| 10/29/2025 11:11:36 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 10/29/2025 11:11:35 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 10/29/2025 11:11:34 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 10/29/2025 10:23:10 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 10/9/2025 11:01:42 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 10/9/2025 10:54:48 AM | Request for Review Comments email resent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 10/9/2025 10:31:26 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 10/8/2025 8:12:57 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 10/8/2025 8:12:56 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 10/8/2025 8:12:55 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 10/8/2025 8:12:22 AM | Submission Triaged | 
                
                    | 10/8/2025 8:00:19 AM | Submission received from Applicant | 
                
                    | 10/8/2025 7:54:54 AM | Submission request sent to Applicant | 
                
                    | 10/6/2025 3:09:23 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 10/1/2025 4:35:13 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 10/1/2025 4:35:12 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 10/1/2025 4:35:11 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 10/1/2025 4:33:59 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 10/1/2025 4:33:21 PM | Submission Triaged | 
                
                    | 10/1/2025 2:11:25 PM | Submission received from Applicant | 
                
                    | 10/1/2025 1:15:32 PM | Submission request sent to Applicant | 
                
                    | 10/1/2025 1:14:48 PM | Submission request canceled | 
                
                    | 9/24/2025 10:19:45 AM | Submission request sent to Applicant | 
                
                    | 9/24/2025 10:04:33 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 9/22/2025 11:24:48 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Sabrina Untal on behalf of USAFA Base Planner | 
                
                    | 9/22/2025 11:24:47 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Matthew Fitzsimmons on behalf of USAFA Base Planner | 
                
                    | 9/22/2025 11:24:46 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Amy Kelley on behalf of USAFA Base Planner | 
                
                    | 9/22/2025 11:24:45 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of USAFA Base Planner | 
                
                    | 9/17/2025 2:38:06 PM | Submission request sent to Applicant | 
                
                    | 9/17/2025 2:36:43 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/17/2025 12:07:47 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 9/17/2025 8:26:06 AM | Submission request sent to Applicant | 
                
                    | 9/17/2025 8:23:00 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/17/2025 8:00:23 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/17/2025 7:30:45 AM | Request for Review Comments email resent for Project Gleneagle View Final Plat  for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/16/2025 5:00:58 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/16/2025 3:56:19 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/16/2025 2:44:28 PM | Request for Review Comments email resent for Project Gleneagle View Final Plat  for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 9/16/2025 2:24:37 PM | Request for Review Comments returned by USAFA Base Planner | 
                
                    | 9/16/2025 10:46:27 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/12/2025 12:51:28 PM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 9/11/2025 12:26:51 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 9/2/2025 8:19:22 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Sabrina Untal on behalf of USAFA Base Planner | 
                
                    | 9/2/2025 8:19:21 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Matthew Fitzsimmons on behalf of USAFA Base Planner | 
                
                    | 9/2/2025 8:19:20 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Amy Kelley on behalf of USAFA Base Planner | 
                
                    | 9/2/2025 8:19:19 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of USAFA Base Planner | 
                
                    | 9/2/2025 8:19:18 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 9/2/2025 8:19:17 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 9/2/2025 8:19:16 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources | 
                
                    | 9/2/2025 8:19:14 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 9/2/2025 8:19:13 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 9/2/2025 8:19:12 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 9/2/2025 8:19:11 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 9/2/2025 8:19:10 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 8:19:09 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 8:19:08 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 8:19:07 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 8:19:06 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 9/2/2025 8:19:05 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 9/2/2025 8:19:04 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 9/2/2025 8:19:03 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 9/2/2025 8:19:02 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 9/2/2025 8:19:01 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 9/2/2025 8:19:00 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/2/2025 8:18:58 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 9/2/2025 8:18:56 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/2/2025 8:15:06 AM | Submission Triaged | 
                
                    | 8/28/2025 5:31:42 PM | Submission received from Applicant | 
                
                    | 8/20/2025 9:37:32 AM | Submission request sent to Applicant | 
                
                    | 8/13/2025 9:29:25 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/13/2025 9:27:31 AM | Request for Review Comments email resent for Project Gleneagle View Final Plat  for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/8/2025 1:26:08 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 8/8/2025 11:49:21 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 8/7/2025 3:38:49 PM | Submission request sent to Applicant | 
                
