Project Review Comments

Back to List


Project Name
Falcon Marketplace
Description
Final Plat for 11 commercial lots , two detention tracts, and the Eastonville connection through the site.
Location
Northwest corner of Woodmen Road and Meridian Road
Parcels
5300000589 5300000589 5301401052 5301401052 5301401324 5301401324 5301401326 5301401326 5301401327 5301401327 5301401329 5301401329 5301402001 5301402001 5301402002 5301402002 5301403001 5301403001 5301403003 5301403003 5301403004 5301403004 5301403005 5301403005 5301403006 5301403006
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
EA Number
SP-17-001
File Number
SF191
Project Manager
Kari Parsons
Status
Active
Created
7/31/2018 3:16:14 PM

View: Project Documents



Review Comments (121)

Link Agency Comment
Upper Black Squirrel Creek GWMD
10/15/2024 11:46:32 AM
Falcon Marketplace - UBSC GWMD comments on final plat
1. The UBSCGWMD is charged with sustainable management of the critical groundwater resource in the underlying Black Squirrel alluvial aquifer. The District is concerned that the documentation for this project does not include any information /data on groundwater. The Black Squirrel aquifer is acritical groundwater resource. In this area is the aquifer recharged by precipitation and snowmelt. This recharge is critical for maintaining sustainable flow downgradient in the Black Squirrel alluvial aquifer. Data should be presented regarding the depth to groundwater at multiple locations across the 37 acre property.
2. The potential occurrence of shallow groundwater beneath the proposed development presents geotechnical problems. Construction of the development may perturb the groundwater flow system and could alter the flowpaths and the spatial recharge pattern. This needs to be considered before construction proceeds.
3. Diversion of storm water to Black Squirrel Creek will prevent or modify recharge to the underlying Black Squirrel. Again, this may perturb the groundwater flow system and impact downgradient groundwater users.
10/15/2024 11:46:32 AM
PCD Project Manager
10/2/2024 8:18:49 AM
Please work with the Engineering staff. 10/2/2024 8:18:49 AM
EPC Stormwater Review
10/1/2024 3:33:34 PM
EPC has no comments on the submitted documents. Please see PCD Engineering Division EDARP comment provided by Elizabeth Nijkamp.

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
ChristinaPrete@elpasoco.com
10/1/2024 3:33:34 PM
PCD Engineering Division
10/1/2024 3:04:39 PM
El Paso County acknowledges the receipt of this design to reduce the hydrostatic pressure occurring on the outside of the 96" pipe in question. While this may totally eliminate the water from entering at the joints, the water will still run through the pipe and the life expectancy of the pipe is reduced with no real measurable way to quantify the reduction of life.

Acknowledgement of these vales by EPC is not an approval to pipe subsurface water into a storm drain system. Approval from the appropriate groundwater authority is still required.

The bedding stability and compaction should be evaluated during the valve install process to assure that the bedding has not been compromised.

El Paso County will not accept ownership and maintenance of this facility. This will require a maintenance agreement to submitted to the County.

Comment by E. Nijkamp
10/1/2024 3:04:39 PM
Falcon School District 49
9/17/2024 1:28:02 PM
District 49 does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 9/17/2024 1:28:02 PM
PCD Engineering Division
1/11/2022 10:41:38 AM
The stop sign revision is acceptable and may be shown on as-built plans. After discussion, the crosswalks do not need to be revised.

-- Jeff Rice - 719-520-7877
1/11/2022 10:41:38 AM
Woodmen Road Metro
12/22/2021 11:59:27 AM
This proposed project is located within the Woodmen Road Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries.

