6/18/2025 8:06:51 AM
|
Submission request sent to Applicant
|
6/5/2025 2:47:14 PM
|
Submission request sent to Applicant
|
6/5/2025 2:45:16 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/5/2025 12:15:36 PM
|
Request for Review Comments returned by USAFA Base Planner
|
6/4/2025 1:58:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/3/2025 4:13:43 PM
|
Request for Review Comments email resent for Project Urban Landing Filing No. 1 Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
6/3/2025 3:21:18 PM
|
Request for Review Comments returned by USAFA Base Planner
|
6/3/2025 3:09:21 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/2/2025 10:22:56 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/22/2025 2:22:19 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Sabrina Untal on behalf of USAFA Base Planner
|
5/22/2025 2:22:18 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
5/22/2025 2:22:17 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Amy Kelley on behalf of USAFA Base Planner
|
5/22/2025 2:22:16 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of USAFA Base Planner
|
5/22/2025 2:22:15 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
5/22/2025 2:22:14 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
5/22/2025 2:22:13 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
5/22/2025 2:22:12 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
5/22/2025 2:22:10 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
5/22/2025 2:22:09 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/22/2025 2:22:07 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
5/22/2025 2:19:47 PM
|
Submission Triaged
|
5/22/2025 1:07:22 PM
|
Submission received from Applicant
|
4/18/2025 1:26:38 PM
|
Submission request sent to Applicant
|
4/18/2025 12:29:54 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/18/2025 8:51:30 AM
|
Submission request sent to Applicant
|
4/18/2025 8:50:46 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/17/2025 5:07:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/16/2025 3:46:55 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/16/2025 1:25:20 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/10/2025 12:07:01 PM
|
Request for Review Comments returned by USAFA Base Planner
|
4/9/2025 10:16:02 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/1/2025 10:35:43 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/28/2025 11:43:21 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Sabrina Untal on behalf of USAFA Base Planner
|
3/28/2025 11:43:20 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
3/28/2025 11:43:19 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Amy Kelley on behalf of USAFA Base Planner
|
3/28/2025 11:43:18 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of USAFA Base Planner
|
3/28/2025 11:43:16 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
3/28/2025 11:43:15 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2025 11:43:14 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2025 11:43:13 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2025 11:43:12 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/28/2025 11:43:11 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/28/2025 11:43:10 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/28/2025 11:43:09 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of EPC Parks Department
|
3/28/2025 11:43:08 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
3/28/2025 11:43:07 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
3/28/2025 11:43:06 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
3/28/2025 11:43:03 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
3/28/2025 11:43:02 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/28/2025 11:43:00 AM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
3/28/2025 11:40:16 AM
|
Submission Triaged
|
3/28/2025 8:20:51 AM
|
Submission received from Applicant
|
2/14/2025 4:15:29 PM
|
Submission request sent to Applicant
|
2/14/2025 2:53:11 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/13/2025 4:34:02 PM
|
Request for Review Comments email resent for Project Urban Landing Filing No. 1 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
2/13/2025 3:04:01 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/12/2025 4:13:11 PM
|
Request for Review Comments returned by Parks Advisory Board
|
2/12/2025 3:12:44 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/12/2025 1:59:58 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/12/2025 10:59:40 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/12/2025 8:45:17 AM
|
Request for Review Comments returned by USAFA Base Planner
|
2/11/2025 5:45:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/11/2025 2:30:29 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/10/2025 3:06:05 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/6/2025 1:44:09 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/31/2025 6:48:02 PM
|
Request for Review Comments returned by EPC Health Department
|
1/30/2025 11:18:53 AM
|
Request for Review Comments returned by Donald Wescott Fire Protection District
|
1/27/2025 11:56:47 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/24/2025 9:20:59 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/22/2025 7:06:13 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
1/21/2025 2:41:20 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/21/2025 1:58:51 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Sabrina Untal on behalf of USAFA Base Planner
|
1/21/2025 1:58:50 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
1/21/2025 1:58:49 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Amy Kelley on behalf of USAFA Base Planner
|
1/21/2025 1:58:48 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of USAFA Base Planner
|
1/21/2025 1:58:47 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
1/21/2025 1:58:46 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/21/2025 1:58:45 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of Monument
|
1/21/2025 1:58:43 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:42 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:41 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:40 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Erica Carter on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:39 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:38 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:37 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:36 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Billy Richard on behalf of El Paso County Conservation Dist
|
1/21/2025 1:58:34 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Jonathan Bradley on behalf of Donald Wescott Fire Protection District
|
1/21/2025 1:58:33 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Jeff Hodge on behalf of Donala Water and San Dist
|
1/21/2025 1:58:32 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Christina Hawker on behalf of Donala Water and San Dist
|
1/21/2025 1:58:31 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
1/21/2025 1:58:30 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
1/21/2025 1:58:29 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
1/21/2025 1:58:28 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
1/21/2025 1:58:26 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
1/21/2025 1:58:25 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
1/21/2025 1:58:24 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
1/21/2025 1:58:23 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
1/21/2025 1:58:22 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/21/2025 1:58:21 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/21/2025 1:58:19 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/21/2025 1:58:18 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 1:58:17 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 1:58:16 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/21/2025 1:58:15 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of Parks Advisory Board
|
1/21/2025 1:58:14 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/21/2025 1:58:13 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/21/2025 1:58:12 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
1/21/2025 1:58:11 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
1/21/2025 1:58:10 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
1/21/2025 1:58:09 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
1/21/2025 1:58:07 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of EPC Public Works, County Engineer
|
1/21/2025 1:58:06 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of EPC Public Works, County Engineer
|
1/21/2025 1:58:05 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by on behalf of EPC Parks Department
|
1/21/2025 1:58:04 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Mike McCarthy on behalf of EPC Health Department
|
1/21/2025 1:58:03 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
1/21/2025 1:58:02 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
|
1/21/2025 1:58:01 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/21/2025 1:57:59 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
1/21/2025 1:57:58 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
1/21/2025 1:57:57 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
1/21/2025 1:57:55 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
1/21/2025 1:57:54 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/21/2025 1:57:53 PM
|
Request for Review Comments email sent for Project Urban Landing Filing No. 1 Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
1/21/2025 11:40:57 AM
|
Fees paid: 1/21/2025 (Receipt: 1010071)
|
1/10/2025 11:29:32 AM
|
Payment Request sent: 1/10/2025
|
1/10/2025 11:29:32 AM
|
File # Assigned: SF252
|
1/10/2025 11:29:28 AM
|
Submission Triaged
|
1/10/2025 8:53:55 AM
|
Submission received from Applicant
|
12/13/2024 4:03:19 PM
|
Submission request sent to Applicant
|
12/6/2024 8:59:30 AM
|
Submission request sent to Applicant
|
12/6/2024 8:37:06 AM
|
Project Manager Assigned: Ryan Howser
|
12/6/2024 8:37:05 AM
|
EA Assigned: EA23104
|
12/6/2024 8:37:05 AM
|
Project Created
|