                    | 8/7/2025 2:05:14 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/7/2025 7:58:59 AM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 8/6/2025 7:31:53 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/6/2025 5:35:40 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/6/2025 2:52:35 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 8/6/2025 2:25:58 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 8/6/2025 11:14:38 AM | Request for Review Comments returned by USAFA Base Planner | 
                
                    | 8/4/2025 9:19:03 AM | Fees paid: 8/4/2025 (Receipt: 1010863) | 
                
                    | 7/31/2025 3:30:46 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 7/25/2025 3:41:18 PM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/23/2025 1:55:16 PM | Payment Request sent: 7/23/2025 | 
                
                    | 7/23/2025 10:30:08 AM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 7/23/2025 8:41:10 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 7/23/2025 8:39:26 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Sabrina Untal on behalf of USAFA Base Planner | 
                
                    | 7/23/2025 8:39:25 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Matthew Fitzsimmons on behalf of USAFA Base Planner | 
                
                    | 7/23/2025 8:39:24 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Amy Kelley on behalf of USAFA Base Planner | 
                
                    | 7/23/2025 8:39:23 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of USAFA Base Planner | 
                
                    | 7/23/2025 8:39:22 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/23/2025 8:39:21 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/23/2025 8:39:20 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 7/23/2025 8:39:18 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources | 
                
                    | 7/23/2025 8:39:17 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 7/23/2025 8:39:16 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 7/23/2025 8:39:15 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 7/23/2025 8:39:14 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 7/23/2025 8:39:13 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 7/23/2025 8:39:12 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 7/23/2025 8:39:11 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 7/23/2025 8:39:10 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 7/23/2025 8:39:09 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 7/23/2025 8:39:08 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 7/23/2025 8:39:07 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 7/23/2025 8:39:05 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/23/2025 8:39:04 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 7/23/2025 8:39:03 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 7/23/2025 8:39:02 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 7/23/2025 8:39:00 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 7/23/2025 8:38:58 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 7/23/2025 8:38:57 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of PCD Administrative Notice | 
                
                    | 7/23/2025 8:25:32 AM | Submission Triaged | 
                
                    | 7/23/2025 8:20:51 AM | Submission received from Applicant | 
                
                    | 7/2/2025 11:37:59 AM | Submission request sent to Applicant | 
                
                    | 6/11/2025 1:22:55 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 5/22/2025 3:52:55 PM | Project Manager Assigned: Joe Letke | 
                
                    | 5/22/2025 11:18:31 AM | Request for Review Comments email resent for Project Gleneagle View Final Plat  for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 5/22/2025 9:19:24 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 5/12/2025 3:10:24 PM | Request for Review Comments returned by Colorado Springs Planning & Community Development | 
                
                    | 5/8/2025 1:02:03 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 5/2/2025 1:37:40 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 5/1/2025 2:19:01 PM | Submission request sent to Applicant | 
                
                    | 5/1/2025 2:17:20 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 5/1/2025 1:36:29 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 5/1/2025 12:17:59 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 4/30/2025 5:04:42 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/30/2025 10:32:27 AM | Request for Review Comments returned by USAFA Base Planner | 
                
                    | 4/28/2025 11:16:44 AM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 4/24/2025 2:38:06 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 4/24/2025 11:36:26 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 4/21/2025 7:20:49 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 4/17/2025 1:16:58 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Sabrina Untal on behalf of USAFA Base Planner | 
                
                    | 4/17/2025 1:16:57 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Matthew Fitzsimmons on behalf of USAFA Base Planner | 
                
                    | 4/17/2025 1:16:56 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Amy Kelley on behalf of USAFA Base Planner | 
                
                    | 4/17/2025 1:16:55 PM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of USAFA Base Planner | 
                
                    | 4/17/2025 10:21:07 AM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 4/17/2025 7:42:10 AM | Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District | 
                