The fees for this year are as follows:
Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial:
Destination/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
12/22/2021 11:59:27 AM
View PCD Engineering Division
10/20/2020 1:10:15 PM
The CDs have been forwarded for signature; see comment letter for tracking of remaining ongoing items. 10/20/2020 1:10:15 PM
PCD Project Manager
10/14/2020 3:51:24 PM
The lighting plan summitted is one sheet, it does not not have the details for the fixtures. It also does not show the lighting on the ROW, roundabouts. Provide the whole plan set for lighting meeting the Code. 10/14/2020 3:51:24 PM
PCD Project Manager
9/18/2020 7:01:14 AM
Please Modify the light pole design to be compliant with the Land Development Code. The height limit for fixtures is 20-feet. A variance would be required to exceed the height as identified in Chapter 6, 6.2.3 Section of the Land Development Code. A hardship would need to be identified to the Board of Adjustment. An EA ($427.00) is required to initiate that application. a non-refundable fee of $1050.00 is required for a BOA hearing, which meets once a month. Staff does not support the height variance due to the residential development to the west, north, and east. Please modify all plans, including site development plans to be compliant with the Code. Please work with future lot owners to require Code compliance.


https://library.municode.com/co/el_paso_county/codes/land_development_code?nodeId=CH6GEDEST_6.2DESTANFAAC
9/18/2020 7:01:14 AM
View PCD Engineering Division
9/17/2020 12:18:58 PM
(GEC redline sheets) 9/17/2020 12:18:58 PM
View PCD Engineering Division
9/17/2020 12:18:22 PM
(CD redline sheets) 9/17/2020 12:18:22 PM
View PCD Engineering Division
9/17/2020 12:17:47 PM
(Photometric redlines) 9/17/2020 12:17:47 PM
View PCD Engineering Division
9/17/2020 12:16:48 PM
(CDOT lighting guide page for information) 9/17/2020 12:16:48 PM
View PCD Engineering Division
9/17/2020 12:12:33 PM
See comment letter and redlines.

The following documents need to be resubmitted:
1. CDs (with overall GEC Plan)
2. Updated EGP GEC Plan set (with signatures and stamps on the updated sheets)
3. Revised photometric plan (also see Planning comments regarding light pole height)
9/17/2020 12:12:33 PM
PCD Project Manager
8/20/2020 5:30:40 PM
Please coordinate your progress and timelines with Kingsoopers. Please provide an update on status of LOMR. 8/20/2020 5:30:40 PM
View PCD Engineering Division
8/20/2020 3:53:50 PM
(CD redlines summary) 8/20/2020 3:53:50 PM
View PCD Engineering Division
8/20/2020 3:53:20 PM
(CD redlines) 8/20/2020 3:53:20 PM
View PCD Engineering Division
8/20/2020 4:06:24 PM
See comment letter and redlines.

Items necessary for resubmittal:
- Owner agreement
- FHMD agreement
- CDs - signed and stamped
- TIS - signed and stamped
- GEC Plan - signed and stamped
- ESQCP - signed and stamped
- Groundwater monitoring plan
- Roundabout Lighting plan if available

-- Jeff Rice - 719-520-7877
8/20/2020 4:06:24 PM
Upper Black Squirrel Creek GWMD
8/19/2020 3:11:30 PM
The Upper Black Squirrel Creek GWMD does not have any issues with the plan but does have concerns regarding the detention ponds and holding water that is recharge to the alluvial aquifer of the Upper Black Squirrel Basin. How will this water be released for recharge and how do you avoid holding water for over 72 hours which is what is allowed? Will there be under-drains? If yes, the district would like to see a map of where those under-drains will be and where the water will be going to as that is also recharge to the basin. 8/19/2020 3:11:30 PM
Falcon Fire Protection District
8/19/2020 9:50:10 AM
no new or added comments by Falcon Fire 8/19/2020 9:50:10 AM
Pikes Peak Regional Building Department
8/18/2020 8:16:44 AM
Regarding a request for approval of a final plat for Falcon Marketplace, Enumerations has no further comments.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
8/18/2020 8:16:44 AM
EPC Stormwater Review
8/13/2020 4:30:19 PM
Stormwater has no additional comments. 8/13/2020 4:30:19 PM
Mountain View Electric Association, Inc.
8/5/2020 11:45:28 AM
Thank you for the opportunity to review this project. No additional comments at this time.
Cathy
Mountain View Electric Association, Inc.
8/5/2020 11:45:28 AM
RBD Floodplain
7/31/2020 1:12:47 PM
site work for this project was approved under floodplain permit number 18086.
No structures will be permitted prior to LOMR becoming effective.
7/31/2020 1:12:47 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/29/2020 2:51:08 PM
Recommend approval - comments have not been addressed but since the Plat has already been recorded, the change cannot be made.
-Kyle Schelhaas, 719-668-8126, kschelhaas@csu.org
7/29/2020 2:51:08 PM
RBD Floodplain
7/28/2020 3:17:31 PM
previous comment not addressed 7/28/2020 3:17:31 PM
Colorado Springs Public Works
4/22/2020 9:08:42 AM
Stormwater Enterprise (SWENT) has no comments

