
EPC Stormwater Review
3/1/2023 5:57:10 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - 60% Design Plans..........(to be uploaded with PCD comments) - 60% GEC Plans...... .......(to be uploaded with PCD comments) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
3/1/2023 5:57:10 PM | |
|
RBD Floodplain
2/8/2023 8:34:18 AM |
1 | As acknowledged in the Channel Design Report , Section "Previous Reports and Jurisdictional Requirements" Subsection "B FEMA Regulations & Floodplain Development"; an approved CLOMR issued by FEMA as well as a local floodplain permit through the regional floodplain office is required prior to commencement of site work. | 2/8/2023 8:34:18 AM |
EDARP