                    | 4/16/2025 11:03:23 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 4/16/2025 11:02:38 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 4/15/2025 1:39:59 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/14/2025 12:33:48 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 4/14/2025 7:50:56 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 4/11/2025 11:07:33 AM | Request for Review Comments returned by Schriever AFB | 
                
                    | 4/10/2025 12:15:09 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 4/10/2025 11:50:05 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District | 
                
                    | 4/10/2025 11:50:05 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District | 
                
                    | 4/10/2025 11:50:03 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Darren Horstmeier on behalf of Schriever AFB | 
                
                    | 4/10/2025 11:50:02 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 4/10/2025 11:50:01 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:50:00 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:59 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:58 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:57 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:56 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:55 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:54 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 4/10/2025 11:49:52 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Jeff Hodge on behalf of Donala Water and San Dist | 
                
                    | 4/10/2025 11:49:51 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Christina Hawker on behalf of Donala Water and San Dist | 
                
                    | 4/10/2025 11:49:50 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 4/10/2025 11:49:49 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 4/10/2025 11:49:48 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development | 
                
                    | 4/10/2025 11:49:47 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Drew Fox on behalf of Colorado Springs Planning & Community Development | 
                
                    | 4/10/2025 11:49:46 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 4/10/2025 11:49:45 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 4/10/2025 11:49:44 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 4/10/2025 11:49:43 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 4/10/2025 11:49:42 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 4/10/2025 11:49:41 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 4/10/2025 11:49:40 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 4/10/2025 11:49:38 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 4/10/2025 11:49:37 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 4/10/2025 11:49:36 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 4/10/2025 11:49:35 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 4/10/2025 11:49:34 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/10/2025 11:49:33 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/10/2025 11:49:32 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/10/2025 11:49:31 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 4/10/2025 11:49:29 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 4/10/2025 11:49:28 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 4/10/2025 11:49:27 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 4/10/2025 11:49:26 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 4/10/2025 11:49:25 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 4/10/2025 11:49:24 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 4/10/2025 11:49:23 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 4/10/2025 11:49:22 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/10/2025 11:49:21 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/10/2025 11:49:20 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/10/2025 11:49:18 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of Parks Advisory Board | 
                
                    | 4/10/2025 11:49:17 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 4/10/2025 11:49:16 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 4/10/2025 11:49:15 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 4/10/2025 11:49:14 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 4/10/2025 11:49:13 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 4/10/2025 11:49:12 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 4/10/2025 11:49:11 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 4/10/2025 11:49:10 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 4/10/2025 11:49:09 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 4/10/2025 11:49:07 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by  on behalf of EPC Parks Department | 
                
                    | 4/10/2025 11:49:06 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 4/10/2025 11:49:05 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 4/10/2025 11:49:04 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 4/10/2025 11:49:03 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 4/10/2025 11:49:02 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 4/10/2025 11:49:01 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 4/10/2025 11:49:00 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Water | 
                
                    | 4/10/2025 11:48:59 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 4/10/2025 11:48:57 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 4/10/2025 11:48:56 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 4/10/2025 11:48:55 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 4/10/2025 11:48:53 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 4/10/2025 11:48:52 AM | Request for Review Comments email sent for Project Gleneagle View Final Plat  for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 4/8/2025 8:54:20 AM | Fees paid: 4/8/2025 (Receipt: 1010392) | 
                
                    | 3/21/2025 2:54:21 PM | Payment Request sent: 3/21/2025 | 
                
                    | 3/21/2025 2:54:21 PM | File # Assigned: SF2510 | 
                
                    | 3/21/2025 2:54:15 PM | Submission Triaged | 
                
                    | 3/20/2025 10:51:07 AM | Submission received from Applicant | 
                
                    | 9/3/2024 10:57:24 AM | Submission request sent to Applicant | 
                
                    | 9/3/2024 8:46:59 AM | Project Manager Assigned: Ashlyn Mathy | 
                
                    | 9/3/2024 8:46:59 AM | EA Assigned: EA2496 | 
                
                    | 9/3/2024 8:46:59 AM | Project Created |