Anna Bergmark
Stormwater Enterprise
City of Colorado Springs
30 S. Nevada Ave., Suite 401
Colorado Springs, CO 80901
(719) 385-5613 office
(719) 619-9427 Cell
Anna.Bergmark@coloradosprings.gov
4/22/2020 9:08:42 AM
PCD Project Manager
4/22/2020 8:40:33 AM
Please address comments and upload revised, signed and stamped docs. Please submit the driveway permit application form (from our website for the right in right out access off Woodmen Road 4/22/2020 8:40:33 AM
View PCD Engineering Division
4/21/2020 10:18:04 PM
(SWMP Checklist redlines) 4/21/2020 10:18:04 PM
View PCD Engineering Division
4/21/2020 10:17:10 PM
(GEC Checklist redlines) 4/21/2020 10:17:10 PM
View PCD Engineering Division
4/21/2020 10:16:24 PM
(GEC redline summary) 4/21/2020 10:16:24 PM
View PCD Engineering Division
4/21/2020 10:15:41 PM
(CD redlines summary) 4/21/2020 10:15:41 PM
View PCD Engineering Division
4/21/2020 10:15:00 PM
(CD redlines) 4/21/2020 10:15:00 PM
View PCD Engineering Division
4/21/2020 10:13:44 PM
See comment letter and redlines. 4/21/2020 10:13:44 PM
Colorado Springs Planning & Community Development
4/14/2020 9:03:17 AM
The Colorado Springs Comprehensive Planning Division has no specific comments on this application 4/14/2020 9:03:17 AM
Colorado Springs Public Works
4/8/2020 2:07:15 PM
Traffic Engineering has the following comment:

Since annexing Golden Sage Road to the city will be part of the Banning Lewis Ranch development, the city recommends allowing right-in/right out access along Woodmen Road to minimize traffic impact on Golden Sage Road/Woodmen Frontage Road intersection.

Zaker Alazzeh, P.E.
Traffic Engineering Manager
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
4/8/2020 2:07:15 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/7/2020 11:07:04 AM
CSU did not recommend approval on this plat as there are several issues with the easements not closing. However, the Plat has already been recorded and any further comments by Colorado Springs Utilities will not have any bearing as the plat cannot be changed. Colorado Springs Utilities does need any further review for this plat. Please let me know if there are questions.

Please add the following block statement to the Construction Drawings: Please add the following easement note: All easements shown or dedicated hereon for public utility purposes shall be subject to those terms and conditions as specified in the instrument recorded at Reception No. 212112548 of the records of El Paso County, Colorado. All other easements or interests of records affecting any of the platted property depicted hereon shall not be affected and shall remain in full force and effect.

-Kyle Schelhaas, 719-668-8126, kschelhaas@csu.org
4/7/2020 11:07:04 AM
Colorado Springs Public Works
4/2/2020 12:07:01 PM
Engineering Development Review Division (EDRD) has the following comment:
Has no comments on this item.

Patrick Morris
Public Works/Engineering Development Review Division
City of Colorado Springs
719-385-5075
Patrick.morris@coloradosprings.gov
4/2/2020 12:07:01 PM
RBD Floodplain
4/1/2020 2:08:59 PM
If subdivision proposals are located within three hundred (300) feet of a Zone A floodplain, FEMA approved base flood elevations and boundaries are required to be determined and shown on the plat, or provide a Floodplain Certification Letter by a professional engineer or architect licensed by the state of Colorado, stating that “Based on field verified characteristics of the property, the property is reasonably safe from flooding and to the best of the engineer’s knowledge if the 100-year floodplain were studied it would not enter the property in question”. 4/1/2020 2:08:59 PM
View US Postal Service
3/26/2020 8:19:39 AM
Contact Peyton Post Office
angela.d.connell@usps.gov
3/26/2020 8:19:39 AM
View PCD Engineering Division
2/4/2020 11:49:42 AM
(full CD redlines) 2/4/2020 11:49:42 AM
View PCD Engineering Division
1/10/2020 8:53:50 AM
SWMP redlines summary 1/10/2020 8:53:50 AM
View PCD Engineering Division
1/10/2020 8:53:16 AM
SWMP Checklist redlines 1/10/2020 8:53:16 AM
View PCD Engineering Division
1/10/2020 8:52:44 AM
GEC Checklist redlines (partial) 1/10/2020 8:52:44 AM
View PCD Engineering Division
1/10/2020 8:52:06 AM
CD redlines summary 1/10/2020 8:52:06 AM
View PCD Engineering Division
1/10/2020 8:48:53 AM
See comment letter and redlines. 1/10/2020 8:48:53 AM
View EPC Health Department
11/21/2019 4:50:30 PM
11/21/2019 4:50:30 PM
View PCD Engineering Division
11/1/2019 12:45:47 PM
See comment letter. 11/1/2019 12:45:47 PM
View PCD Engineering Division
10/14/2019 9:15:13 AM
(PBMP App redlines) 10/14/2019 9:15:13 AM
View PCD Engineering Division
10/14/2019 9:14:32 AM
(FAE redlines) 10/14/2019 9:14:32 AM
View PCD Engineering Division
10/14/2019 9:13:48 AM
(LS plan redlines) 10/14/2019 9:13:48 AM
View PCD Engineering Division
10/14/2019 9:12:56 AM
(CD redlines summary) 10/14/2019 9:12:56 AM
View PCD Engineering Division
10/14/2019 9:11:49 AM
(CD redlines) 10/14/2019 9:11:49 AM
View PCD Engineering Division
10/14/2019 9:11:03 AM
(FDR1 redlines) 10/14/2019 9:11:03 AM
View PCD Engineering Division
10/14/2019 9:10:20 AM
(FDR2 redlines summary) 10/14/2019 9:10:20 AM
View PCD Engineering Division
10/14/2019 9:09:10 AM
(FDR redlines) 10/14/2019 9:09:10 AM
View PCD Engineering Division
10/14/2019 9:08:02 AM
(LOI redlines) 10/14/2019 9:08:02 AM
View PCD Engineering Division
10/14/2019 9:07:20 AM
See comment letter and redlines. 10/14/2019 9:07:20 AM
Pikes Peak Regional Building Department
10/8/2019 8:47:42 AM
Regarding a request for approval of a final plat for Falcon Marketplace, Enumerations has the following comments:

1. Our understanding was that the entry drive between lots 4 & 5 was to be unnamed. It now shows the street name of Falcon Market Place. This should be removed.
2. Previous comments were not addressed and still apply.


Floodplains previous comments still apply.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
10/8/2019 8:47:42 AM
View PCD Project Manager
10/7/2019 9:57:58 AM
Plat redlines- Legal is not correct. BoCC Signature needs to be combined into Director signature due to administrative plat approval; the Chair will not sign. 10/7/2019 9:57:58 AM
View PCD Project Manager
10/7/2019 9:53:05 AM
The BoCC approved the revision to the preliminary plan Resolution (old 18-387) 19-357 allowing for this plat to be approved administratively on September 10th, 2019. 10/7/2019 9:53:05 AM
PCD Project Manager
10/7/2019 9:46:46 AM
Please provide documentation from the Floodplain Admin. allowing the plat recordation for the commercial lots. Please provide documentation (email ok) that CSU and the Water/WW District has comments resolved. 10/7/2019 9:46:46 AM
PCD Project Manager
10/7/2019 9:44:02 AM
Provide a sheet two for the round-a-bout landscape details only to address the sight distance in the ECM.
A FAE shall be included for these round-a-bout landscape improvements associated with the subdivision construction drawings. The remaining landscaping does NOT need to be included in the FAE for the overall development because it will be included at the individual lot development phase.
Please note that this landscape plan does not meet the Chapter six Code requirements. It does establish a base line design for consistency throughout the commercial center development. At the time of the site development plan, each lot will be required to be in compliance with the Code.
10/7/2019 9:44:02 AM
Falcon Fire Protection District
10/4/2019 10:10:19 AM
Falcon Fire has no new comments or requirements on this project. 10/4/2019 10:10:19 AM
Woodmen Hills Metro
9/26/2019 1:29:33 PM
Woodmen Hills Metropolitan District has agreed with the developer that the water and sewer utility plans would be finalized when a tenant for Lot 2 was acquired. The utility plans are not complete, the water line must loop on the west and north side of Lot 2 with additional fire hydrants and sewer must be extended to serve Lot 1 & 2. The rest of the utility plan is as per WHMD specifications. 9/26/2019 1:29:33 PM
County Attorney - Development Review
9/23/2019 10:43:27 AM
Regarding the ROW & Drainage Easements:
1. It has long been the County's policy to require fee simple title rather than easements for ROW. Please confirm with the County Engineer that an easement is acceptable.
2. The County is prohibited by law from indemnifying other entities. The last sentence of the first paragraph of Section 3 and all of Section 4 must be deleted.
3. Please add a provision to each document that the Grantor will make no use of the Easement area, nor grant any other interest in the property, that would interfere with the Grantee's use of the easement.
4. In paragraph 2 of Section 3, please clarify that any existing fencing that would interfere with the Grantee's Improvements will be built adjacent to or as near as practicable to such Improvements.
9/23/2019 10:43:27 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/20/2019 2:58:20 PM
Please see attached memo for comments on the Plat. Please call Kyle Schelhaas at 719-668-8126 with any questions. 9/20/2019 2:58:20 PM
RBD Floodplain
9/17/2019 1:10:12 PM
this plat cannot be recorded until the effective date of the LOMR removing this parcel from the floodplain. 9/17/2019 1:10:12 PM
EPC Health Department
9/4/2019 3:19:23 PM
See comments submitted 30Jan2019. 9/4/2019 3:19:23 PM
PCD Project Manager
8/12/2019 10:39:14 AM
The line work on the landscape plan is still not clear as to what is the existing property lines, ROW to be dedicated and preservation area. 8/12/2019 10:39:14 AM
View PCD Engineering Division
8/9/2019 2:32:23 PM
(Draft PDB/BMP Agreement) 8/9/2019 2:32:23 PM
View PCD Engineering Division
8/9/2019 2:31:39 PM
(FAE redlines) 8/9/2019 2:31:39 PM
View PCD Engineering Division
8/9/2019 2:31:05 PM
(CDs redlines) 8/9/2019 2:31:05 PM
View PCD Engineering Division
8/9/2019 2:29:34 PM
(FDR redlines) 8/9/2019 2:29:34 PM
View PCD Engineering Division
8/9/2019 2:28:08 PM
(Plat redlines) 8/9/2019 2:28:08 PM
View PCD Engineering Division
8/9/2019 2:27:01 PM
See comment letter and redlines. 8/9/2019 2:27:01 PM
Pikes Peak Regional Building Department
8/2/2019 9:03:47 AM
Regarding a request for approval of a final plat for Falcon Marketplace, Enumerations has the following comments:

1. The address assigned for Lot 1 appears on Lot 2 and needs to be moved.
2. Previous comments apply


Floodplain has the following comments:

1. Comments from the previous round of comments still apply. The FEMA FIRM panel number and effective date have not been updated.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
8/2/2019 9:03:47 AM
Falcon Fire Protection District
7/30/2019 2:28:15 PM
Falcon Fire has no addition comments to add to original review notes. 7/30/2019 2:28:15 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/30/2019 12:04:53 PM
Additional review required, please see attached memo and plan markup for comments. Contact Kyle Schelhaas at 719-668-8126 or kschelhaas@csu.org with any questions. 7/30/2019 12:04:53 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/30/2019 12:04:02 PM
7/30/2019 12:04:02 PM
Woodmen Road Metro
7/25/2019 10:15:56 AM
The property is within the Woodmen Road Metropolitan District and subject to the mill levy, platting and building permit fees of the District. No objection to this action. 7/25/2019 10:15:56 AM
911 Authority - El Paso/Teller County
7/23/2019 11:21:41 AM
No additional comments 7/23/2019 11:21:41 AM
View EPC County Attorney's Office
7/23/2019 10:06:36 AM
1. Changes to the Detention Maintenance Agreement are attached. The Letter of Intent states, however, that maintenance of the BMPs is to be the responsibility of a Business Association. If that's the case, then this is the wrong Agreement template. Please advise who will be maintaining the two BMPs.

2. Remove the document uploaded as "Development Agreement." It is not necessary.

3. The wrong document has been uploaded as the "PDB/BMP O&M Manual"

4. No changes to the proposed Subdivision Improvements Agreement. Once the blanks are filled in (for bond company and amount), please resubmit for final review.
7/23/2019 10:06:36 AM
View PCD Project Manager
7/22/2019 10:18:34 AM
LOI Redlines V_2 7/22/2019 10:18:34 AM
View PCD Engineering Division
6/11/2019 12:23:08 PM
(FDR redlines) 6/11/2019 12:23:08 PM
View PCD Engineering Division
6/11/2019 12:22:13 PM
See comment letter and redlines. 6/11/2019 12:22:13 PM
PCD Project Manager
6/11/2019 10:58:20 AM
The Engineer will upload the Drainage Report Redlines and his review letter.
Please see the County Attorney's comments regarding the customized SIA (Development Agreement).
A review comment meeting is scheduled for Monday June 17th at 10:30am. A finding of water sufficiency was made at the time of preliminary plan based.
6/11/2019 10:58:20 AM
View PCD Project Manager
6/11/2019 10:55:56 AM
CDs Review No 2. 6/11/2019 10:55:56 AM
View PCD Project Manager
6/11/2019 10:55:00 AM
FAE Redlines No 2 6/11/2019 10:55:00 AM
View PCD Project Manager
6/11/2019 10:53:52 AM
Landscape Redlines No 2 6/11/2019 10:53:52 AM
View PCD Project Manager
6/11/2019 10:53:23 AM
Plat Redlines No 2 6/11/2019 10:53:23 AM
View EPC County Attorney's Office
6/10/2019 10:53:22 AM
Updated draft of SIA attached. 6/10/2019 10:53:22 AM
View Colorado Division of Water Resources
5/22/2019 9:27:12 AM
5/22/2019 9:27:12 AM
View Colorado Division of Water Resources
5/22/2019 9:26:24 AM
5/22/2019 9:26:24 AM
Upper Black Squirrel Creek GWMD
2/27/2019 10:10:25 AM
The Upper Black Squirrel Creek GWMD does not have any objections or comments at this time but reserves the right to comment in the future. 2/27/2019 10:10:25 AM
View PCD Engineering Division
2/26/2019 8:35:53 AM
(Final redlines - RAB packet) 2/26/2019 8:35:53 AM
View PCD Engineering Division
2/26/2019 8:35:21 AM
See roundabout packet redlines and comment letter. 2/26/2019 8:35:21 AM
View PCD Engineering Division
2/14/2019 7:05:58 PM
See comment letter and redlines. Roundabout design comments (which may affect the final plat and associated documents) will be provided separately and may follow a separate review and submittal track to expedite approvals. 2/14/2019 7:05:58 PM
View PCD Project Manager
2/14/2019 2:35:11 PM
Plat Redlines 1 2/14/2019 2:35:11 PM
View PCD Project Manager
2/14/2019 2:32:51 PM
Landscape Redlines ( trees are shown in the platted ROW) 2/14/2019 2:32:51 PM
View PCD Project Manager
2/14/2019 2:30:51 PM
CD's redlines (does not include round a bout). 2/14/2019 2:30:51 PM
View PCD Project Manager
2/14/2019 2:29:18 PM
FAE Redlines 1 2/14/2019 2:29:18 PM
View PCD Project Manager
2/14/2019 2:28:28 PM
Drainage Report Redlines 1 2/14/2019 2:28:28 PM
View PCD Project Manager
2/14/2019 2:27:57 PM
Letter of Intent Redlines 1 2/14/2019 2:27:57 PM
PCD Project Manager
2/14/2019 2:27:16 PM
Please upload a water and wastewater commitment that is dated within a year of the resubmittal (2019).
Please provided the BMP documentation that has been submitted elsewhere.
Please note Jeff Rice PE will upload the redlines for the round a bout at a later date as he is still reviewing the CDs.
Staff will have an internal meeting to draft the development agreement and then send you a copy to accept.
2/14/2019 2:27:16 PM
US Postal Service
2/14/2019 9:41:06 AM
please contact the Peyton Postmaster - Angela Connell - angela.d.connell@usps.gov 2/14/2019 9:41:06 AM
View EPC Health Department
1/30/2019 9:16:09 PM
1/30/2019 9:16:09 PM
Pikes Peak Regional Building Department
1/29/2019 8:28:54 AM
Regarding a request for approval of a final plat for Falcon Marketplace, Enumerations has the following comments:

1. Prior to recording, Enumerations will review the mylar for addressing, title block, street names and floodplain statement. A $10 per lot/tract addressed fee will be due at the time of mylar review.
2. Provide a copy of the final recorded plat for our records. Enumerations will not approve any building plans submitted without a copy of the final recorded plat in our records.


Floodplain has the following comments:

1. New FEMA FIRM panels recently became effective for El Paso County. The floodplain statement should be updated to show the new information: panel 08041C0575G with an effective date of December 7, 2018.
2. Per Regional Building Code, this plat cannot be recorded until the effective date of the LOMR removing this parcel from the floodplain.
3. Contact Floodplain Administrator Keith Curtis (keith@pprbd.org, 719-327-2898) with any questions or concerns regarding compliance with floodplain code.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
1/29/2019 8:28:54 AM
View Colorado Division of Water Resources
1/28/2019 12:05:17 PM
1/28/2019 12:05:17 PM
View Colorado Division of Water Resources
1/28/2019 12:04:43 PM
1/28/2019 12:04:43 PM
View Parks Advisory Board
1/25/2019 1:42:19 PM
El Paso County Community Services / Parks Final Comments (No PAB Endorsement Required) 1/25/2019 1:42:19 PM
View EPC Parks Department
1/25/2019 9:33:04 AM
El Paso County Community Services / Parks Final Comments 1/25/2019 9:33:04 AM
View Mountain View Electric Association, Inc.
1/23/2019 11:07:43 AM
1/23/2019 11:07:43 AM
View Falcon Fire Protection District
1/22/2019 2:21:34 PM
1/22/2019 2:21:34 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/17/2019 8:36:55 AM
1/17/2019 8:36:55 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/16/2019 8:16:53 AM
1/16/2019 8:16:53 AM
911 Authority - El Paso/Teller County
1/11/2019 11:33:39 AM
All street names previously approved.
Please note: Falcon Market Place signage should be placed at both the northeast and southwest roundabouts to indicate street name change after the bend in the road to avoid confusion.
Thank you
Justin
1/11/2019 11:33:39 AM
Woodmen Hills Metro
1/10/2019 1:29:24 PM
Woodmen Hills Metropolitan District has no utilities plan to review. 1/10/2019 1:29:24 PM
Woodmen Road Metro
1/9/2019 4:26:04 PM
In response to the proposed site it, this parcel is located in the Woodmen Road Metropolitan District
The purposed site will be subject to platting and building permit fees and future mill levy taxes.

WOODMEN ROAD METROPOLITAN DISTRICT
Platting fee will be $1540/Acre x 35.7(acres) = $54,978.00( due at time of Plat)

*Building Permit Fees ( due at time of building permit)*
Each Lot (Lots 1-11 Owners) X $ 5.51 sqft
1/9/2019 4:26:04 PM
EPC Environmental Services
1/9/2019 2:00:47 PM
Environmental has no further comment. 1/9/2019 2:00:47 PM